- Hours of operation
- Opening timeline
- Route
- References
{{one source|date=July 2016}}{{Infobox rail line | name = | logo = {{huge|{{rint|kunming|1}}}}{{huge|{{rint|kunming|2}}}} | logo_width = | color = {{KunmingRT color|1}} | color2 = {{KunmingRT color|2}} | image = New Asia Athletics Park Station at Night.jpg | image_width = 265px | image_alt = | caption = | type = Rapid transit | system = Kunming Metro | status = Operational | locale = Kunming, China | start = {{KunmingRT stations|North Bus Station}} | end = {{KunmingRT stations|University Town South}} | stations = 35 | routes = | daily_ridership = | open = | close = | owner = | operator = Kunming Rail Transit Corp., Ltd | character = | depot = | stock = | linelength = {{convert|22.1|km|mi|2|abbr=on}} | tracklength = | tracks = 2 | gauge = {{track gauge|sg}} | electrification = | speed = | elevation = | website = | map = | map_state = collapsed }}The Line 1/2 of the Kunming Metro ({{zh|s=昆明轨道交通1/2号线|p=Kūnmíng Guǐdào Jiāotōng Yī/Èr Hào Xiàn}}) is an elevated Metro line that connects the Chenggong with Kunming's urban center. The line is {{convert|40.4|km|mi}} long and currently has thirty-one stops with the {{KunmingRT stations|North Bus Station}} as the northern terminal, and {{KunmingRT stations|University Town South}} as the southern terminal. The line entered into operation on 20 May 2013. On subway maps, the Line's color is {{Color box|#{{KunmingRT color|1}}|border=darkgray}} red/{{Color box|#{{KunmingRT color|2}}|border=darkgray}} blue. Line 1/2 will be split into two operational lines once Line 1 (phase 3) and Line 2 (phase 2) is completed. Hours of operationFrom 2013, the hours of operation for line 1, from 6:00 AM to 12:00 midnight daily with an 8 minutes interval frequency. Line 1/2 trains travels at speeds of up to {{convert|80|km/h|mph}}. On the initial operation one-way trip will take approximately 34 minutes.[1] Opening timeline- Line 1
Segment | Commencement | Length | Station(s) | Name | Xiaodongcun — University Town South | 20 May 2013 | 22.1|km|mi|2|abbr=on}} | 12 | Phase 1 (southern section) | South Ring Rd — Xiaodongcun | 30 April 2014 | 6.9|km|mi|2|abbr=on}} | 6 | Phase 1 (northern section) | Chunrong Street — Kunming South | 28 December 2016 | 4.7|km|mi|2|abbr=on}} | 4 | Kunming South connector project |
- Line 2
Segment | Date opened | Length | Station(s) | Name | North Bus station — South Ring Rd | 30 April 2014 | 11.4|km|mi|2|abbr=on}} | 14 | Phase 1 |
RouteLine 1/2 runs back and forth between Panlong and Chenggong. | station name | Connections | Distance {{small|km | Location | English | Chinese |
---|
| ● | ● | North Bus Station}} | {{lang|zh-cn|北部汽车站}}}} | 0.00 | 0.00 | Panlong | ● | ● | Longtou Street}} | {{lang|zh-cn|龙头街}}}} | 1.13 | 1.13 | ● | ● | Sijiaying}} | {{lang|zh-cn|司家营}}}} | 1.18 | 2.31 | ● | ● | Yangchangcun}} | {{lang|zh-cn|羊肠村}}}} | 1.00 | 3.31 | ● | ● | Linyuqiao}} | {{lang|zh-cn|霖雨桥}}}} | 0.93 | 4.24 | ● | ● | Beichen}} | {{lang|zh-cn|北辰}}}} | 1.54 | 5.78 | ● | ● | Jinxing}} | {{lang|zh-cn|金星}}}} | 0.73 | 6.51 | ● | ● | Baiyun Road}} | {{lang|zh-cn|白云路}}}} | 1.18 | 7.69 | ● | ● | Kunming North}} | {{lang|zh-cn|火车北站}}}} | cn|rail|link=Kunming North railway station}} KBM | 1.08 | 8.77 | ● | ● | Chuanxin Gulou}} | {{lang|zh-cn|穿心鼓楼}}}} | 0.80 | 9.57 | ● | ● | Jiaosanqiao}} | {{lang|zh-cn|交三桥}}}} | 0.80 | 10.37 | ● | ● | Dongfeng Square}} | {{lang|zh-cn|东风广场}}}} | kunming|3}} | 0.49 | 10.86 | ● | ● | Tangzixiang}} | {{lang|zh-cn|塘子巷}}}} | 0.58 | 11.44 | Panlong/Guandu | | | | ● | ● | South Ring Road}} | {{lang|zh-cn|环城南路}}}} | kunming|1}}{{rint|kunming|2}}{{efn|Line 1/2 will be split into two operational lines once Line 1 (phase 3) and Line 2 (phase 2) is completed.}} | 0.95 | 12.39 | | | | | ● | ● | Kunming}} | {{lang|zh-cn|昆明火车站}}}} | cn|rail|link=Kunming railway station}} KMM | 1.27 | 13.66 | Guandu | ● | ● | Fude}} | {{lang|zh-cn|福德}}}} | 1.03 | 14.69 | ● | ● | Rixin Road}} | {{lang|zh-cn|日新路}}}} | 0.82 | 15.51 | ● | ● | Wujiaba}} | {{lang|zh-cn|巫家坝}}}} | 0.88 | 16.39 | ● | ● | Changhong West Road}} | {{lang|zh-cn|昌宏西路}}}} | 1.57 | 17.96 | ● | ● | Xiaodongcun}} | {{lang|zh-cn|晓东村}}}} | 1.08 | 19.04 | ● | ● | Erji Road}} | {{lang|zh-cn|珥季路}}}} | 1.74 | 20.78 | ● | ● | Xingyao Road}} | {{lang|zh-cn|星耀路}}}} | 1.74 | 22.52 | ● | ● | New Asia Athletics Park}} | {{lang|zh-cn|新亚洲体育城}}}} | 1.11 | 23.63 | ● | ● | South Bus Station}} | {{lang|zh-cn|南部汽车站}}}} | 2.05 | 25.68 | ● | ● | Dounan}} | {{lang|zh-cn|斗南}}}} | 3.01 | 28.69 | Chenggong | ● | ● | Chunrong Street}} | {{lang|zh-cn|春融街}}}} | 4.51 | 33.2 | ● | ❘ | Tuofeng Street}} | {{lang|zh-cn|驼峰街}}}} | 1.33 | 34.53 | ● | ❘ | Lianda Street}} | {{lang|zh-cn|联大街}}}} | 1.47 | 36.00 | ● | ❘ | Yikang South Road}} | {{lang|zh-cn|谊康南路}}}} | 1.42 | 37.42 | ● | ❘ | University Town}} | {{lang|zh-cn|大学城}}}} | 1.37 | 38.79 | ● | ❘ | University Town South}} | {{lang|zh-cn|大学城南}}}} | 2.36 | 41.15 | | | ● | Municipal Administration Center}} | {{lang|zh-cn|市级行政中心清风}}}} | 1.25 | 42.40 | Chenggong | | ● | Yihe Road}} | {{lang|zh-cn|宜和路}}}} | 0.89 | 43.29 | | ● | Bailongtan}} | {{lang|zh-cn|白龙潭}}}} | 1.88 | 45.17 | | ● | Kunming South}} | {{lang|zh-cn|昆明南火车站}}}} | cn|rail|link=Kunming South railway station}} KOM | 1.25 | 46.42 | | {{notelist}} References 1. ^{{cite web|title=昆明地铁首期南段5月20日试运营|url=http://news.kunming.cn/km-news/content/2013-05/18/content_3297265.htm|work=昆明信息港网|publisher=昆明信息港网|accessdate=21 May 2013}}
{{Yunnan transit}}{{DEFAULTSORT:Kunming Rail Transit, Line 01}} 3 : Railway lines opened in 2013|Kunming Metro|2013 establishments in China |