请输入您要查询的百科知识:

 

词条 Line 1 (Navi Mumbai Metro)
释义

  1. History

     Background  Construction 

  2. Funding

  3. Stations

     Stage 1  Stage 2  Stage 3 

  4. Infrastructure

     Rolling stock 

  5. References

{{Use Indian English|date=September 2013}}{{Use dmy dates|date=September 2013}}{{Infobox rail line
| name = Line 1
| image =
| image_width =
| caption =
| type = Rapid Transit
| system = Navi Mumbai Metro
| status = Under construction
| locale = Navi Mumbai, Maharashtra, India
| start = Belapur
| end = Khandeshwar
| stations = 20
| daily_ridership =
| open = April 2020
| close =
| owner = CIDCO
| operator =
| character = Elevated
| depot =
| stock = China Railway Rolling Stock Corporation (CRRC)[1]
| minradius =
| linelength_km = 23.4
| tracklength_km =
| gauge = {{RailGauge|1435mm}} standard gauge
| electrification = 25 kV, 50 Hz AC Overhead catenary[2]
| speed = 32 km/h[3]
| elevation =
| map =
| map_state =
}}

Line 1 of the Navi Mumbai Metro is part of the rapid transit rail system for the city of Navi Mumbai, India. The 23.40 km line consists of 20 metro stations from Belapur to Khandeshwar. It is expected to cost {{INRConvert|4163|c}}.

History

The following dates represent the dates the section opened to the public, not the private inauguration.

History
Extension dateTerminiLengthStations
April 2020BelapurPendhar11.10|km|mi|sp=us}} 11
MIDC TalojaKhandeshwar10.30|km|mi|sp=us}} 8
PendharMIDC2|km|mi|sp=us}} 1
TotalBelapurKhandeshwar23.40|km|mi|sp=us 20

Background

The feasibility study for the Navi Mumbai Metro was carried out by the Delhi Metro Rail Corporation (DMRC). CIDCO was authorised as the implementing agency of the Belapur-Pendhar-Kalamboli-Khandeshwar line, under the Indian Tramway Act 1886, by the Government of Maharashtra on 30 September 2010.[4][5] The state government later asked the CIDCO to implement the Navi Mumbai Metro project under the Central Metro Act.[6] The detailed master plan for Line 1 was prepared by the DMRC. The proposed route will link Belapur, Kharghar, Taloje, MIDC, Kalamboli and the Khandeshwar railway station, terminating at the proposed Navi Mumbai International Airport.[7]

Construction

The metro's foundation stone was laid on 1 May 2011 by Chief Minister Prithviraj Chavan, and general foundation work on the system's first phase commenced in October 2011.[8] Line 1's first girder was placed on 13 December 2012.[9][10]

Line 1 is planned to be developed in 3 phases.[4]

PhaseTerminiLengthStationsCost
Phase I Belapur-Kharghar-Taloja-Pendhar11.10|km|mi}} 11 1985|c}}
Phase II MIDC Taloja-Kalamboli–Khandeshwar (extension to Airport proposed)10.30|km|mi}} 8 1509|c}}
Phase III Interlink between Pendhar and MIDC2|km|mi}} 1 574|c}}
Total 23.40|km|mi 20 4068|c

CIDCO awarded the contract for civil works in Phase I to six firms. The contract for technical work was awarded to one firm, at an estimated cost of {{INRConvert|1020|c}}.[6] Spanish contractor San José Constructora will design and build five stations, located at Central Park, Pethpada, Sector 34, Panchanand and Pendhar.[11] In the second phase, an {{convert|8.15|km|mi|adj=on}} line will be built from Khandeshwar to Taloje MIDC, with seven stations. The third phase will entail the merging of two rail corridors between Pendhar and MIDC with a {{convert|2.2|km|mi|adj=on}} link, forming a loop from Belapur to Khandeshwar.[12][13] A maintenance depot will be constructed on a {{convert|20|acre|m2|adj=on}} plot at Taloja for the circular line, and a temporary maintenance depot will be constructed on five hectares of land at Khandeshwar.[7]

Line 1 was expected to be completed by 2016 but its most likely to miss deadline, trains may roll out only by July 2017.[14] CIDCO has plans to extend Line 1 up to Kalyan-Ulhas Nagar-Murbad.[15]

Funding

Phase I of Line 1 was executed using CIDCO funds. The total cost of Line 1 is estimated to be {{INRConvert|4068|c}}.[4]

Stations

Stage 1

{{Routemap
|title= Navi Mumbai Metro Line 1
|align=left
|state=expanded
|map=

uexhKBHFa~~ ~~CBD Belapur

uexhBHF~~ ~~Sector 7

uexhBHF~~ ~~CIDCO Science Park~~ ~~{{rint|rail|link=Kharghar railway station}}

uexhBHF~~ ~~Utsav Chowk

uexhBHF~~ ~~Sector 11

uexhBHF~~ ~~Sector 14

uexhBHF~~ ~~Central Park

uexhBHF~~ ~~Pethpada

uexhBHF~~ ~~Sector 34

uexhBHF~~ ~~Panchanand

dWASSERq\\uexhKRZW\\dWASSERq~~ ~~ ~~Taloja River

uexhKBHFe~~ ~~Pendhar


}}
Line 1
# Station Name[16] Inter-station Distance (km) Cumulative Distance (km) Opening Connections
1CBD Belapur Terminal 0.06 0.06 Suburban Railway
2Sector 7, CBD Belapur 0.71 0.77 None
3CIDCO Science Park, Kharghar 1.27 2.04 None
4Utsav Chowk, Kharghar (through Skywalk) 1.37 3.41 Suburban Railway
5Sector 11, Kharghar0.71 4.12 None
6Sector 14, Kharghar 1 5.12 None
7Central Park, Kharghar 1 6.12 None
8Pethpada, Kharghar 1.32 7.44 None
9Sector 34, Kharghar 1.23 8.67 None
10Panchanand 1.48 10.67 Suburban Railway
11Pendhar Terminal 0.95 11.10 None

Stage 2

Line 1
# Station Name[17] Inter-station Distance (km) Cumulative Distance (km) Opening Connections
12Khandeshwar 0.10 0.10 Suburban Railway
13Sector 10, Kamothe 0.99 1.09 None
14Sector 2E, Kalamboli 1.01 2.10 None
15Sector 13, Kalamboli 0.77 2.87 None
16Sector 7E, Kalamboli 1.63 4.50 None
17Kasadi 1.15 5.65 None
18MIDC Station 1 1.20 6.85 None
19MIDC Station 2 1.50 8.35 None

Stage 3

Stage 3 involves the construction of a 2 km link and one station between Pendhar and MIDC, to join Stage 1 and Stage 2.[2]

Infrastructure

An international consortium of companies including Ansaldo STS, Tata Projects and CSR Zhuzhou will provide the electrical and mechanical systems for the first phase of Line 1. Ansaldo will conduct systems integration and supply train control systems, telecoms, fare collection systems and equipment storage.[23] The metro's standard gauge network would be electrified at 25 kV AC, with power provided via an overhead catenary.[23]

Rolling stock

In 2014, the Chinese company CSR Zhuzhou signed a contract with CIDCO to supply rolling stock for the first phase of the metro’s Line 1.[23] The three-car trainsets would be {{convert|64.6|m|ft}} long and {{convert|3.1|m|ft}} wide, with a passenger capacity of around 1,100 and a maximum speed of approximately {{convert|80|kph|mph}}.[26] The trains would feature stainless steel bodies, air-conditioning and LED lighting.[18][19]

References

1. ^{{cite web |last1=News |first1=Urban Transport |title=Navi Mumbai Metro receives two 3-coach metro trains |url=https://urbantransportnews.com/navi-mumbai-metro-receives-two-3-coach-metro-trains/ |website=Urban Transport News |accessdate=14 March 2019 |date=12 March 2019}}
2. ^CIDCO :: Stage-3 Page
3. ^CIDCO :: Technical_Parameters Page
4. ^CIDCO :: Introduction Page
5. ^"Cidco takes Navi Mumbai metro plan ahead". DNA India. 27 Mar 2012. Retrieved 5 April 2012.
6. ^Next metro only by 2016 | Latest News & Updates at Daily News & Analysis
7. ^{{cite web|url=http://www.worldsnap.com/news/city/mumbai/neither-objections-nor-any-suggestions-for-metro-project-74978.html |title=Neither objections nor any suggestions for metro project | Mumbai, World Snap |publisher=Worldsnap.com |year=2010 |accessdate=31 August 2010 |deadurl=yes |archiveurl=https://web.archive.org/web/20100714091048/http://www.worldsnap.com/news/city/mumbai/neither-objections-nor-any-suggestions-for-metro-project-74978.html |archivedate=14 July 2010 }}
8. ^"Work on first phase of Navi Mumbai Metro Rail begins". The Economic Times. 28 October 2011. Retrieved 30 October 2011.
9. ^"Boost for Navi Mumbai Metro". Times of India. 13 December 2012. Retrieved 21 December 2012.
10. ^"CIDCO places first girder". Indian Express. 13 December 2012. Retrieved 21 December 2012.
11. ^"Navi Mumbai metro tendering".Railway Gazette. 26 June 2012. Retrieved 15 July 2012.
12. ^[https://web.archive.org/web/20071016091022/http://cidcoindia.com/cidco/nmtransit.aspx "Railway projects"]. Cidco. Retrieved 5 April 2012.
13. ^{{cite news| url=http://articles.economictimes.indiatimes.com/2011-10-28/news/30332811_1_first-phase-navi-mumbai-metro-rail-pendhar | work=Times of India | title=Work on first phase of Navi Mumbai Metro Rail begins | date=28 October 2011}}
14. ^Metro likely to miss deadline again, trains may roll out only by July 2017 - Times of India
15. ^Survey soon to extend Metro rail to Kalyan - Times of India
16. ^CIDCO :: Stage-1 Page
17. ^CIDCO :: Stage-2 Page
18. ^{{cite news |url=http://www.mid-day.com/news/2012/feb/260212-CIDCO-opts-for-wider-metro-coaches.htm |title=CIDCO opts for wider metro coaches |newspaper=Mid-Day |publisher=Mid-Day Infomedia Ltd. |date=26 February 2012 |accessdate=5 April 2012}}
19. ^{{cite web|url=http://www.railwaygazette.com/news/news/asia/single-view/view/navi-mumbai-em-contract-awarded.html|title=Navi Mumbai metro E&M contract awarded|work=Railway Gazette|date=24 July 2014|accessdate=25 February 2015}}

3 : Rapid transit lines in India|Transport in Navi Mumbai|Navi Mumbai Metro

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 6:51:14