请输入您要查询的百科知识:

 

词条 Mindoro Wind Farm
释义

  1. Project details

  2. References

{{Infobox power station
| name = Mindoro Wind Farm
| name_official = Wind Energy Power System
| image =
| image_caption =
| image_alt =
| location_map = Philippines
| location_map_size =
| location_map_caption =
| coordinates = {{coord|13|30|7.87|N|120|57|10.64|E|type:landmark|display=inline,title}}
| coordinates_ref =
| country = Philippines
| location = Mindoro Oriental
| status =
| construction_began =
| commissioned =
| decommissioned =
| cost =
| owner = Philippine Hybrid Energy Systems, Inc.
| operator =
| ps_units_operational = 24 X 2 MW
| ps_units_manu_model = Siemens Gamesa
| wind_hub_height = {{convert|70|m|ft|0|abbr=on}}
| wind_rotor_diameter =
| wind_rated_speed =
| wind_farm_type = Onshore
| wind_site_elevation =
| wind_site_usage =
| wind_site_area =
| ps_electrical_capacity = 48 MW
| ps_electrical_cap_fac =
| website =
| extra =
}}

The Wind Energy Power System (WEPS) is a wind farm project located near Puerto Galera, in the Philippine province of Mindoro Oriental. Once completed the project will generate an estimated 48MW of electricity.[1]

Project details

The WEPS is located in the municipality of Puerto Galera, on the island of Mindoro. The project is being developed by Philippine Hybrid Energy Systems, Inc. a joint Philippine, Italian, and American developer. The first stage of development was approved in June 2011 by Philippine Energy Secretary Jose Almendras. This comes as part of the Philippine Government's ambitious energy policy.

On March 7, 2012 in Mindoro, Philippine President Aquino signed the Proposed Luzon Mindoro-Interconnection (LMI) project with the full support of Cong. Rudy Valencia, Cong. Rey Umali, Governor Alfonso Umali, and the Local Government of Mindoro. This agreement will allow for excess electricity to be transported to the nearby island of Luzon, home to the nation's capital and largest city Manila. “Before I end my term in 2016, I want to see Mindoro exporting its surplus power to Luzon,” commented President Benigno Aquino III during a recent signing ceremony.[2]

The project is being developed jointly by Philippine Hybrid Energy Systems, Inc. Italian power utility developer CMC Asia, Inc. and turbine manufacturer and building contractor Gamesa Eolica, S.L. Unipersonal of Spain.

References

1. ^{{cite web|title=Mindoro Wind Farm Rising|url=http://manilastandardtoday.com/2012/09/06/mindoro-wind-farm-rising/|publisher=Manila Standard Today|deadurl=yes|archiveurl=https://web.archive.org/web/20121009025944/http://manilastandardtoday.com/2012/09/06/mindoro-wind-farm-rising/|archivedate=2012-10-09|df=}}
2. ^{{cite news|last=Evora |first=Robert |title=Mindoro wind farm dwarfs Ilocos plant |url=http://manilastandardtoday.com/2012/08/20/mindoro-wind-farm-dwarfs-ilocos-plant/ |newspaper=Manila Standard Today |deadurl=yes |archiveurl=https://web.archive.org/web/20120824140453/http://manilastandardtoday.com/2012/08/20/mindoro-wind-farm-dwarfs-ilocos-plant/ |archivedate=2012-08-24 |df= }}
{{stack|{{Portal|Philippines|Weather|Renewable energy}}}}{{Wind farms in the Philippines}}

2 : Wind farms in the Philippines|Buildings and structures in Oriental Mindoro

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/12 3:29:10