请输入您要查询的百科知识:

 

词条 Line 1 (Kunming Metro)
释义

  1. Hours of operation

  2. Opening timeline

  3. Route

  4. References

{{one source|date=July 2016}}{{Infobox rail line
| name =
| logo = {{huge|{{rint|kunming|1}}}}{{huge|{{rint|kunming|2}}}}
| logo_width =
| color = {{KunmingRT color|1}}
| color2 = {{KunmingRT color|2}}
| image = New Asia Athletics Park Station at Night.jpg
| image_width = 265px
| image_alt =
| caption =
| type = Rapid transit
| system = Kunming Metro
| status = Operational
| locale = Kunming, China
| start = {{KunmingRT stations|North Bus Station}}
| end = {{KunmingRT stations|University Town South}}
| stations = 35
| routes =
| daily_ridership =
| open =
| close =
| owner =
| operator = Kunming Rail Transit Corp., Ltd
| character =
| depot =
| stock =
| linelength = {{convert|22.1|km|mi|2|abbr=on}}
| tracklength =
| tracks = 2
| gauge = {{track gauge|sg}}
| electrification =
| speed =
| elevation =
| website =
| map =
| map_state = collapsed
}}

The Line 1/2 of the Kunming Metro ({{zh|s=昆明轨道交通1/2号线|p=Kūnmíng Guǐdào Jiāotōng Yī/Èr Hào Xiàn}}) is an elevated Metro line that connects the Chenggong with Kunming's urban center. The line is {{convert|40.4|km|mi}} long and currently has thirty-one stops with the {{KunmingRT stations|North Bus Station}} as the northern terminal, and {{KunmingRT stations|University Town South}} as the southern terminal. The line entered into operation on 20 May 2013. On subway maps, the Line's color is {{Color box|#{{KunmingRT color|1}}|border=darkgray}} red/{{Color box|#{{KunmingRT color|2}}|border=darkgray}} blue. Line 1/2 will be split into two operational lines once Line 1 (phase 3) and Line 2 (phase 2) is completed.

Hours of operation

From 2013, the hours of operation for line 1, from 6:00 AM to 12:00 midnight daily with an 8 minutes interval frequency.

Line 1/2 trains travels at speeds of up to {{convert|80|km/h|mph}}. On the initial operation one-way trip will take approximately 34 minutes.[1]

Opening timeline

Line 1
SegmentCommencementLengthStation(s)Name
Xiaodongcun — University Town South 20 May 201322.1|km|mi|2|abbr=on}} 12Phase 1 (southern section)
South Ring Rd — Xiaodongcun 30 April 20146.9|km|mi|2|abbr=on}} 6Phase 1 (northern section)
Chunrong Street — Kunming South 28 December 20164.7|km|mi|2|abbr=on}} 4Kunming South connector project
Line 2
SegmentDate openedLengthStation(s)Name
North Bus station — South Ring Rd 30 April 201411.4|km|mi|2|abbr=on}} 14Phase 1

Route

Line 1/2 runs back and forth between Panlong and Chenggong.

station nameConnectionsDistance
{{small|km
Location
EnglishChinese
North Bus Station}}{{lang|zh-cn|北部汽车站}}}}0.000.00Panlong
Longtou Street}}{{lang|zh-cn|龙头街}}}}1.131.13
Sijiaying}}{{lang|zh-cn|司家营}}}}1.182.31
Yangchangcun}}{{lang|zh-cn|羊肠村}}}}1.003.31
Linyuqiao}}{{lang|zh-cn|霖雨桥}}}}0.934.24
Beichen}}{{lang|zh-cn|北辰}}}}1.545.78
Jinxing}}{{lang|zh-cn|金星}}}}0.736.51
Baiyun Road}}{{lang|zh-cn|白云路}}}}1.187.69
Kunming North}}{{lang|zh-cn|火车北站}}}}cn|rail|link=Kunming North railway station}} KBM1.088.77
Chuanxin Gulou}}{{lang|zh-cn|穿心鼓楼}}}}0.809.57
Jiaosanqiao}}{{lang|zh-cn|交三桥}}}}0.8010.37
Dongfeng Square}}{{lang|zh-cn|东风广场}}}}kunming|3}}0.4910.86
Tangzixiang}}{{lang|zh-cn|塘子巷}}}}0.5811.44Panlong/Guandu
South Ring Road}}{{lang|zh-cn|环城南路}}}}kunming|1}}{{rint|kunming|2}}{{efn|Line 1/2 will be split into two operational lines once Line 1 (phase 3) and Line 2 (phase 2) is completed.}}0.9512.39
Kunming}}{{lang|zh-cn|昆明火车站}}}}cn|rail|link=Kunming railway station}} KMM1.2713.66Guandu
Fude}}{{lang|zh-cn|福德}}}}1.0314.69
Rixin Road}}{{lang|zh-cn|日新路}}}}0.8215.51
Wujiaba}}{{lang|zh-cn|巫家坝}}}}0.8816.39
Changhong West Road}}{{lang|zh-cn|昌宏西路}}}}1.5717.96
Xiaodongcun}}{{lang|zh-cn|晓东村}}}}1.0819.04
Erji Road}}{{lang|zh-cn|珥季路}}}}1.7420.78
Xingyao Road}}{{lang|zh-cn|星耀路}}}}1.7422.52
New Asia Athletics Park}}{{lang|zh-cn|新亚洲体育城}}}}1.1123.63
South Bus Station}}{{lang|zh-cn|南部汽车站}}}}2.0525.68
Dounan}}{{lang|zh-cn|斗南}}}}3.0128.69Chenggong
Chunrong Street}}{{lang|zh-cn|春融街}}}}4.5133.2
Tuofeng Street}}{{lang|zh-cn|驼峰街}}}}1.3334.53
Lianda Street}}{{lang|zh-cn|联大街}}}}1.4736.00
Yikang South Road}}{{lang|zh-cn|谊康南路}}}}1.4237.42
University Town}}{{lang|zh-cn|大学城}}}}1.3738.79
University Town South}}{{lang|zh-cn|大学城南}}}}2.3641.15
Municipal Administration Center}}{{lang|zh-cn|市级行政中心清风}}}}1.2542.40Chenggong
Yihe Road}}{{lang|zh-cn|宜和路}}}}0.8943.29
Bailongtan}}{{lang|zh-cn|白龙潭}}}}1.8845.17
Kunming South}}{{lang|zh-cn|昆明南火车站}}}}cn|rail|link=Kunming South railway station}} KOM1.2546.42
{{notelist}}

References

1. ^{{cite web|title=昆明地铁首期南段5月20日试运营|url=http://news.kunming.cn/km-news/content/2013-05/18/content_3297265.htm|work=昆明信息港网|publisher=昆明信息港网|accessdate=21 May 2013}}
{{Yunnan transit}}{{DEFAULTSORT:Kunming Rail Transit, Line 01}}

3 : Railway lines opened in 2013|Kunming Metro|2013 establishments in China

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/23 18:24:36