| name = Line 1 | image = | image_width = | caption = | type = Rapid Transit | system = Navi Mumbai Metro | status = Under construction | locale = Navi Mumbai, Maharashtra, India | start = Belapur | end = Khandeshwar | stations = 20 | daily_ridership = | open = April 2020 | close = | owner = CIDCO | operator = | character = Elevated | depot = | stock = China Railway Rolling Stock Corporation (CRRC)[1] | minradius = | linelength_km = 23.4 | tracklength_km = | gauge = {{RailGauge|1435mm}} standard gauge | electrification = 25 kV, 50 Hz AC Overhead catenary[2] | speed = 32 km/h[3] | elevation = | map = | map_state = }} Line 1 of the Navi Mumbai Metro is part of the rapid transit rail system for the city of Navi Mumbai, India. The 23.40 km line consists of 20 metro stations from Belapur to Khandeshwar. It is expected to cost {{INRConvert|4163|c}}. HistoryThe following dates represent the dates the section opened to the public, not the private inauguration.
BackgroundThe feasibility study for the Navi Mumbai Metro was carried out by the Delhi Metro Rail Corporation (DMRC). CIDCO was authorised as the implementing agency of the Belapur-Pendhar-Kalamboli-Khandeshwar line, under the Indian Tramway Act 1886, by the Government of Maharashtra on 30 September 2010.[4][5] The state government later asked the CIDCO to implement the Navi Mumbai Metro project under the Central Metro Act.[6] The detailed master plan for Line 1 was prepared by the DMRC. The proposed route will link Belapur, Kharghar, Taloje, MIDC, Kalamboli and the Khandeshwar railway station, terminating at the proposed Navi Mumbai International Airport.[7] ConstructionThe metro's foundation stone was laid on 1 May 2011 by Chief Minister Prithviraj Chavan, and general foundation work on the system's first phase commenced in October 2011.[8] Line 1's first girder was placed on 13 December 2012.[9][10] Line 1 is planned to be developed in 3 phases.[4]
CIDCO awarded the contract for civil works in Phase I to six firms. The contract for technical work was awarded to one firm, at an estimated cost of {{INRConvert|1020|c}}.[6] Spanish contractor San José Constructora will design and build five stations, located at Central Park, Pethpada, Sector 34, Panchanand and Pendhar.[11] In the second phase, an {{convert|8.15|km|mi|adj=on}} line will be built from Khandeshwar to Taloje MIDC, with seven stations. The third phase will entail the merging of two rail corridors between Pendhar and MIDC with a {{convert|2.2|km|mi|adj=on}} link, forming a loop from Belapur to Khandeshwar.[12][13] A maintenance depot will be constructed on a {{convert|20|acre|m2|adj=on}} plot at Taloja for the circular line, and a temporary maintenance depot will be constructed on five hectares of land at Khandeshwar.[7] Line 1 was expected to be completed by 2016 but its most likely to miss deadline, trains may roll out only by July 2017.[14] CIDCO has plans to extend Line 1 up to Kalyan-Ulhas Nagar-Murbad.[15] FundingPhase I of Line 1 was executed using CIDCO funds. The total cost of Line 1 is estimated to be {{INRConvert|4068|c}}.[4] StationsStage 1{{Routemap|title= Navi Mumbai Metro Line 1 |align=left |state=expanded |map= uexhKBHFa~~ ~~CBD Belapur uexhBHF~~ ~~Sector 7 uexhBHF~~ ~~CIDCO Science Park~~ ~~{{rint|rail|link=Kharghar railway station}} uexhBHF~~ ~~Utsav Chowk uexhBHF~~ ~~Sector 11 uexhBHF~~ ~~Sector 14 uexhBHF~~ ~~Central Park uexhBHF~~ ~~Pethpada uexhBHF~~ ~~Sector 34 uexhBHF~~ ~~Panchanand dWASSERq\\uexhKRZW\\dWASSERq~~ ~~ ~~Taloja River uexhKBHFe~~ ~~Pendhar }}
Stage 2
Stage 3Stage 3 involves the construction of a 2 km link and one station between Pendhar and MIDC, to join Stage 1 and Stage 2.[2] InfrastructureAn international consortium of companies including Ansaldo STS, Tata Projects and CSR Zhuzhou will provide the electrical and mechanical systems for the first phase of Line 1. Ansaldo will conduct systems integration and supply train control systems, telecoms, fare collection systems and equipment storage.[23] The metro's standard gauge network would be electrified at 25 kV AC, with power provided via an overhead catenary.[23] Rolling stockIn 2014, the Chinese company CSR Zhuzhou signed a contract with CIDCO to supply rolling stock for the first phase of the metro’s Line 1.[23] The three-car trainsets would be {{convert|64.6|m|ft}} long and {{convert|3.1|m|ft}} wide, with a passenger capacity of around 1,100 and a maximum speed of approximately {{convert|80|kph|mph}}.[26] The trains would feature stainless steel bodies, air-conditioning and LED lighting.[18][19] References1. ^{{cite web |last1=News |first1=Urban Transport |title=Navi Mumbai Metro receives two 3-coach metro trains |url=https://urbantransportnews.com/navi-mumbai-metro-receives-two-3-coach-metro-trains/ |website=Urban Transport News |accessdate=14 March 2019 |date=12 March 2019}} 2. ^1 CIDCO :: Stage-3 Page 3. ^CIDCO :: Technical_Parameters Page 4. ^1 2 CIDCO :: Introduction Page 5. ^"Cidco takes Navi Mumbai metro plan ahead". DNA India. 27 Mar 2012. Retrieved 5 April 2012. 6. ^1 Next metro only by 2016 | Latest News & Updates at Daily News & Analysis 7. ^1 {{cite web|url=http://www.worldsnap.com/news/city/mumbai/neither-objections-nor-any-suggestions-for-metro-project-74978.html |title=Neither objections nor any suggestions for metro project | Mumbai, World Snap |publisher=Worldsnap.com |year=2010 |accessdate=31 August 2010 |deadurl=yes |archiveurl=https://web.archive.org/web/20100714091048/http://www.worldsnap.com/news/city/mumbai/neither-objections-nor-any-suggestions-for-metro-project-74978.html |archivedate=14 July 2010 }} 8. ^"Work on first phase of Navi Mumbai Metro Rail begins". The Economic Times. 28 October 2011. Retrieved 30 October 2011. 9. ^"Boost for Navi Mumbai Metro". Times of India. 13 December 2012. Retrieved 21 December 2012. 10. ^"CIDCO places first girder". Indian Express. 13 December 2012. Retrieved 21 December 2012. 11. ^"Navi Mumbai metro tendering".Railway Gazette. 26 June 2012. Retrieved 15 July 2012. 12. ^[https://web.archive.org/web/20071016091022/http://cidcoindia.com/cidco/nmtransit.aspx "Railway projects"]. Cidco. Retrieved 5 April 2012. 13. ^{{cite news| url=http://articles.economictimes.indiatimes.com/2011-10-28/news/30332811_1_first-phase-navi-mumbai-metro-rail-pendhar | work=Times of India | title=Work on first phase of Navi Mumbai Metro Rail begins | date=28 October 2011}} 14. ^Metro likely to miss deadline again, trains may roll out only by July 2017 - Times of India 15. ^Survey soon to extend Metro rail to Kalyan - Times of India 16. ^CIDCO :: Stage-1 Page 17. ^CIDCO :: Stage-2 Page 18. ^1 {{cite news |url=http://www.mid-day.com/news/2012/feb/260212-CIDCO-opts-for-wider-metro-coaches.htm |title=CIDCO opts for wider metro coaches |newspaper=Mid-Day |publisher=Mid-Day Infomedia Ltd. |date=26 February 2012 |accessdate=5 April 2012}} 19. ^1 2 3 {{cite web|url=http://www.railwaygazette.com/news/news/asia/single-view/view/navi-mumbai-em-contract-awarded.html|title=Navi Mumbai metro E&M contract awarded|work=Railway Gazette|date=24 July 2014|accessdate=25 February 2015}} 3 : Rapid transit lines in India|Transport in Navi Mumbai|Navi Mumbai Metro |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||