请输入您要查询的百科知识:

 

词条 Osagyefo Barge
释义

  1. See also

  2. References

{{Infobox power station
| name = Osagyefo Barge
| name_official =
| image =
| image_size =
| image_caption =
| image_alt =
| location_map = Ghana
| location_map_size =
| location_map_caption =
| coordinates =
| country = Ghana
| location = Effasu
| status = Existing; never operated
| construction_began =
| commissioned =
| decommissioned =
| cost =
| owner =
| operator =
| th_fuel_primary = Natural gas
| th_fuel_secondary = Diesel
| th_fuel_tertiary =
| ps_units_manu_model =
| th_cogeneration =
| th_combined_cycle =
| ps_electrical_capacity = 125 MW
| ps_electrical_cap_fac =
| website =
| extra =
}}

The Osagyefo Barge is a 125 MW barge-mounted gas turbine electric power generating station located at Effasu in the Western Region of Ghana.

The 77 m long barge is equipped with a pair of single-cycle heavy-duty gas turbine units built by Ansaldo that have a combined generating capacity of 125 MW.[1] It is designed to burn either natural gas or diesel fuel.[2]

The 125 MW power barge was ordered by the Ghanaian government in 1995 with financial assistance from the Overseas Economic Cooperation Fund of Japan.[1] It was intended to generate electricity from natural gas obtained from offshore production fields. The project development called for 450 MW of combined cycle power barges to belated in a man made lagoon. The barge was built in Italy at Navalmare Yard, completed in 1999, and delivered to Ghana in October 2002. It was then moored at the Sekondi Naval Base in Sekondi until 2005, when it was moved to Effasu after the completion of dredging necessary to allow it to enter the harbor there.[2][3] The offshore oil and gas fields did not develop as quickly as expected, so the power barge sat idle and its condition deteriorated.[2] There was a proposal to move the barge to Tema, but that proposal was dropped in 2007.[4] During this period, there was little maintenance conducted on the power barge or on the site, resulting in the deterioration of many of the systems.

The power barge project was initially under the management of Western Power, a subsidiary of GNPC the Ghana National Petroleum Corporation; responsibility was transferred to the Volta River Authority in 2003.[5] In July 2007, the government of Ghana entered an unsolicited 20-year lease agreement with the company Balkan Energy Ghana to refurbish and operate the power barge, initially using diesel fuel and later using gas to be delivered by the West African Gas Pipeline. Ghana sought additional electricity supplies from the barge to alleviate electricity shortages resulting from reduced water levels at the Akosombo Dam hydroelectric project. The company promised to begin operations within 90 days. Also, plans were announced to increase the barge's generating capacity by 60 MW, bringing it from its current capacity of 125 MW up to 185 MW.[3][10] The unit has never operated and the expansion was not completed.[6] The government of Ghana sued in Ghanaian court, seeking to nullify the contract with Balkan Energy.[6][7] Balkan Energy blamed ProEnergy, a U.S. company with which it had contracted, for Balkan's inability to bring the generating station online when promised.[6] Balkan Energy and ProEnergy sued each other in U.S. courts and the government of Ghana later filed a lawsuit against ProEnergy in U.S. court.[6][8]

The name "Osagyefo" commemorates Kwame Nkrumah, the first president of Ghana.[9]

See also

{{Portal|Ghana|Energy}}
  • List of power stations in Ghana
  • Electricity sector in Ghana

References

1. ^{{cite web| url=http://www.modernghana.com/news/73536/1/power-barge-arrives-at-effasu-mangyea-mini-harbour.html |title=Power barge arrives at Effasu Mangyea mini harbour |date=10 March 2005 |publisher=modernghana.com}}
2. ^{{cite web |url=http://www.modernghana.com/print/159340/1/energy-from-osagyefo-barge.html |title=Energy From Osagyefo Barge |date=4 March 2008 | publisher=modernghana.com}}
3. ^{{cite web |url=http://www.modernghana.com/news/159403/1/more-power-from-osagyefo-barge-soon.html |title=More Power From Osagyefo Barge Soon |author=Nehemia Owusu Achiaw |publisher=modernghana.com |date=4 March 2008}}
4. ^{{cite web|url=http://www.modernghana.com/news/142683/1/govt-decision-to-stay-osagyefo-barge-at-effasulee-.html |title=Gov`t decision to stay Osagyefo barge at Effasu |date=7 September 2007 |publisher=modernghana.com}}
5. ^{{cite web|url=http://allafrica.com/stories/200310150725.html |title=Volta River Authority Takes Over Effasu Power Project |date=15 October 2003 |publisher=AllAfrica.com }}
6. ^{{cite web|url=http://www.modernghana.com/news/397331/1/osagyefo-barge-balkan-energy-fraudulent-claims-a-p.html | title=‘Osagyefo Barge’, Balkan Energy: Fraudulent Claims & A PPA That Never Was |author=J. Ato Kobbie |date=23 May 2012 |publisher=modernghana.com}}
7. ^{{cite web|url=http://newtimes.com.gh/story/court-to-give-ruling-on-ghana-and-balkan-energy-case |title=Court To Give Ruling On Ghana And Balkan Energy Case |author=Stephen Kwabena Effah |newspaper=Ghanaian Times |date=22 March 2012}}
8. ^{{cite web|url=http://judicialview.com/Court-Cases/Civil_Procedure/Government-of-Ghana-v-ProEnergy-Services-LLC/10/508098 |title=Government of Ghana v ProEnergy Services, LLC; Case No. 11-2714 (C.A. 8, May. 1, 2012) |publisher=The Judicial View}}
9. ^{{cite web|url=http://www.africanews.com/site/list_message/5465 |title=Ghana signs agreement for more electricity |date=30 July 2007 |publisher=AfricaNews.com}}
{{Ghana topics}}{{Petroleum industry in Ghana}}{{coord missing|Ghana}}

3 : Barges|Natural gas-fired power stations in Ghana|Western Region (Ghana)

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 5:18:45