请输入您要查询的百科知识:

 

词条 Surveyor program
释义

  1. Goals

  2. Launch and lunar landing

  3. Missions

  4. Space Race competition

  5. See also

  6. References

  7. External links

The Surveyor program was a NASA program that, from June 1966 through January 1968, sent seven robotic spacecraft to the surface of the Moon. Its primary goal was to demonstrate the feasibility of soft landings on the Moon. The Surveyor craft were the first American spacecraft to achieve soft landing on an extraterrestrial body. The missions called for the craft to travel directly to the Moon on an impact trajectory, a journey that lasted 63 to 65 hours, and ended with a deceleration of just over three minutes to a soft landing. The program was implemented by NASA's Jet Propulsion Laboratory (JPL) to prepare for the Apollo program. JPL selected Hughes Aircraft to develop the spacecraft system.[1] The total cost of the Surveyor program was officially $469 million.

Five of the Surveyor craft successfully soft-landed on the Moon, including the first one. The other two failed: Surveyor 2 crashed at high velocity after a failed mid-course correction, and Surveyor 4 was lost to contact (possibly exploding) 2.5 minutes before its scheduled touch-down.

All seven spacecraft are still on the Moon; none of the missions included returning them to Earth. Some parts of Surveyor 3 were returned to Earth by the crew of Apollo 12, which landed near it in 1969. The camera from this craft is on display at the National Air and Space Museum in Washington, DC.

Goals

The program performed several other services beyond its primary goal of demonstrating soft landings. The ability of spacecraft to make midcourse corrections was demonstrated, and the landers carried instruments to help evaluate the suitability of their landing sites for manned Apollo landings. Several Surveyor spacecraft had robotic shovels designed to test lunar soil mechanics. Before the Soviet Luna 9 mission (landing four months before Surveyor 1) and the Surveyor project, it was unknown how deep the dust on the Moon was. If the dust was too deep, then no astronaut could land. The Surveyor program proved that landings were possible. Some of the Surveyors also had alpha scattering instruments and magnets, which helped determine the chemical composition of the soil.

The simple and reliable mission architecture was a pragmatic approach to solving the most critical space engineering challenges of the time, namely the closed-loop terminal descent guidance and control system, throttleable engines, and the radar systems required for determining the lander's altitude and velocity. The Surveyor missions were the first time that NASA tested such systems in the challenging thermal and radiation environment near the Moon.

Launch and lunar landing

Each Surveyor mission consisted of a single unmanned spacecraft designed and built by Hughes Aircraft Company. The launch vehicle was the Atlas-Centaur, which injected the craft directly into trans-lunar flightpath. The craft did not orbit the Moon on reaching it, but directly decelerated from impact trajectory, from 2.6 km/s relative to the Moon before firing retrorockets to a soft landing about 3 minutes 10 seconds later.

Each craft was planned to slow to about 110 m/s (4% of speed before retrofire) by a main solid fuel retrorocket, which fired for 40 seconds starting at an altitude of 75.3 km above the Moon, and then was jettisoned along with radar unit at 11 km from the surface. The remainder of the trip to the surface, lasting about 2.5 minutes, was handled by smaller doppler radar units and three vernier engines running on liquid fuels fed to them using pressurized helium. (The successful flight profile of Surveyor 5 was given a somewhat shortened vernier flight sequence as a result of a helium leak). The last 3.4 meters to the surface was accomplished in free fall from zero velocity at that height, after the vernier engines were turned off. This resulted in a landing speed of about 3 m/s. The free-fall to the surface was in an attempt to avoid surface contamination by rocket blast.

Surveyor 1 required a total of about 63 hours (2.6 days) to reach the Moon, and Surveyor 5 required 65 hours (2.7 days). The launch weights (at lunar injection) of the seven Surveyors ranged from {{convert|995.2|kg}} to {{convert|1040|kg}}, and their landing weights (minus fuel, jettisoned retrorocket, and radar unit) ranged from {{convert|294.3|kg}} to {{convert|306|kg}}.

Missions

{{Annotated image
|caption=Landing sites of American Surveyor and Apollo programs, together with Soviet Luna program.
|image-width=270
|width=270
|height=260
|imagemap=

Image:Moon landing map surveyor.svg|270px

default

desc none


}}

Of the seven Surveyor missions, five were successful.

Surveyor # Launched from Earth Arrived at Moon Disposition
1 May 30, 1966 June 2, 1966 landed on Oceanus Procellarum
2 September 20, 1966 September 23, 1966 crashed near Copernicus crater
3 April 17, 1967 April 20, 1967 landed on Oceanus Procellarum
4 July 14, 1967 July 17, 1967 crashed on Sinus Medii
5 September 8, 1967 September 11, 1967 landed on Mare Tranquillitatis
6 November 7, 1967 November 10, 1967 landed on Sinus Medii
7 January 7, 1968 January 10, 1968 landed near Tycho crater

Surveyor 6 was the first spacecraft planned to liftoff from the Moon's surface. Surveyor 3 was the first spacecraft to unintentionally liftoff from the Moon's surface, which it did twice, due to an anomaly with Surveyor's Landing Radar, which did not shut off the vernier engines but kept them firing throughout the first touchdown and after it. Apollo 12's Lunar Module Intrepid landed 600 feet from Surveyor 3, as planned. Surveyor 3's TV and telemetry systems were found to have been damaged by its unplanned landings and liftoffs.

Space Race competition

During the time of the Surveyor missions, the United States was actively involved in the Space Race with the Soviet Union. Thus, the Surveyor 1 landing in June 1966, only four months after the Soviet Luna 9 probe landed in February, was an indication the programs were at similar stages.

See also

  • Atlas (rocket family)
  • Luna programme
  • Lunar Orbiter program
  • Ranger program
  • Exploration of the Moon

References

1. ^{{cite web|title=NASA SP-4901|url=http://www.hq.nasa.gov/office/pao/History/SP-4901/chp2.htm&Display=ReadMore|accessdate=31 July 2014}}

External links

  • Surveyor (1966–1968)
  • [https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19690027073_1969027073.pdf Surveyor Program Results (PDF) 1969]
  • [https://archive.org/details/surveyorprogramr00unit Surveyor Program Results (Good Quality Color PDF) 1969]
  • [https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19720019081_1972019081.pdf Analysis of Surveyor 3 material and photographs returned by Apollo 12 (PDF) 1972]
  • Exploring the Moon: The Surveyor Program
  • Details of Surveyor 1 launch, and also the entire program
{{Commons|Surveyor program}}{{Surveyor program|before=Ranger|after=None, see contemporaneous program Lunar Orbiters}}{{Moon spacecraft}}{{NASA planetary exploration programs}}{{Jet Propulsion Laboratory}}{{NASA navbox}}{{Use American English|date=January 2014}}

3 : Surveyor program (NASA)|Missions to the Moon|Derelict landers (spacecraft)

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/23 1:41:16