请输入您要查询的百科知识:

 

词条 Musoshi Mine
释义

  1. Resource

  2. Early operations

  3. Recent activity

  4. References

{{Use dmy dates|date=December 2013}}{{Infobox mine
| name = Musoshi Mine
| image =
| width =
| caption =
| pushpin_map = Democratic Republic of the Congo
| pushpin_label_position = top
| pushpin_label =
| pushpin_map_alt =
| pushpin_mapsize =
| pushpin_map_caption =
| coordinates = {{coord|12.270137|S|27.725823|E|region:CD|format=dms|display=inline,title}}
| place =
| subdivision_type = Province
| state/province = Katanga Province
| country = Democratic Republic of the Congo
| owner =
| official website =
| acquisition year =
| stock_exchange =
| stock_code =
| products = Copper
| financial year =
| amount =
| opening year =
| active years =
| closing year =
}}

The Musoshi Mine is an underground copper mine in the Katanga Province of the Democratic Republic of the Congo. The mineral rights are owned by the South African miner Metorex.

Resource

The Musoshi ore body is the northern extension into the DRC of the Zambian Konkola North ore body.

It is located {{convert|1.5|km|mi}} to the north west of Kasumbalesa.

It is a typical "Ore Shale" deposit, hosted in a fine-grained siltstone / argillaceous sandstone.

The ore body dips steeply in the upper levels. It thins to the east and west to widths of {{convert|4|m|ft}} to {{convert|6|m|ft}}.[1]

Early operations

A Japanese consortium operated the mine from 1968 to 1983.

They developed a {{convert|475|m|ft}} vertical mine shaft as well as underground workings and ground-level infrastructure.

A surface-level concentrator had a capacity of 1.5 million tonnes per year.

At its peak, in 1976 the mine produced 1.67 million tonnes of ore graded at 2.5% copper, equivalent to 38,000 tonnes of finished copper.[1]

The concentrator was also used to process ore from the Kinsenda Mine, {{convert|20|km|mi}} away.

The mine was closed and the concentrator placed on care-and-maintenance in the early 1990s due to low copper prices and lack of accessible resources.

After strike action by the labor union the concentrator was mothballed and the mine allowed to flood.

Musoshi has an inferred resource below the lowest working level of 24 million tons at 2.4% copper, or 576,000 tons of contained copper.[1]

Recent activity

In 2007, Metorex acquired 38.7% of Copper Resources Corporation from the Forrest Group, as well as 5% of Miniere de Mushoshi et Kinsenda (MMK). After completing the acquisition and reopening Musoshi mine, it was expected to produce up to 12,000 tonnes annually.[1]

Due to a Title Revisitation Process initiated by the DRC government, in February 2009, it was confirmed that the Musoshi mine would be returned to the state-owned Sodimico.

In October 2010 a South Korean consortium of Taejoo Synthesis Steel, Samsung, Hyundai and Daewoo said it was willing to revive the Mushoshi mine.[2]

References

1. ^{{cite web |url=http://www.miningweekly.com/article/first-copper-on-track-at-ruashi-two-says-metorex-2007-08-31 |title=First copper on track at Ruashi Two, says Metorex |work=Mining weekly |author=Martin Creamer |date=31 August 2007 |accessdate=2011-11-08}}
2. ^{{cite web |url=http://www.africaintelligence.com/AMA/exploration-production/2010/11/17/south-koreans-offer-to-revive-musoshi,86240909-ART |work=Africe Intelligence |title=South Koreans Offer to Revive Musoshi |date=2010-11-17 |accessdate=2011-11-08}}
3. ^{{cite web |url=http://www.metorexgroup.com/downloads/sens/2007/2007-0704%20CRC%20SENS.pdf |title=ACQUISITION BY METOREX OF 38.7% OF COPPER RESOURCES CORPORATION AND 5% OF MINIÉRE DE MUSOSHI ET KINSENDA SARL AND WITHDRAWAL OF CAUTIONARY ANNOUNCEMENT |date=4 July 2007 |publisher=Metorex}}
[3]
}}

2 : Copper mines in the Democratic Republic of the Congo|Katanga Province

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 22:35:18