词条 | Shearon Harris Nuclear Power Plant | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
释义 |
| name = Shearon Harris Nuclear Power Plant | name_official = | image = Shearon Harris Unit 1.jpg | image_size = | image_caption = Shearon Harris Unit 1 | image_alt = | location_map = USA North Carolina#USA | location_map_alt = | coordinates = {{coord|35|38.0|N|78|57.3|W|region:US-NC_type:landmark|display=inline,title}} | country = United States | location = New Hill, Wake County, North Carolina | status = O | construction_began = {{start date|1978|1|28}} | commissioned = May 2, 1987 | decommissioned = | cost = $4.115 billion (2007 USD)[1] | owner = Progress Energy | operator = Progress Energy | np_reactor_type = PWR | np_reactor_supplier = Westinghouse | np_fuel_type = | np_fuel_supplier = | ps_cogeneration = | ps_cooling_source = Buckhorn Creek | ps_cooling_towers = 1 × Natural Draft | ps_units_operational = 1 × 928 MW | ps_units_manu_model = WH 3-loop (DRYAMB) | ps_units_uc = | ps_units_planned = | ps_units_cancelled = 3 × 900 MW 2 × 1117 MW AP1000 | ps_units_decommissioned= | ps_thermal_capacity = 1 × 2900 MWth | ps_heating_capacity = | ps_electrical_capacity = 928 | ps_electrical_cap_fac = 101% (2017) 89.0% (lifetime) | ps_storage_capacity = | ps_annual_generation = 8209 GWh (2017) | website = [https://www.duke-energy.com/_/media/pdfs/energy-education/harris-nuclear-plant-fact-sheet.pdf Harris Nuclear Plant Fact Sheet] | extra = }} The Shearon Harris Nuclear Power Plant is a nuclear power plant with a single Westinghouse designed pressurized-water nuclear reactor operated by Duke Energy. It was named in honor of W. Shearon Harris, former president of Carolina Power & Light (predecessor of Progress Energy Inc.).[2] Located in New Hill, North Carolina, in the United States, about 20 miles (30 km) southwest of Raleigh, it generates 900 MWe, has a 523-foot (160 m) natural draft cooling tower, and uses Harris Lake for cooling. The reactor achieved criticality in January 1987 and began providing power commercially on May 2 of that year. The Shearon Harris site was originally designed for four reactors, but cost and weakening demand despite a growing population resulted in three of the reactors being canceled. The final cost approached $3.9B, including safety upgrades mandated after the Three Mile Island accident. On November 16, 2006, the operator applied to the Nuclear Regulatory Commission (NRC) for a renewal and extension of the plant's operating license.[3] The NRC granted the renewal on December 17, 2008, extending the license from forty years to sixty.[4] Units 2 & 3On February 19, 2008 Progress filed an application with the Nuclear Regulatory Commission (NRC) for a Combined Construction and Operating License (COL). It seeks to build two 1,100 MWe Westinghouse AP1000 pressurized water reactors. Although the NRC has already certified the AP1000 design, the application review is expected to take about 36 months. The new reactors would not be operational before 2018.[5] Expansion of the plant will require raising the water level of Harris Lake by 20 feet,[6] decreasing the size of Wake County's largest park, with the Cape Fear River as a backup water source. On January 22, 2010 officials at the Nuclear Regulatory Commission announced the electrical generator from the damaged Unit 2 reactor at Three Mile Island will be used at Shearon Harris.[7] The generator was refurbished and installed during a refueling outage in November, 2010. On May 2, 2013, Duke submitted a request to the NRC to suspend review of the Harris Units 2 and 3 Combined License Application (COLA), effectively halting further development of this project.[8] Duke has determined the forecast operating dates of the proposed reactors falls outside the fifteen-year planning horizon utilized by state regulators in their demonstration of need evaluation. The COLA remains docketed, however, leaving the door open for Duke to restart activities.[9] Reactor dataThe Shearon Harris Nuclear Power Plant consists of one operational reactor. Three additional units were cancelled. Two new additional reactors are planned.
SafetyNuclear Regulatory Commission inspectionsAs of September 2017, the Harris plant is one of three out of the 99 plants in the country to have no Nuclear Regulatory Commission (NRC) findings during the past 4 quarters of inspections.[13] The NRC's risk estimate for an earthquake intense enough to cause core damage to the reactor at Shearon Harris was 1 in 434,783, according to an NRC study published in August 2010.[14][15] Surrounding populationThe Nuclear Regulatory Commission defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of {{convert|10|mi}}, concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about {{convert|50|mi}}, concerned primarily with ingestion of food and liquid contaminated by radioactivity.[16] The 2010 U.S. population within {{convert|10|mi}} of Shearon Harris was 96,401, an increase of 62.6 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within {{convert|50|mi}} was 2,562,573, an increase of 26.0 percent since 2000. Cities within 50 miles include Raleigh (21 miles to city center), Durham (24 miles to city center), Fayetteville (39 miles to city center).[17] During FEMA's most recent evaluation of state and local government's plans and preparedness included emergency operations for the plant, no deficiencies or areas requiring corrective actions were identified.[18] NC-WARN concernsThe anti-nuclear group "N.C. Waste Awareness and Reduction Network" (NC-WARN) questioned the facility's safety and security record calling it "insufficient" and claiming "it is the most dangerous nuclear plant in the US".[19][20] However, the plant's technical and security systems have passed all Nuclear Regulatory Commission (NRC) standards[21] {{As of|2008|lc=on}}, including protection and security, and no worker or area resident has been injured as a result of the plant's operation. Spent fuel poolsIn 2010, Project Censored, a non-profit, investigative journalism project, ranked the safety issues at Shearon Harris the 4th most under-reported story of the year, because of the risk of fires at what are the largest spent-fuel pools in the country:[22] Between 1999 and 2003, there were twelve major problems requiring the shutdown of the plant.{{citation needed|date=September 2017}} According to the NRC, the national average for commercial reactors is one shutdown per eighteen months.{{citation needed|date=September 2017}} Congressman David Price of North Carolina sent the NRC a report by scientists at MIT and Princeton that pinpointed the waste pools as the biggest risk at the plant. "Spent fuel recently discharged from a reactor could heat up relatively rapidly and catch fire," wrote Bob Alvarez, a former advisor to the Department of Energy and co-author of the report. "The fire could well spread to older fuel. The long-term land contamination consequences of such an event could be significantly worse than Chernobyl. In August 2007, NC WARN dropped a lawsuit against Progress Energy that was intended to delay or prevent expansion of Shearon Harris, claiming that continuing the legal battle would cost at least $200,000.[23] ShutdownOn May 16, 2013, Shearon Harris Unit 1 initiated an unplanned shutdown when reviews of ultrasonic data from a refueling outage in spring 2012 determined a 1/4" flaw was inside the 6"-thick Reactor Pressure Vessel Head. The flaw was near the nozzle for a control rod drive mechanism and attributed to primary water stress corrosion cracking, though no actual leakage was detected. Due to high radiation levels, the repairs required robotic aid.[24] References1. ^{{cite web|title=EIA - State Nuclear Profiles|url=https://www.eia.gov/nuclear/state/archive/2010/northcarolina/|website=www.eia.gov|accessdate=3 October 2017|language=en}} 2. ^{{cite web|url=http://www.historync.org/laureate%20-%20Shearon%20Harris.htm|title=NC Business Hall of Fame – Shearon Harris|work=historync.org}} 3. ^{{cite web | url= https://www.nrc.gov/reactors/operating/licensing/renewal/applications/harris.html | title= Shearon Harris Nuclear Power Plant – License Renewal Application | date= December 1, 2008 | work= Operating Reactor Licensing | publisher= Nuclear Regulatory Commission (NRC) | accessdate= 2009-01-06 }} 4. ^{{cite web | url= http://www.world-nuclear-news.org/newsarticle.aspx?id=24191 | title= Shearon Harris operating licence extended | date= December 18, 2008 | work= World Nuclear News | publisher= | accessdate= 2009-01-06 | archive-url= https://web.archive.org/web/20110331015744/http://www.world-nuclear-news.org/newsarticle.aspx?id=24191 | archive-date= 2011-03-31 | dead-url= yes | df= }} 5. ^{{cite web | url= http://www.world-nuclear-news.org/NN/Submission_for_new_nuclear_at_Harris_190208.html?terms=harris | title= Submission for new nuclear at Harris | date= 19 February 2008 | work= World Nuclear News |publisher= | accessdate= 2008-10-24 }} 6. ^{{cite news | first=John | last=Murawski | coauthors= | title=Progress prepares for new reactors | date=2007-09-20 | publisher= | url =http://www.newsobserver.com/business/nc/nuclearpower/story/709925.html | work =Raleigh News & Observer | pages = | accessdate = 2007-10-18 | language = }} {{Dead link|date=September 2010|bot=H3llBot}} 7. ^{{cite web |url=http://www.wral.com/news/state/story/6864151/ |title=Three Mile Island generator moving to Shearon Harris |publisher=WRAL |accessdate=2010-01-22}} 8. ^http://pbadupws.nrc.gov/docs/ML1312/ML13123A344.pdf 9. ^{{cite web|url=http://www.bizjournals.com/charlotte/blog/power_city/2013/05/duke-energy-suspends-licensing-for.html|title=Duke Energy suspends licensing for nuclear reactors near Raleigh|date=2 May 2013|work=Charlotte Business Journal}} 10. ^1 2 {{cite web|url=http://www.iaea.org/programmes/a2/|title=PRIS – Home|work=iaea.org}} 11. ^Power Reactor Information System of the IAEA: Nuclear Power Reactor Details – SHEARON HARRIS-3 {{webarchive|url=https://web.archive.org/web/20110604105520/http://www.iaea.org/cgi-bin/db.page.pl/pris.prdeta.htm?country=US&refno=402 |date=2011-06-04 }} 12. ^1 Power Reactor Information System of the IAEA: Nuclear Power Reactor Details – SHEARON HARRIS-4 {{webarchive|url=https://web.archive.org/web/20110604105527/http://www.iaea.org/cgi-bin/db.page.pl/pris.prdeta.htm?country=US&refno=403 |date=2011-06-04 }} 13. ^https://www.nrc.gov/reactors/operating/oversight/pim-summary.html 14. ^Bill Dedman, "What are the odds? US nuke plants ranked by quake risk," msnbc.com, March 17, 2011 http://www.msnbc.msn.com/id/42103936/ Accessed April 19, 2011. 15. ^{{cite web |url=http://pbadupws.nrc.gov/docs/ML1002/ML100270639.pdf|title=Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants|author=Patrick Hiland|date=September 2, 2010 |work=Safety/Risk Assessment Panel for Generic Issue 199 |publisher=Nuclear Regulatory Commission|accessdate=16 August 2011}} 16. ^{{cite web|url=https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/emerg-plan-prep-nuc-power-bg.html |title=Archived copy |accessdate=2012-02-08 |deadurl=yes |archiveurl=https://web.archive.org/web/20061002131207/http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/emerg-plan-prep-nuc-power-bg.html |archivedate=2006-10-02 |df= }} 17. ^Bill Dedman, Nuclear neighbors: Population rises near US reactors, msnbc.com, April 14, 2011 http://www.msnbc.msn.com/id/42555888/ns/us_news-life/ Accessed May 1, 2011. 18. ^https://www.nrc.gov/docs/ML1217/ML12173A454.pdf 19. ^{{cite web|url=http://www.ncwarn.org/?p=426|title=NC WARN » The Most Dangerous U.S. N-Plant? NRC's Dishonest Rating System – A Report by NC WARN|work=ncwarn.org}} 20. ^{{cite news | first=Sue | last=Sturgis | coauthors= | title=The Report is Bullshit | date=2006-03-29 | publisher= | url=http://www.indyweek.com/gyrobase/Content?oid=oid%3A29678 | work=The Independent Weekly | pages= | accessdate=2007-10-18 | language= | archive-url=https://web.archive.org/web/20081006182206/http://www.indyweek.com/gyrobase/Content?oid=oid%3A29678 | archive-date=2008-10-06 | dead-url=yes | df= }} 21. ^{{cite web|url=https://www.nrc.gov/NRR/OVERSIGHT/ASSESS/HAR1/har1_chart.html|title=4Q/2014 Performance Summary – Harris 1|work=nrc.gov}} 22. ^{{cite web |url=http://www.projectcensored.org/top-stories/articles/4-nuclear-waste-pools-in-north-carolina/ |title=4. Nuclear Waste Pools in North Carolina |work=Project Censored |deadurl=yes |archiveurl=https://web.archive.org/web/20100725030831/http://www.projectcensored.org/top-stories/articles/4-nuclear-waste-pools-in-north-carolina/ |archivedate=2010-07-25 |df= }} 23. ^{{cite news|first=John |last=Murawski |coauthors= |title=Nuclear license fight dropped |date=2007-08-21 |publisher= |url=http://www.newsobserver.com/business/story/677401.html |work=Raleigh News & Observer |pages= |accessdate=2007-10-18 |language= |archiveurl=https://web.archive.org/web/20070824203432/http://www.newsobserver.com/business/story/677401.html |archivedate=2007-08-24 |deadurl=yes |df= }} 24. ^{{cite news|last=Murawski|first=John|title=Shearon Harris nuclear power plant shutdown because of cracking|url=http://www.newsobserver.com/2013/05/16/2897074/shearon-harris-shut-down-because.html|accessdate=17 May 2013|newspaper=The News & Observer|date=2013-05-16|deadurl=yes|archiveurl=https://web.archive.org/web/20130607081310/http://www.newsobserver.com/2013/05/16/2897074/shearon-harris-shut-down-because.html|archivedate=7 June 2013|df=}} External links{{stack|{{Portal|North Carolina|Energy|Nuclear technology}}}}
8 : Energy infrastructure completed in 1987|Towers completed in 1987|Nuclear power stations using AP1000 reactors|Towers in North Carolina|Buildings and structures in Wake County, North Carolina|Nuclear power plants in North Carolina|Nuclear power stations using pressurized water reactors|Nuclear power stations with proposed reactors |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。