请输入您要查询的百科知识:

 

词条 Pieman River Power Development
释义

  1. Development

     Legacy 

  2. See also

  3. References

  4. External links

{{Use Australian English|date=July 2015}}{{Use dmy dates|date=July 2015}}

Pieman River Power Development was a major 1970s and 1980s hydroelectric development of the Pieman River and its tributaries on the west coast of Tasmania.

Development

The Pieman River Power Development was approved by the Tasmanian government in 1971, construction began in 1974 and it was completed in 1987.[1]

The damming of the river was the subject of a struggle between conservation groups and Hydro Tasmania, similar to Lake Pedder . The struggle went relatively unnoticed on mainland Australia - and it was the proposed Franklin Dam issue that was to catch a much wider Australian audience, than the damming of the Pieman or King Rivers.

The development included three power stations and five dams:-

  • Lake Murchison and Murchison Dam
  • Lake Mackintosh, Tullabardine Dam and Mackintosh Dam (Mackintosh Power Station), commissioned in 1982
  • Lake Rosebery and Bastyan Dam (Bastyan Power Station), commissioned in 1983
  • Lake Pieman and Reece Dam (Reece Power Station), commissioned in 1986/1987

It also included work on the two major tributaries of the Pieman, the Mackintosh and the Murchison rivers.

Legacy

It remains Hydro Tasmania's most successfully{{citation needed|date=June 2016}} multi-dammed catchment on the West Coast, and it was developed after the Upper Gordon Scheme (Lake Pedder) and was being completed in the era of the Franklin Dam controversy. It could be seen as the last major Power Development Scheme undertaken by the Hydro during its stage as an expanding dam-making enterprise. The King River and Henty River developments that followed required specifically challenging engineering on the part of Hydro, but were smaller projects in duration.

See also

{{stack|{{portal|Tasmania|Renewable energy}}}}
  • Hydro Tasmania

References

1. ^{{Citation | author1=Scanlon, Andrew | author2=Tasmania. Hydro-Electric Commission | title=Water power | publication-date=1990 | publisher=HEC | isbn=978-0-7246-1683-1 }} page 24

External links

  • {{cite web |url=http://www.hydro.com.au/home/Tourism+and+Recreation/Pieman+Catchment/ |archive-url=https://web.archive.org/web/20041204133432/http://www.hydro.com.au/home/Tourism+and+Recreation/Pieman+Catchment/ |dead-url=yes |archive-date=2004-12-04 |title=The Pieman Catchment |publisher=Hydro Tasmania |date= }}

2 : Western Tasmania|Hydro-Tasmania power development schemes

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/24 6:20:22