词条 | Shin Shinano |
释义 |
Converter equipmentThe HVDC back-to-back facility Shin Shinano uses line-commutated thyristor converters. The station houses two converters, one of which opened in December 1977,[1] the other in 1992. The original 1977 converter was one of the first thyristor-based HVDC schemes to be put into operation in the world and used oil-insulated, oil-cooled outdoor thyristor valves supplied by Hitachi (60 Hz end) and Toshiba (50 Hz end). A special workshop was provided on the site, in which valve maintenance (for example replacing failed thyristors) could be carried out under clean conditions in order to avoid contamination of the oil. The 1992 converter uses more conventional air-insulated, water-cooled thyristor valves. In 2008 the original 1977 converter was decommissioned and replaced by a third converter, similar in design to the 1992 converter but using Light-Triggered Thyristors. The Shin-Shinano link operates with a dc link voltage of 125 kV for each converter. The station was initially rated at 300 MW. In 1992, with the addition of the second 300 MW converter, the maximum transferable power was uprated to 600 MW. See also
References1. ^Compendium of HVDC schemes, CIGRÉ Technical Brochure No. 003, 1987, pp100–103.
External links
5 : Converter stations|Electric power infrastructure in Japan|Tokyo Electric Power Company|Energy infrastructure completed in 1977|Energy infrastructure completed in 1992 |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。