词条 | Shenyang–Dalian Expressway | ||||||||||||||||||||||||||
释义 |
|country=CHN |marker_image= |name=Shenda Expressway |type= |route= |alternate_name= |maint= |section= |map= |map_notes= |length_mi=248.5 |length_round= |length_ref= |length_notes= |established=1984 |decommissioned= |direction_a= |terminus_a=Dalian, Liaoning |beltway_city= |junction= |direction_b= |terminus_b=Shenyang, Liaoning |counties= |system= }} The Shenyang–Dalian Expressway, or Shenda Expressway ({{zh|t=瀋大高速公路 |s=沈大高速公路 |p=Shěndà Gāosù Gōnglù}}) is a {{convert|400|km|abbr=on}} expressway that connects Shenyang and Dalian, the two largest cities of China's Liaoning province. The G000 Series expressway is a toll road with toll booths mostly at on/off ramps (toll plaza used at terminus in Dailan). Standard guiderails are used along the G15. Grass or shrubs are used to divide the opposing lanes of traffic. HistoryThe highway was built between 1984 and 1990. The name combines the first character of each of the 2 cities, Shen and Da, making it the Shenda highway. It translates literally to Shenda high-speed roadway. Originally, it was a 4-lane freeway. It was rebuilt recently and now has 8 lanes. ControversyShenda highway is claimed to be the first expressway in China mainland. It was planned as an express highway but was actually built as a freeway. Due to its length ({{convert|400|km|abbr=on}}), it was opened section by section. Although the entire route was not completed until 1990, its first section had already opened in 1986. By 1988, more than {{convert|100|km|abbr=on}} of the route was opened to public traffic. Its competitor, the Hujia Expressway, only {{convert|18.5|km|abbr=on}} long, also claimed to be the first expressway in mainland China. It was completed in 1988. Main Exits
References{{DEFAULTSORT:Shenyang-Dalian Highway}} 2 : Expressways in China|Transport in Liaoning |
||||||||||||||||||||||||||
随便看 |
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。