词条 | Nyabarongo Power Station |
释义 |
| name = Nyabarongo Power Station | name_official = | image = | image_size = | image_caption = | image_alt = | location_map = Rwanda | location_map_size = | location_map_caption = Map of Rwanda showing the location of Nyabarongo Power Station | location_map_alt = | coordinates = {{coord|02|15|36|S|29|36|00|E|region:RW_type:landmark|display=inline,title}} | country = Rwanda | location = Mushishiro, Muhanga District | purpose = | status = O | construction_began = | opening = | demolished = | cost = US$110 million | owner = | operator = | dam_type = | dam_crosses = River Mwogo | dam_height = | dam_height_foundation= | dam_height_thalweg = | dam_length = | dam_elevation_crest = | dam_width_crest = | dam_width_base = | dam_volume = | spillway_count = | spillway_type = | spillway_capacity = | res_name = | res_capacity_total = | res_capacity_active = | res_capacity_inactive= | res_catchment = | res_surface = | res_max_length = | res_max_width = | res_max_depth = | res_elevation = {{convert|1550|m|abbr=on}} | res_tidal_range = | plant_name = | plant_coordinates = | plant_operator = | plant_commission = 2014[1] | plant_decommission = | plant_type = R | plant_hydraulic_head = | plant_turbines = 2 x {{convert|14|MW|abbr=on}} | plant_capacity = {{convert|28|MW|abbr=on}} | plant_annual_gen = | website = | extra = }} Nyabarongo Power Station is a {{convert|28|MW}} hydroelectric power station in Rwanda. LocationThe power station is located on the Nyabarongo River, in Mushishiro, Muhanga District, in Rwanda's Southern Province.[2] This location lies approximately {{convert|75|km|mi}}, by road, southwest of Kigali, the capital and largest city in Rwanda.[3] Mushishiro lies approximately {{convert|35|km|mi}}, by road, south of the provincial headquarters at Gitarama.[4] OverviewNyabarongo Power Station is a hydropower plant in Rwanda, completed in October 2014, with a commissioning date in November 2014. At an estimated cost of US$110 million, the planned capacity installation is 28 MW. The project involves a dam, with run of river design, across the River Mwogo, one of the tributaries of Nyabarongo River. The project, undertaken by Angelique International Limited & "Bharat Heavy Electricals Limited" of India, is the largest hydropower installation in Rwanda, to date.[5] Naresh Kapoor Sr., General Manager is the Chief Project Officer appointed by Angelique International Limited of India.[6] Part of the engineering work was also subcontracted to the Australian company Snowy Mountains Engineering Corporation (SMEC).[7] Both the units were synchronised to the Rwandan grid on 27 October 2014 and 30 October 2014. The Rwanda government gave the contractor a deadline in October 2014.[8] The power station was completed and handed over by consortium to client on 28 November 2014. It was officially inaugurated by the president of Rwanda on 5 March 2015.[9] Other considerations
See also{{stack|{{Portal|Rwanda|Water|Renewable energy}}}}
References1. ^{{cite web | url = http://www.newtimes.co.rw/section/article/2014-10-26/182361/ | title = Nyabarongo power plant to be switched on tomorrow | author = Athan Tashobya | publisher = The New Times | date = 26 October 2014 | accessdate = 5 March 2015 }} 2. ^{{cite web |url=http://www.newtimes.co.rw/news/index.php?i=14364&a=32902|title=Nyabarongo Dam Located In Mushishiro Sector |author=The New Times|publisher= |accessdate=15 November 2014}} 3. ^{{cite web|url=http://distancecalculator.globefeed.com/Rwanda_Distance_Result.asp?fromplace=Kigali%20(Kigali)%20&toplace=Mushishiro%20(Gitarama)&fromlat=-1.9536111&tolat=-2.3&fromlng=30.0605556&tolng=29.65 |title=Road Distance Between Kigali And Mushishiro With Map |publisher= |accessdate=15 November 2014}} 4. ^{{cite web |url=http://distancecalculator.globefeed.com/Rwanda_Distance_Result.asp?fromplace=Gitarama%20(Gitarama)%20&toplace=Mushishiro%20(Gitarama)&fromlat=-2.0744444&tolat=-2.3&fromlng=29.7566667&tolng=29.65 |title=Map Showing Gitarama And Mushishiro With Distance Marker |publisher= |accessdate=15 November 2014}} 5. ^{{cite web|url=http://www.rwandaenergy.com/2014/10/nyabarongo-to-start-hydro-production-in-november/|title=Nyabarongo To Start Hydro Production In November|first=Peter|last=.|accessdate=24 July 2015| date=22 October 2014|publisher=Rwanda Energy}} 6. ^{{cite web| url=http://allafrica.com/stories/201107261413.html|date=26 July 2011|title=Rwanda: Nyabarongo Hydro Project To Be Completed By 2014|first=Frank|last=Kanyesigye|newspaper=New Times (Rwanda) via AllAfrica.com|location=Kigali}} 7. ^{{cite web|url=http://allafrica.com/stories/201403260453.html|first=Triphomus|title=Rwanda: Nyabarongo Hydro-Electric Plant to Significantly Boost Energy Supply|last=Muyagu|newspaper=New Times (Rwanda) via AllAfrica.com|accessdate=5 March 2015|location=Kigali|date=24 March 2014}} 8. ^{{cite web| url=http://www.newtimes.co.rw/section/article/2014-09-02/345/ | title=Nyabarongo Hydropower Contractor Given October Deadline | first=Ivan R.|last=Mugisha|newspaper=New Times (Rwanda)| location=Kigali|accessdate=15 November 2014|date=2 September 2014}} 9. ^{{cite web|title=Rwanda: President Kagame Inaugurates Nyabarongo I Hydro Plant to Power Economic Transformation|accessdate=24 July 2015|date=6 March 2015| url=http://allafrica.com/stories/201503201410.html|first=.|last=GOR|publisher=Government of Rwanda (GOR)|location=Kigali}} External links
3 : Hydroelectric power stations in Rwanda|Proposed hydroelectric power stations|Dams in Rwanda |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。