请输入您要查询的百科知识:

 

词条 TBEA
释义

  1. International operations

     Equipment manufacturing  Construction engineering  Mining 

  2. See also

  3. References

  4. External links

{{Infobox company
| name = TBEA
| logo = TBEA logo.jpg
| type = listed
| traded_as = {{SSE|600089}}
| foundation =
| founder =
| location_city = Changji, Xinjiang
| location_country = China
| location =
| locations =
| area_served =
| key_people =
| industry = Power engineering, electrical equipment manufacturing
| products = {{ubl|Transformers|Cables and wires|Solar power stations|Aluminum ingots}}
| services =
| market cap =
| revenue =
| operating_income =
| net_income =
| assets =
| equity =
| owner =
| num_employees =
| parent =
| divisions =
| subsid =
| homepage = {{url|www.tbea.com}}
| footnotes =
| module = {{Chinese|s=特变电工股份有限公司|altname=Chinese short name|s2=特变电工|order=st|child=yes}}
}}TBEA Co., Ltd., previously known as Tebian Electric Apparatus, is a Chinese manufacturer of power transformers and other electrical equipment, and a developer of transmission projects. Along with competitors Tianwei Baobian Electric (TWBB) and the XD Group, it is one of the major Chinese manufacturers of transformers.[1]

International operations

Equipment manufacturing

Outside of China, TBEA is also coming up with a manufacturing base for transformers, solar equipments & cables in Karjan Gujarat, India.[2] The Indian division is registered under the name TBEA Energy (India) Pvt Ltd and will cater to India, African, Middle East and other markets.

Construction engineering

The company builds transformers and also develops transmission lines as an EPC contractor.

In Ethiopia, TBEA was in 2009 awarded the contract to develop the transmission line to Addis Ababa for the Gilgel Gibe III Dam.[3]

In September 2010 in Zambia, the state power company ZESCO signed an EPC contract with TBEA to build 334 million USD 330 kv high voltage transmission lines, which would supply power to Eastern, Luapula, Northern and Muchinga Provinces.[4] The project held a groundbreaking on July 2012.[4] The project is to include two transmissions lines: one from Pensulo substation in Serenje to Kasama via Mpika, another transmission line from Pensulo substation to Chipata via Msoro and extension of the existing Pensulo substation to accommodate the two transmission line bays.[4]

Mining

In Tajikistan the company was granted in 2015 a mining license to develop a gold deposit in exchange for construction of a combined heat and power (CHP) plant in Dushanbe.[5] Earlier, in 2013, TBEA had received a license to conduct exploration at the deposit area.[5]

See also

  • Quaid-e-Azam Solar Park

References

1. ^{{cite news|title=Resolving Core Concerns|url=http://www.electricalmonitor.com/ArticleDetails.aspx?aid=1468&sid=2|newspaper=Electrical Monitor|date=September 14, 2012}}
2. ^http://tbeaindia.com
3. ^Ethiopian Electric Power Corporation:Gibe III Hydroelectric Project Official Website
4. ^{{cite news|title=Zesco commission 330KV line for Northern and Eastern provinces|url=http://www.lusakatimes.com/2012/07/23/zesco-commission-330kv-line-northern-eastern-provinces/|newspaper=Lusaka Times|date=2012-07-23}}
5. ^{{cite news|title=China to develop Tajik gold deposits|url=http://en.chinamining.com.cn/Investment/2015-01-08/1420686103d70786.html|accessdate=8 January 2015|publisher=China Mining}}

External links

  • {{official website|www.tbea.com}}
{{Power companies of China}}{{Gold mining companies of China}}

5 : Companies listed on the Shanghai Stock Exchange|Electrical engineering companies of China|Companies based in Xinjiang|Electric transformer manufacturers|Chinese brands

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/13 16:17:39