请输入您要查询的百科知识:

 

词条 Moses-Saunders Power Dam
释义

  1. Background

     Negative impacts   Environmental Impacts   Rehabilitation and upgrades 

  2. Design and operation

  3. See also

  4. References

{{Infobox dam
| name = Moses-Saunders Power Dam
| name_official = Robert Moses-Robert H. Saunders Power Dam
| image = OPG RH Saunders Dam-1.jpg
| image_size =
| image_caption = The dam's R.H. Saunders Generating Station
| image_alt =
| location_map = New York
| location_map_size =
| location_map_caption =
| coordinates = {{coord|45|00|23|N|74|47|42|W|type:landmark|display=inline,title}}
| country = United States/Canada
| location = Massena, New York
Cornwall, Ontario
| status = O
| construction_began = 1954
| opening = 1958
| demolished =
| cost =
| owner = New York Power Authority
Ontario Power Generation
| dam_type =
| dam_height = {{Convert|195.5|ft|m|0|abbr=on}}[1]
| dam_height_thalweg =
| dam_height_foundation=
| dam_length = {{Convert|3216|ft|m|0|abbr=on}}
| dam_width_crest =
| dam_width_base =
| dam_volume =
| dam_elevation_crest =
| dam_crosses = Saint Lawrence River
| spillway_count = Long Sault Dam
| spillway_type =
| spillway_capacity =
| res_name = Lake St. Lawrence
| res_capacity_total =
| res_capacity_active =
| res_capacity_inactive=
| res_catchment =
| res_surface = {{Convert|100|mi2|km2|0|abbr=on}}[2]
| res_elevation =
| res_max_depth =
| res_max_length = {{Convert|30|mi|km|0|abbr=on}}
| res_max_width =
| plant_hydraulic_head = {{Convert|81|ft|m|0|abbr=on}}[3]
| res_tidal_range =
| plant_operator =
| plant_commission = R.H. Saunders: July 8, 1958-December 18, 1959[4]
| plant_decommission =
| plant_type =
| plant_turbines = R.H. Saunders: 16 x 65.3 MW fixed-pitch Kaplan-type
St. Lawrence/FDR: 16 x 57 MW fixed pitch Kaplan-type[5]
| plant_capacity = R.H. Saunders: 1,045 MW
St. Lawrence/FDR: 912 MW
Total: 1,957 MW
| plant_annual_gen =
| website =
| extra =
}}

The Moses-Saunders Power Dam, short for Robert Moses-Robert H. Saunders Power Dam, is a dam on the Saint Lawrence River straddling the border between the United States and Canada. It is located between Massena in New York and Cornwall in Ontario. The dam supplies water to two adjacent power stations, the United States' 912 MW St. Lawrence-Franklin D. Roosevelt Power Project and Canada's 1,045 MW R.H. Saunders Generating Station. Constructed between 1954 and 1958, the dam created Lake St. Lawrence and is part of a larger project called the Saint Lawrence Seaway. Aside from providing significant amounts of renewable power, the dam regulates the St. Lawrence River and affords passage for the navigation of large vessels. Despite the enormous economic advantages to the dam, it required the relocation of 6,500 people and caused harm to the surrounding environment. Positive efforts have been made over the years to improve shoreline and fish habitats.

Background

Development of the St. Lawrence River which serves as a border between Canada and the United States was in its early stages in 1871 when the Treaty of Washington was signed, which in part demarcated the St. Lawrence River as a boundary and offered Americans greater use of the Canadian side of the river for shipping. In 1895 the Deep Waterways Commission was established to explore expanded use of the river for navigation. International shipping on the river would have a positive impact on trade between the two countries. The early St. Lawrence Seaway was proposed but railway companies in the United States stopped its construction because they felt it would reduce their profits. The Boundary Waters Treaty of 1909 further solidified cooperation between the U.S. and Canada on the river, allowing "free and open" navigation and establishing the International Joint Commission (IJC) to resolve disputes. In 1931, New York's Governor Franklin D. Roosevelt signed the Power Authority Act which allowed the development of the St. Lawrence River for power use. A primary site was just below the Long Sault Rapids. Despite the cooperation, the U.S. Federal Government was unable to open up the river for increased navigation and development due to political issues. Upset with this, Canada unilaterally passed two acts in 1951 which allowed projects on the St. Lawrence for power and navigation purposes. They pressured the U.S. to act and in 1952, President Dwight D. Eisenhower approved a hydroelectric dam on the river. The next year a proposal for a hydroelectric dam and navigation lock was submitted to the IJC for approval. In October 1952 the project was approved.[6]

Because of political stalemate and the railway companies, construction did not begin until August 19, 1954 when the entire seaway project began with a ground breaking ceremony at the dam site. Construction was expected to last seven years and much of which was supervised by the U.S. Army Corps of Engineers.[7] Chairman of the New York Power Authority, Robert Moses, oversaw the U.S. portion and Robert H. Saunders, chairman of Ontario Hydro, oversaw the Canadian side of the project. The project included the main dam, the Long Sault Dam, the Eisenhower\\Snell Locks, the Massena Intake, and {{Convert|10.9|mi|km|0|abbr=on}} of dikes. Robert Hood Saunders had already been elected mayor of Toronto four times when he joined Ontario Hydro. Saunders would not live to see his name on the station. He died on January 16, 1955 from injuries and shock from the previous evening when Saunder’s ice-covered aircraft crashed near an airstrip in London, Ontario. He and four others were returning to Toronto from Windsor; Saunders had reportedly just delivered a speech in Detroit on the St. Lawrence Power Project. He was only 51 and at the peak of his career.

On July 1, 1958, Dr. Otto Holden, chief engineer of Hydro-electric Power Commission of Ontario, and J. Burch McMorron, Chief Engineer of The New York Power Authority, detonated 27 metric tonnes of explosives to demolish the cofferdam that had diverted St. Lawrence River water away from the powerhouse construction site. It took four days for the plant to become fully operational. The last generators were commissioned in 1959.[8] Previously, in 1956, the IJC established the International St. Lawrence River Board of Control as a mechanism to regulate the river above and below the dam. Competing interests for power and navigation had to be controlled in order to maintain good function of the dam. Those interested in power and flood control desired moderate water levels and the shipping industry and power station operators wanted levels to be higher.[6]

Negative impacts

To construct the dam 6,500 people in Eastern Ontario were dislocated, some farmers but predominately the residents of six villages and three hamlets, known as The Lost Villages, before the land was flooded. The residents were given market value for their land, though there are claims it was unfair because the land prices were believed to have already been depressed due to the anticipated submergence; some residents were forcibly removed. Most were relocated to homes in new communities called South Stormont (Long Sault) or Ingleside and Iroquois.[9][10] In 2008, Ontario Hydro made an official apology.[4]

The construction and operation of the dam impacted the traditional territory used by the Native American Mohawks of Akwesasne. Over 1,200 acres of reserve lands and 15,000 acres of traditional lands were flooded. The group was not consulted or compensated in anyway for the flooding of ten islands belonging to Akwesasne for the creation of the head pond. In 2008, a 15 year effort to address the past wrongs resulted in a proposed settlement between Ontario Power Generation and The Mohawk Council of Akwesasne. The settlement included monetary compensation, a transfer of islands originally owned by Akwesasne, and environmental stewardship.[11]

Power produced by the dam was the primary reason that General Motors, Reynolds Metals and the Aluminum Company of America opened factories in the area. These factories generated severe pollution on the river and are now{{when|date=May 2017}} Superfund clean-up sites.[12]

Environmental Impacts

Flooding and pollution have affected fish populations on the river and in Lake St. Lawrence. Northern Pike, Walleye, Muskellunge, Lake Sturgeon and American eel have been affected. The loss of spawning grounds is also believed to have contributed to drops in their populations. Recent efforts have stabilized or increased much of the populations.[13] R.H. Saunders Generating Station has a ladder made in a decommissioned ice sluce designed for juvenile American Eels to head upriver, across the generating station. At {{Convert|521|ft|m|0|abbr=on}} long and {{Convert|95|ft|m|0|abbr=on}} high, it was the only one in North America and the tallest in the world at the time. In recent years, it has been upgraded and extended {{Convert|984|ft|m|0|abbr=on}} in length.[14] OPG maintains a trap and transport program with local commercial fisherman for downstream migration. From 2006 to 2011, approximately four million young eels crossed into the upper St. Lawrence River and Lake Ontario.[15]

Both New York and Ontario have instituted programs to improve the local environment around the reservoir and its water quality.[4] The U.S. programs were mainly instituted after the power station was re-licensed for 50 years on October 23, 2003.[3][16][17]

R.H. Saunders Generating Station works to control their environmental initiative by conducting studies, improving habitats, and coordinating electricity production during spawning seasons. In the summer of 2016, Bird Studies Canada installed a MOTUS tracking system at R.H. Saunders Generating Station that tracks the migration of 85 species of birds, bats, and large insects.[18]

Rehabilitation and upgrades

After investigations in 1990 and 1991, it was determined that generator and structural problems within the dam were due to Alkali–aggregate reaction. The power station's concrete was cracking and deteriorating while the generator stators and throat ring linings were deformed. From 1993 to 2001 extensive repairs were carried out to fix damaged concrete and mitigate concrete expansion.[19] From 1987 to 2007 upgrades to R.H. Saunders Generating Station have increased efficiency by 16 percent.[4] In 1998, the New York Power Authority began a $254 million refurbishment of the turbine-generators at the St. Lawrence/FDR. The project is expected to be complete in 2013.[20]

Design and operation

The {{Convert|195.5|ft|m|0|abbr=on}} tall and {{Convert|3212|ft|m|0|abbr=on}} long dam is situated in between the Canadian shore at Cornwall and New York's Barnhart Island. To create the reservoir, the Long Sault Dam was constructed {{Convert|3.5|mi|km|0|abbr=on}} upstream in between Barnhart Island and one of the Long Sault Islands. In between the Long Sault Island the New York shore is the Eisenhower and Snell Locks. Located {{Convert|7.5|mi|km|0|abbr=on}} upstream is the Massena Intake. Further securing the reservoir is {{Convert|10.9|mi|km|0|abbr=on}} of dikes. The Long Sault Dam, completely in the U.S., is {{Convert|2960|ft|m|0|abbr=on}} long and {{Convert|109|ft|m|0|abbr=on}} high. It serves as a spillway to pass flood waters on the river. The Massena Intake is {{Convert|721|ft|m|0|abbr=on}} long and {{Convert|108|ft|m|0|abbr=on}} high. It provides water for industry and local civil consumption.[3] The power station at the Moses-Saunders Dam contains 32 turbine generators. Ontario Power Generation operates units 1-16 and the New York Power Authority operates 17-32. The Canadian side of the power station, R.H. Saunders Generating Station, contains 16 x 65.3 MW fixed-pitch Kaplan turbine-generators and the U.S. power station, St. Lawrence-FDR contains 16 x 57 MW vertical fixed-pitch Kaplan turbine-generators. The dam affords the turbines {{Convert|81|ft|m|0|abbr=on}} of hydraulic head.[3] The Eisenhower and Snell Locks can pass ships up to {{Convert|730|ft|m|0|abbr=on}} in length and {{Convert|76|ft|m|0|abbr=on}} wide a height of {{Convert|38|ft|0|abbr=on}} (Eisenhower) and {{Convert|43|ft|0|abbr=on}} (Snell).[21]

See also

{{stack|{{Portal|Canada|New York|Water|Renewable energy}}}}
  • Saint Lawrence Seaway
  • The Lost Villages
  • List of power stations in New York
  • List of electrical generating stations in Ontario

References

{{Commons category}}
1. ^{{cite book|last=Parham|first=Claire Puccia|title=The St. Lawrence Seaway and Power Project : an oral history of the greatest construction show on earth|year=2009|publisher=Syracuse University Press|location=Syracuse, N.Y.|isbn=0-8156-0913-2|pages=xxiii|url=https://books.google.com/books?id=pxgOX-bUXVwC&pg=PP2&dq=Moses-Saunders+Power+Dam&hl=en&sa=X&ei=tAVUT-aKEs6osALW7YjwBQ&ved=0CGEQ6AEwBw#v=onepage&q=Moses-Saunders%20Power%20Dam&f=false|edition=1st}}
2. ^{{cite web|title=St. Lawrence River (International Section)|url=http://www.lre.usace.army.mil/greatlakes/hh/outflows/discharge_measurements/st._lawrence_river/|publisher=U.S. Army Corps of Engineers|accessdate=5 March 2012}}
3. ^{{cite web|title=Order Approving Settlement Agreements, Dismissing Complaint and Issuing New License|url=http://www.ferc.gov/whats-new/comm-meet/102203/H-1.pdf|publisher=Federal Energy Regulatory Commission|accessdate=5 March 2012|date=23 October 2003}}
4. ^{{cite web|title=R.H. Saunders Station|url=http://www.opg.com/power/hydro/ottawa_st_lawrence/rh_saunders.asp|publisher=Ontario Power Generation Inc.|accessdate=5 March 2012}}
5. ^{{cite web|title=The HydroX System|url=http://www.ge-mcs.com/download/monitoring/2q04hydrox.pdf|publisher=Orbit|accessdate=5 March 2012|year=2004}}
6. ^{{cite book|editor-last=Sproule-Jones |editor-first=Mark |title=Canadian water politics : conflicts and institutions |chapter=The St Lawrence: From River to Maritime Superhighway |year=2008|publisher=McGill-Queen's University Press|location=Montréal, Québec |isbn=0-7735-3469-5|pages=247–252 |chapter-url=https://books.google.com/books?id=dCH2ieGTloUC&pg=PA252&dq=Moses-Saunders+Power+Dam&hl=en&sa=X&ei=tAVUT-aKEs6osALW7YjwBQ&ved=0CDwQ6AEwAQ#v=onepage&q=Moses-Saunders%20Power%20Dam&f=false |editor2=Johns, Carolyn |editor3=Heinmiller |last=Heinmiller |first=B. Timothy}}
7. ^{{cite web|last=Levasseur|first=Phillip G.|title=The Great Lakes-The St. Lawrence River: Under Climate Change|url=http://www.ce.utexas.edu/prof/mckinney/ce397/Topics/StLawrence/StLawrence(2010).pdf|work=Transboundary Water Resources|publisher=University of Texas at Austin|accessdate=5 March 2012|author2=Dane McKinney|date=22 April 2010}}
8. ^{{cite web|last=Little|first=Gordie|title=St. Lawrence-FDR Power Project & NYPA|url=http://www.absolutelybusiness.com/wordpress/?p=1512|publisher=Absolutely Business|accessdate=5 March 2012|year=2009}}
9. ^{{cite web|last=Gorrie|first=Peter|title=Our own Three Gorges|url=https://www.thestar.com/News/Ideas/article/451265|publisher=Toronto Star|accessdate=5 March 2012|date=29 June 2008}}
10. ^{{cite web|title=The Lost Villages|url=http://www.canada.com/ottawacitizen/news/story.html?id=b888ee7c-b7b1-4c0d-b52f-451271952ba4|publisher=Postmedia Network Inc.|accessdate=5 March 2012|date=28 June 2008|deadurl=yes|archiveurl=https://web.archive.org/web/20121104141454/http://www.canada.com/ottawacitizen/news/story.html?id=b888ee7c-b7b1-4c0d-b52f-451271952ba4|archivedate=4 November 2012|df=}}
11. ^{{Cite web|url=http://www.indiantime.net/story/2008/04/03/news/mohawk-council-of-akwesasne-announces-ontario-power-generation-proposed-settlement-terms/03262012173030835283.html|title=Mohawk Council of Akwesasne Announces Ontario Power Generation proposed settlement terms|last=Time|first=Indian|website=Indian Time|access-date=2016-11-09}}
12. ^{{cite book|last=Hofrichter|first=edited by Richard|title=Reclaiming the environmental debate : the politics of health in a toxic culture|year=2000|publisher=MIT|location=London|isbn=0-262-58182-5|pages=96–97|url=https://books.google.com/books?id=r4UVMZQzqHMC&pg=PA96&dq=Moses-Saunders+Power+Dam&hl=en&sa=X&ei=_xZUT6mtCPDMsQKkt4jwBQ&ved=0CEUQ6AEwAw#v=onepage&q=Moses-Saunders%20Power%20Dam&f=false}}
13. ^{{cite web|title=FISH HABITAT CHANGES - Thousand Islands, Middle Corridor, and Lake St. Lawrence|url=http://www.glfc.org/lakecom/loc/habitat.pdf|publisher=RE Grant & Associates|accessdate=5 March 2012}}
14. ^{{cite web|last=Johnson|first=Brian|title=The eels weren’t forgotten|url=http://www.waterkeeper.ca/2009/08/01/the-eels-werent-forgotten/|publisher=Lake Ontario Waterkeeper|accessdate=5 March 2012|date=1 August 2009}}
15. ^{{Cite web|url=http://www.opg.com/news-and-media/Reports/PowerNews_2015Q3.pdf|title=Power News 2015 Q3|last=|first=|date=|website=opg.com|publisher=Ontario Power Generation|access-date=November 9, 2016}}
16. ^{{cite web|title=Land Management Plan - St. Lawrence River|url=http://www.stl.nypa.gov/Land%20Management%20Plan/St.%20Lawrence%20LMP%20final.102604.htm|publisher=New York Power Authority|accessdate=5 March 2012}}
17. ^{{cite web|title=Future Habitat Improvement Projects Fund|url=http://www.stl.nypa.gov/FHIPapplication.htm|publisher=New York Power Authority|accessdate=5 March 2012}}
18. ^{{Cite news|url=http://www.opg.com/news-and-media/our-stories/Documents/20160912_BirdMonitoring.pdf|title=Bird Monitoring|last=|first=|date=|work=|access-date=November 9, 2016|via=opg.com}}
19. ^{{cite web|title=R.H. Saunders Generating Station Structural Rehabilitation|url=http://www.icri.org/awards/2002/rhsaunders.asp|work=AWARD OF EXCELLENCE: Water Structures Category|publisher=International Concrete Repair Institute|accessdate=5 March 2012}}
20. ^{{cite web|title=St. Lawrence-FDR Power|url=http://www.stl.nypa.gov/power.html|publisher=New York Power Authority|accessdate=5 March 2012}}
21. ^{{cite web|title=Erie Canal and Eisenhower Locks|url=http://www.seawaytrail.com/lessonplans/history6.pdf|work=Learning on the Great Lakes Seaway Trail|publisher=Seaway Trail|accessdate=5 March 2012}}

14 : Dams in New York (state)|Dams in Ontario|Hydroelectric power stations in Ontario|Hydroelectric power plants in New York (state)|Buildings and structures in St. Lawrence County, New York|Dams completed in 1958|Energy infrastructure completed in 1959|1958 establishments in Ontario|1959 establishments in New York (state)|Buildings and structures in Cornwall, Ontario|United States Army Corps of Engineers dams|Ontario Power Generation|Ontario Hydro|Saint Lawrence River

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/12 1:44:29