请输入您要查询的百科知识:

 

词条 Somain-Halluin Railway
释义

  1. History

     Closure 

  2. References

{{no footnotes|date=November 2013}}{{Infobox rail line
|box_width = auto
|name = Somain-Halluin Railway
|status = Partially defunct
|locale = France (Nord-Pas-de-Calais)
|start = Somain
|end = Halluin
|stations =
|open = 1874–1878
|close = 1975–1995 (partially)
|owner = Compagnie des Chemins de fer du Nord Est (1869–1888)
Compangie des Chemins de fer du Nord (1888–1938)
SNCF (1938–1997)
Réseau Ferré de France (1997–present)
|linelength = {{convert|57|km|mi|abbr=on}}
|tracklength =
|tracks = Single track
|gauge = {{RailGauge|sg|allk=on}}
}}

The Somain-Halluin railway was a French standard gauge railway in the Nord-Pas-de-Calais. It was 35 miles long and it linked the town of Somain in the département du Nord with Halluin near the Belgian border, via Orchies and Tourcoing. Today, most of the line is closed to passengers, except a 12-mile section between Orchies and Ascq which is used by TER Nord-Pas-de-Calais.

History

On 15 September 1871, the French North Eastern railway was awarded a concession to construct the Somain to Roubaix & Tourcoing railway. The line aimed to transport coal to support textile industries in the area. Local municipalities had been consulted in June 1871, and a definitive route was published just over three years later on 12 January 1875.

In 1876, the French Northern Railway acquired various railway lines in the area, including the short part of the Somain-Halluin Railway which was then open (10 miles between Somain and Orchies). In 1879, the line reached Tourcoing.

The first section of the line to lose passenger trains was the stretch between Somain and Orchies, where services were withdrawn on 15 May 1939. The section between Ascq and Tourcoing followed six weeks later.

Passenger services were maintained until December 1971 between Toircoing and Halluin.

Closure

After passenger services were withdrawn, freight services continued to use the line. However, most the line was eventually shut down in stages:

  • Halluin to Belgian border: 24 February 1975
  • Wandignies-Hamage to Orchies and Lannoy to Roubaix-Wattrelos: 22 February 1991

References

  • Fascicule Gares et lignes du nord edited by COPEF (Cercle Ouest Parisien d'Études Ferroviaires), 1985.
  • http://telechargement.ter-sncf.com/Images/Nord_Pas_De_Calais/Tridion/fiche_horaires_ligne_3-4_tcm-26-67910.pdf
{{coord missing|France}}{{France-rail-transport-stub}}

2 : Nord (French department)|Standard gauge railways in France

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/12 0:05:32