请输入您要查询的百科知识:

 

词条 Balboa Park station
释义

  1. Station layout and services

  2. History

     Southern Pacific Railroad  Streetcars  BART station  Muni service  Modern renovations  Proposed renovations  Geneva Yard buildings restoration 

  3. References

  4. External links

{{good article}}{{use mdy dates|date=October 2017}}{{Infobox station
| name=Balboa Park
| style = BART
| image=Southbound train at Balboa Park station, February 2019.JPG
| image_caption=A southbound BART train at Balboa Park station in 2019
| address=401 Geneva Avenue
San Francisco, California
| coordinates={{coord|37|43|18|N|122|26|51|W|region:US_type:railwaystation|display=inline,title}}
| line=BART M-Line
| other={{bus icon}} Muni: {{Muni route|8}}, {{Muni route|8BX}}, {{Muni route|28R}}, {{Muni route|29}}, {{Muni route|43}}, {{Muni route|49}}, {{Muni route|54}}, {{Muni route|88}}, {{Muni route|91 Owl}}, {{Muni route|714}}
{{bus icon}} Brisbane-Crocker Park BART Shuttle
{{bus icon}} Daly City Bayshore Shuttle
{{bus icon}} Sierra Point BART Shuttle
| platform=1 island platform (BART)
2 side platforms (J and K)
1 side platform (M)
| tracks=2 (BART), 1 loop (J and K), 1 loop (M)
| bicycle=12 lockers
| mpassengers={{rail pass box|passengers=10,868 daily boardings[1]|system=BART|pass_year=2018}}{{rail pass box|passengers=2,760 daily boardings[2]{{rp|34}}|system=Muni Metro|pass_year=2008}}
| opened=November 5, 1973 (BART)[3]
April 23, 1979 (Muni)[4]
| rebuilt=
| ADA=Yes
| code=
| owned=
| zone=
| services={{s-rail|title=BART}}{{s-line|system=BART|line=Red|next=Glen Park|previous=Daly City|notemid=Weekdays only|type=Millbrae|rows2=2}}{{s-line|system=BART|line=Red|previous=Daly City|notemid=Saturdays|type=Daly City|hide2=yes|rows1=3}}{{s-line|system=BART|line=Blue|next=Glen Park|previous=Daly City|hide1=yes}}{{s-line|system=BART|line=Green|next=Glen Park|previous=Daly City|hide1=yes}}{{s-line|system=BART|line=Yellow|next=Glen Park|previous=Daly City}}{{s-rail-next|title=MUNI}}{{s-line|system=MUNI|line=J|next=San Jose and Ocean}}{{s-line|system=MUNI|line=K|previous=Ocean Avenue/CCSF Pedestrian Bridge|type=Ocean|type2=Ocean|rows2=2}}{{s-line|system=MUNI|line=M|previous=San Jose and Mount Vernon|transfer=San Jose and Geneva nolink|type=Ocean View|type2=Ocean View|hide2=yes}}
}}

Balboa Park is a Bay Area Rapid Transit (BART) and Muni Metro station complex located south of Balboa Park in southern San Francisco, California. It is an intermodal hub served by four BART routes, three Muni Metro lines, and a number of Muni bus routes. The station complex also includes two rail yards, Cameron Beach Yard and Green Light Rail Center, where Muni maintains Muni Metro trains and heritage streetcars. BART uses a below-grade island platform on the west side of the complex; Muni Metro routes use several smaller side platforms located on surface-level rail loops around the yards.

The San Francisco and San Jose Railroad opened in 1863, with Elkton station located near the modern site. Passenger service on the line (later the Southern Pacific Railroad Ocean View Branch) ran until about 1922. Electric streetcar service at Balboa Park began in 1892 with the San Francisco and San Mateo Electric Railway, which built a still-standing office building designed by Reid & Reid there in 1901. The United Railroads conglomerate built its Elkton shops on an adjacent parcel in 1907. In the 1960s, BART decided to use the Ocean View Branch right-of-way for part of a rapid transit system. The San Francisco portion of BART, including Balboa Park station, opened on November 5, 1973.

Both streetcar facilities were replaced by modern yards in the 1970s and 1980s. Muni Metro service to the Balboa Park complex began with the K Ingleside line in 1979, followed by the M Ocean View line in 1980 and the J Church line in 1991. In the early 2000s, BART and Muni began planning renovations to improve the accessibility of the station and its connections to the surrounding neighborhoods. A new BART entrance was completed in 2011, followed by new Muni platforms in 2015 and 2017 and an additional footbridge in 2018. Additional improvements like more elevators and modernized headhouses are proposed. The 1901-built office building and an adjacent powerhouse, both abandoned since the 1989 Loma Prieta earthquake, are planned to be renovated as a community center.

Station layout and services

The Balboa Park station complex is centered around an irregular quadrilateral bounded by Ocean Avenue to the north, the Interstate 280 (I-280) cut to the west, Geneva Avenue to the south, and San Jose Avenue to the east. The BART platform—a {{convert|700|ft|m|adj=mid|-long}} island platform—is located below grade on the west side of the complex. It stretches from Ocean Avenue to slightly south of Geneva Avenue.[5] The northern third of the platform, plus a small section at the southern end, is in an open trench; the remainder is under Geneva Avenue and the headhouse structure. The main entrance, located on the north side of Geneva Avenue, leads to a below-street-level fare control area in a mezzanine over the middle of the BART platform. Additional entrances from the south side of Geneva Avenue (via an underpass) and from San Jose Avenue at Geneva Avenue (the Muni entrance) also lead to the fare control area. From the two paid areas in the mezzanine, stairs and escalators connect to the platform.[6] An accessible ramp from Ocean Avenue runs along the west side of the station to a secondary fare control area at the north end of the north paid area.[5] An elevator on the north side of Geneva Avenue connects to the south paid area and the platform.[2]

A Muni Metro rail yard, the Curtis E. Green Light Rail Center, takes up the rest of the block. The east half is occupied by a maintenance building and the west half by open storage tracks, with an administrative building at the south end.[2]{{rp|80}} Muni J Church and K Ingleside trains loop around the outer edge of the yard. Trains enter from Ocean Avenue and drop off passengers at a high-level platform (which is connected to the BART fare mezzanine and the path top San Jose Avenue with a ramp) on the west side of the yard. They lay over on a pair of tracks on the south side of the yard, then pick up passengers at a high-level platform on the east side of the yard adjacent to San Jose Avenue. J Church trains exit the yard there onto tracks on San Jose Avenue (with a separate stop at Ocean Avenue), while K Ingleside trains continue around the loop and exit where they entered.[3]

A second Muni rail yard, the Cameron Beach Yard, is located south of Geneva Avenue and east of San Jose Avenue. It includes a maintenance building, a storage shelter for historic streetcars, open storage tracks, and a currently-abandoned office building and powerhouse.[2]{{rp|81}} M Ocean View loop around Cameron Beach Yard; the last stop for outbound trains is at San Jose and Niagara, one block to the south of Geneva Avenue. The stop does not have a platform; if a passenger needs an accessible platform to alight, the train will proceed across Geneva Avenue to a mini-high platform located at Seneca Avenue. Inbound trains pick up passengers at San Jose and Geneva, which has a concrete platform with a wayside lift for accessibility, after proceeding around the yard loop.[3] An unused set of storage tracks, the Upper Yard, is located on the west side of San Jose Avenue.[2]{{rp|79}}

Balboa Park is a major transfer point for Muni buses, with over 13,000 daily boardings by a 2008 survey.[2]{{rp|34}} Routes {{Muni route|8}}, {{Muni route|8BX}}, {{Muni route|43}}, {{Muni route|54}}, {{Muni route|88}}, {{Muni route|91 Owl}}, and {{Muni route|714}} stop on Geneva Avenue next to the BART station entrances. Routes {{Muni route|29}} and {{Muni route|49}} stop on Ocean Avenue at I-280 and at San Jose Avenue. Route {{Muni route|28R}} stops on San Jose Avenue next to the inbound M stop.[3] The 28R stop is also used by the weekend-only early-morning {{Muni route|K Owl}} and {{Muni route|M Owl}} routes, and several shuttles including the Brisbane-Crocker Park Shuttle and the SamTrans Daly City Bayshore Shuttle.[4][5]

{{clear left}}

History

Southern Pacific Railroad

The San Francisco and San Jose Railroad (SF&SJ) opened through San Francisco on October 16, 1863, and was merged into the Southern Pacific Railroad (SP) in 1868.[18] The line had several stops within San Francisco, including Elkton, located on the east side of the tracks {{convert|300|feet|sigfig=1}} south of Ocean Avenue.[6] It was primarily a freight station for nearby farms, though it also served the nearby Industrial School as well as residential neighborhoods that were laid out in the 1860s.[7] However, the railroad was not very useful to local residents: high fares discouraged both passengers and freight, and on-street running in the Mission District made the ride slow.[8] After the SP opened the faster Bayshore Cutoff in 1907, the original mainline through San Francisco was reduced to a minor freight branch (the Ocean View Branch) with minimal passenger service.[6]

SP passenger service on the Ocean View Branch was limited to a few daily locals after 1907, and just one daily round trip after June 1919.[6] Regular passenger service on the branch ended around 1922, though freight service continued. The tracks were abandoned north of Ocean Avenue (up to 23rd Street) on August 10, 1942, and south of Ocean Avenue (to at least Daly City) after a 1956 excursion train.[6] The Southern Freeway was constructed partially on the abandoned right-of-way in the 1960s; the section through Balboa Park was completed in 1964.[9][10] As part of the highway, pedestrian ramps were built at Ocean Avenue to allow passengers on highway express buses to transfer to local transit.[9]

Streetcars

Electric streetcar service began with the San Francisco and San Mateo Electric Railway (SF&SM) on San Jose Avenue on April 27, 1892.[28][11] It was followed in December 1895 by a Market Street Railway spur on Ocean Avenue, branching off their Mission Street line.[8]{{rp|24}} In 1900, the SF&SM bought land on the southeast corner of San Jose Avenue and Geneva Avenue to construct its main facilities.[31] Construction began on July 14, 1900.[32] A office building along San Jose Avenue—designed by Reid & Reid—opened on April 22, 1901, followed by an adjacent powerhouse in 1903.[31][32] The SF&SM and the Market Street Railway were both absorbed into the United Railroads (URR) congolmerate in 1902.[12] After the 1906 San Francisco earthquake, the URR rerouted the San Mateo line to Mission Street; Embarcadero–Daly City route 26 continued to operate on San Jose Avenue.[11][37]{{rp|105}}

In 1907, while expanding its streetcar network after the |previous year's earthquake]], the URR hurriedly opened its Elkton shops next to the SP's Elkton station.[38]{{rp|140}} The shops occupied a parcel bounded by San Jose Avenue to the east, the SP line to the west, Ocean Avenue to the north, and Geneva Avenue to the south.[8]{{rp|28}} The SP line was used to deliver materials to the yard.[6] On September 16, 1909, the SF&SM yard was renamed Geneva Yard.[13] The powerhouse, damaged in the earthquake, was rebuilt in 1910.[12] In 1917, during a violent strike of URR operators, strike-brakers were temporarily housed in the office building. A wooden staircase was constructed from the second floor directly to the carbarn.[14][15]

The URR was renamed as the Market Street Railway in 1921, and purchased by the city-owned San Francisco Municipal Railway (Muni) in 1944.[12] The merger and the impending end of World War II (which had limited the availability of rubber tires) prompted the conversion of many streetcar routes to bus or trolleybus. Route 26 had previously been discontinued in 1938 and soon replaced by a branch (itself closed on November 5, 1939) of the route 9 streetcar.[37] Route 26 service resumed on September 23, 1944, but was replaced by buses on February 4 1945, ending streetcar service on San Jose Avenue.[37] Muni's K Ingleside line was extended on Ocean Avenue and Onondaga Street to Mission Street on April 8, 1945, as the ex-MSR line on Ocean Avenue was converted to bus.[16] K Ingleside service was cut back to Phelan Loop on October 10, 1952; however, Geneva Yard was retained as the yard for the remaining streetcar system.[16][38] The southern portion of the Elkton lot, as well as the parcel across Geneva Avenue to the south, were used for bus storage.[17][12]

BART station

Even before the Ocean View Branch was abandoned, several proposals for rapid transit aimed to use the Ocean View Branch route (usually in conjunction with a Mission Street subway) and its Bernal Cut to avoid expensive tunneling through San Francisco's hills.[18] Early plans for BART around 1960 considered several different routings for the Peninsula Line (then planned to extend to Palo Alto): the Bayshore Cutoff, the existing Twin Peaks Tunnel, a new bored tunnel crossing diagonally under the Mission District, and a Mission Street tunnel continuing via Alemany Boulevard.[19][20][21] By 1961, the Mission Street tunnel and reuse of the Ocean View Branch was favored, with a station at Ocean Avenue.[57] The plan was approved by voters in 1962.[22]

Early BART plans referred to many stations by the cross street, but most stations were ultimately named for the surrounding neighborhood or city.[23] The Ocean Avenue station was named Balboa Park after the nearby municipal park by 1967.[24] The station was sandwiched between I-280 and Elkton shops, a sliver of which was taken for construction.[8]{{rp|28}} Construction of the station was 60% complete by mid-1970, with work expected to be finished the next year.[25] The San Francisco portion of BART, including Balboa Park station, opened on November 5, 1973.[26]

Rather than having a single architecture firm design every station, BART had a number of architects (mostly local) design one or several stations each "so that each station will achieve a character of its own, suitable to its own unique environment".[27] Balboa Park and Glen Park were designed by Ernest Born (who also designed the systemwide station signage) and Corlett & Spackman, with landscape work by Douglas Bayliss.[28] Both stations were designed in the brutalist style, with Balboa Park the "smaller and more intimate".[29] It has headhouses on each side of Geneva Avenue, sized to be appropriate to the surrounding residential neighborhoods. Original plans called for a bus parking deck over the platform, but a late decision to omit it (Woods Division in the Dogpatch neighborhood was built instead) allowed for the north and south ends of the platform to be in open air.[29] The walls of the platform area are covered with linear precast concrete forms, with five patterns repeated eightfold to generate "an apparently infinite variety".[29] Other elements praised by architectural critics included overhead power conduits on the platform level, and the interplay of light and shadow among the geometric forms of the mezzanine.[29]

Muni service

As Muni began transitioning from aging PCC streetcars to the Boeing USLRV in the 1970s, Elkton shops and the old car barn in Geneva Yard (which had been Muni's only rail yard since 1956) required modernization.[17]{{rp|134}} Elkton Shops was closed on May 30, 1977, and replaced with a new facility.[17][8]{{rp|28}} This Metro Rail Center included a loop track around its periphery, with an alighting area adjacent to the BART fare mezzanine in the southwest corner and a boarding area near San Jose Avenue in the southeast corner, plus a stop in the northeast corner of the yard. Some K Ingleside shuttle service was extended to Balboa Park on April 23, 1979, and all weekday service ran to Balboa Park after the line was converted to Muni Metro light rail operation on December 17, 1980.[30]{{rp|58}}[16] The Metro Rail Center was named the Curtis E. Green Light Rail Center in 1987. Green had become after Muni's general manager in 1974—the first African-American to lead a major transit system in the US—and retired in 1982.[31][32] The Geneva Yard car barns were demolished in the 1970s or 1980s; streetcars were stored in the open air.[14] A second Muni Metro line, the M Ocean View, was extended to the station complex on August 30, 1980; it usually looped around Green Yard, but used the Geneva Yard loop at times.[17][30]{{rp|58}} For some time beginning in 1982, the K and M lines were through-routed to avoid the yard loop.[80]

In 1972, Muni began planning an long-proposed extension of the J Church line along San Jose Avenue (a section of which was built along the former Ocean View Branch through the Bernal Cut) to Balboa Park. The extension was intended to provide transit service to the Outer Mission, allow J Church and N Judah trains to access the carhouses via San Jose Avenue rather than a roundabout route via the K Ingleside line, and allow future through-routing of the J and M lines.[33] Construction on the extension began in January 1989, but was delayed by the earthquake later that year.[30]{{rp|70}} On August 31, 1991, J and N streetcars began using the extension to access the yards, thus providing revenue J service to Balboa at limited hours. Full-time revenue service began June 19, 1993.[30]{{rp|70}}

The extension included a new stop for the J line at San Jose and Ocean; inbound K trains also stopped at a plaza near that intersection.[34]{{rp|24}} An small accessible platform was built east of Green Yard, next to the northbound track on San Jose at Seneca, to allow the planned through-routing. (Southbound trains were to use the existing alighting and boarding area on the Green Yard loop; a small accessible platform was available on the west side of the yard loop, north of the main alighting area.) However, although some weekday J and M service was through-routed from 1995 to 1998, full through-routing was never implemented.[30]{{rp|79}} Instead, J trains shared the revenue loop around Green Yard with K trains, using the same boarding and alighting areas. J trains were diverted onto an inner track between the accessible platform and the boarding area; an underpass under the K track connected the J alighting area to the fare mezzanine. This allowed J and K trains to lay over separately so that irregular operations on one line would not impact the other.[34]{{rp|26–29}}

Modern renovations

In 2002, BART released the Comprehensive Station Plan, which indicated a need for improved entrances and access at the station.[35] The San Francisco Board of Supervisors approved the Balboa Park Area Plan in May 2009, setting the stage for a number of transit and pedestrian improvements to the station complex.[36][37] Three projects—the Westside Walkway, the Eastside Connector, and new Muni boarding and alighting platforms—were prioritized and funded.[34]{{rp|100}} As constructed, the BART station only had direct access from Geneva Avenue; a non-accessible pathway on the west side of the station was the only official route from Ocean Avenue, though many passengers took a shorter but dangerous route through the Muni yard instead.[34]{{rp|52}} The Westside Walkway replaced the northern half of the path with a concrete ramp that leads to a new set of faregates at the north end of the headhouse, thus providing a shorter and fully accessible entrance from Ocean Avenue and the nearby City College of San Francisco (for which the station is the main transit access.[38]) The walkway was opened on April 15, 2011.[39]

In September 2014, Muni began construction of an accessible 1-car-length high-level platform on the east side of the yard, adjacent to San Jose Avenue, to allow level boarding for all inbound J and K riders. This platform replaced a narrow, non-accessible boarding area on the south end of the yard loop. The J and K lines were rerouted onto San Jose Avenue during construction.[40][41] The new platform was opened on April 27, 2015, with both lines immediately rerouted back to the loop around the yard. The K stop at the northeast corner of the yard was permanently closed on April 25.[42] Red-painted bus lanes were added on westbound Geneva Avenue between Delano Avenue and I-280 in March 2016.[43]

On May 31, 2016, BART began construction of the Eastside Connector project, a northward expansion of the headhouse over the open BART platform with improved connections between Muni and BART.[44] In September 2016, Muni began construction of its section of the project—a longer high-level deboarding platform to replace the mini-high platform on the west side of the yard. This work was coordinated with rail replacement in the yard and widening the pedestrian walkway to San Jose Avenue. The J Church line was rerouted onto San Jose Avenue, while the K Ingleside was cut back to City College Pedestrian Bridge.[45][46] The K was returned to the loop on May 20, 2017, while the J remained on San Jose Avenue until November 18.[47][48] The steel deck beams were lifted into place on July 16, 2017.[49] The renovations were completed with the opening of the Eastside Connector on November 30, 2018.[50]

The opening of the Muni Metro East facility on the T Third Street line in 2008 reduced storage needs at Geneva Yard. The Upper Yard was closed, and the main yard increasingly dedicated to Muni's historic streetcar fleet. On December 2, 2010, Muni and the Market Street Railway nonprofit orgaization opened a 6-track shelter at the yard to house 24 historic streetcars. The $10.1 million structure forms the primary storage and maintenance area for the historic fleet.[51] On October 25, 2011, the yard was renamed Cameron Beach Yard after a recently deceased member of the SFMTA Board of Directors.[52] From June 21, 2014 to June 16, 2018, the historic streetcar fleet was stored at Muni Metro East rather than Cameron Beach Yard, as the latter was needed for LRVs displaced by Green Yard rail replacement work.[53]

Proposed renovations

In 2012, Muni released the Balboa Park Station Capacity and Conceptual Engineering Study, which analyzed a number of possible improvements to the station area to guide future project choices. Projects recommended by the report (along with those discussed above) included:

  • Improvements to wayfinding signage, lighting, real-time information screens, and bus shelters[34]{{rp|101–106}}
  • An additional elevator on the south side of Geneva Avenue[34]{{rp|107–108}}
  • Extension of the J line along San Jose Avenue, taking over M service east of 19th Avenue. A new K-only platform would be built at the southern end of the yard, with new retail space above. Previous proposals for a stub-end or loop terminal over I-280 for the J and K lines were deemed infeasible.[34]{{rp|125–134}}
  • Full-length high-level platforms for the M or extended J in the median of San Jose Avenue at Geneva Avenue. The report recommended farside platforms (served after trains pass the intersection), rather than having both platforms north of Geneva Avenue.[34]{{rp|135–143}}
  • Creation of a kiss-and-ride cul-de-sac on the existing access road on the west side of the Upper Yard[34]{{rp|147–155}}
  • New westbound transit-only lane and bus stop island on Ocean Avenue north of the station[34]{{rp|163}}
  • A deck over I-280 (estimated to cost between $1.3 and $2 billion), including a possible single-point urban interchange[34]{{rp|147–155}}

The 2011 plan for a rerouting of the M Ocean View through Parkmerced assumed that the M would continue to terminate at Balboa Park. Initial plans in 2014 for a 19th Avenue subway had the M divide into two branches, one terminating at Parkmerced and the other at Balboa Park. A 2016 update to the plan called for the J Church to continue on San Jose Avenue at Balboa Park and take over existing M service as far as San Francisco State University station.[54]

In March 2018, BART released preliminary plans for the next round of modifications to the station. The project would include modern headhouses on both sides of Geneva Avenue, an elevator connecting the south side of Geneva Avenue to the pedestrian underpass and the platform, an elevator connecting the north side of Geneva Avenue to the Muni platform level and fare mezzanine, platform canopies and seating, and new interior finishes and public art.[55]

Geneva Yard buildings restoration

{{infobox NRHP
|name=Geneva Office Building and Power House
|image=Geneva Office Building and Power House, 2301 San Jose Ave., San Francisco, CA 6-12-2011 5-58-33 PM.JPG
|caption=The office building and powerhouse in 2011
|built=1901
|architect=Reid & Reid
|refnum=10000111
|added=March 31, 2010[117]
|location=2301 San Jose Avenue
San Francisco, California
|architecture=Queen Anne, Romanesque[56]
}}

The office building at Geneva Yard was designated a San Francisco Landmark by the San Francisco Board of Supervisors in 1985.[119] After being damaged in the 1989 Loma Prieta earthquake, the office building and powerhouse were red-tagged and abandoned.[120] In 1998, Muni planned to demolish the structures to create a parking lot; the agency dropped the plans the next year due to community opposition and the intervention of mayor Willie Brown.[121][57] The nonprofit group Friends of the Geneva Office Building (later Friends of the Geneva Car Barn and Powerhouse) was formed with the intention of instead renovating the buildings for community use.[119][12]

Muni completed initial stabilization of the structures in 1999.[58] In March 2004, control of the buildings was transferred to the San Francisco Recreation and Park Department.[12] Over the next 11 years, the Department and the Friends spent $3.98 million on repairs, design, and other work related to the buildings.[127] Additional stabilization and seismic refit of the structures was begun in 2004 and completed in 2006.[12][59] The buildings were added to the National Register of Historic Places on March 31, 2010 as Geneva Office Building and Power House.[60]

The city gave the Friends of the Geneva Car Barn control of the building in 2014, but reclaimed it in 2015 when the group had difficulties raising funds.[119][127]{{rp|12}} In June 2017, the Department budgeted $3 million from a 2012 parks bond, bringing available funding to $11 million.[57] The next month, the city announced that it would receive $3.5 million in state funds for the project—enough to complete renovations of the powerhouse.[61] The city accepted the grant in December.[62][63]{{rp|1}} A groundbreaking ceremony for the $14 million powerhouse renovation was held in March 2018.[64] The car barn restoration is estimated to cost $38.5 million; the city intends to begin in 2020, but {{as of|March 2018|lc=yes}} funding has not been obtained.[64][63]{{rp|15}}

{{clear}}

References

1. ^{{cite web |url=http://www.bart.gov/about/reports/ridership |title=Monthly Ridership Reports |publisher=San Francisco Bay Area Rapid Transit District |accessdate=April 4, 2018}}
2. ^{{cite web |title=Balboa Park Station Map |publisher=San Francisco Bay Area Rapid Transit District |url=http://www.bart.gov/stations/balb/map |archiveurl=https://web.archive.org/web/20160725121633/http://www.bart.gov/stations/balb/map |archivedate=July 25, 2016 |access-date=April 4, 2018 |dead-url=no |df=mdy-all }}
3. ^{{cite web |url=http://www.actransit.org/wp-content/uploads/HSP_BALB-sched.pdf |title=Schedules and Fares: Balboa Park Station |date=December 21, 2017 |publisher=Metropolitan Transportation Commission}}
4. ^{{cite web |url=http://www.samtrans.com/schedulesandmaps/shuttles/DalyCityBayshoreShuttle.html |title=Daly City Bayshore Shuttle |publisher=San Mateo County Transit District |date=September 6, 2016}}
5. ^{{cite web |url=https://www.commute.org/shuttles/routes-and-schedules/16-brisbane-crocker-park-bartcaltrain |title=Brisbane-Crocker Park BART/Caltrain |publisher=Peninsula Traffic Congestion Relief Alliance }}
6. ^{{cite book |title=When Steam Ran on the Streets of San Francisco |first1=Walter |last1=Rice |first2=Emiliano |last2=Echeverria |pages=61–70 |year=2002 |publisher=Harold E. Cox}}
7. ^{{cite book |url=http://www.askmar.com/Railroad/1941%20Peninsula%20History.pdf |title=History of the San Francisco & San Jose Railroad |first=Louis Richard |last=Miller |date=June 1941 |pages=21, 62}}
8. ^{{cite web |url=http://www.outsidelands.org/OMI-small-feb2010.pdf |title=San Francisco’s Ocean View, Merced Heights, and Ingleside (OMI) Neighborhoods: 1862–1959 |publisher=San Francisco Historic Preservation Fund Committee |pages=14–21, 24 |first1=Richard |last1=Brandi |first2=Woody |last2=LaBounty}}
9. ^{{cite magazine |url=http://libraryarchives.metro.net/DPGTL/Californiahighways/chpw_1964_julaug.pdf |title=New S.F. Freeway |magazine=California Highways and Public Works |date=July–August 1964 |pages=9–17 |publisher=Division of Highways, Department of Public Works, State of California |first=Haig |last=Ayanian}}
10. ^{{cite magazine |url=http://libraryarchives.metro.net/DPGTL/Californiahighways/chpw_1964_novdec.pdf |title=Construction Progress |magazine=California Highways and Public Works |date=November–December 1964 |page=20|publisher=Division of Highways, Department of Public Works, State of California}}
11. ^{{cite web |url=https://www.sfmta.com/blog/sfs-first-electric-streetcar-line-opened-125-years-ago-today |title=SF's First Electric Streetcar Line Opened 125 Years Ago Today |publisher=San Francisco Municipal Transportation Authority |date=April 27, 2017 |first=Jeremy |last=Menzies}}
12. ^{{cite web |url=http://www.genevacarbarn.org/pdf/conceptPlanReport.pdf |title=Conceptual Plan: Geneva Office Building and Power House |publisher=Friends of the Geneva Office Building & Powerhouse |date=May 2004 |author=Carey & Co. |page=s2-8}}
13. ^{{cite book |title=San Francisco's Interurban to San Mateo |publisher=Arcadia Publishing |year=2005 |pages=9–11 |isbn=9780738530086 |first1=Walter |last1=Vielbaum |first2=Emiliano |last2=Echeverria |first3=Don |last3=Holmgren |first4=Robert |last4=Townley |first5=Walter |last5=Rice}}
14. ^{{cite web |url=http://ohp.parks.ca.gov/pages/1067/files/geneva%20office%20building%20nr%20draft.pdf |title=National Register of Historic Places Registration Form |publisher=United States Department of the Interior |first1=Bridget |last1=Maley |first2=Sara |last2=Lardinois}}
15. ^{{cite web |url=https://www.sfmta.com/blog/geneva-car-house-115-years-transit-history-balboa-park |title=The Geneva Car House: 115 of Years Transit History at Balboa Park |publisher=San Francisco Municipal Transportation Agency |date=December 8, 2016 |first=Jeremy |last=Menzies}}
16. ^{{cite book |title=San Francisco's Century of Street Cars |first=Fred A. |last=Stindt |pages=38, 91, 105, 112, 189 |date=October 1990 |isbn=0961546514}}
17. ^{{cite book |title=Inside Muni: The Properties and Operations of the Municipal Railway of San Francisco |publisher=Interurban Press |first1=John |last1=McKane |first2=Anthony |last2=Perles |pages=134, 140, 200 |isbn=0916374491 |year=1982}}
18. ^{{cite book |url=https://archive.org/details/reportonrapidtra1935ridg |title=Report on Rapid Transit for San Francisco |page=5 |last1=Ridgway |first1=Robert |last2=Brahdy |first2=Alfred |via=Internet Archive |year=1935 |publisher=San Francisco Public Utilities Commission}}
19. ^{{cite web |url=https://www.flickr.com/photos/walkingsf/4081268374/in/album-72157622518181915/ |title=General Map: June 6, 1960 Routes: Peninsula line via Bayshore |publisher=San Francisco Bay Area Rapid Transit District |date=June 6, 1960 |via=Erik Fischer on Flickr}}
20. ^{{cite web |url=https://www.flickr.com/photos/walkingsf/4080517729/in/album-72157622518181915/ |title=General Map: June 6, 1960 Routes: Peninsula line via Mission-Alemany |publisher=San Francisco Bay Area Rapid Transit District |date=June 6, 1960 |via=Erik Fischer on Flickr}}
21. ^{{cite book |url=https://archive.org/stream/annualreportsanf1959sanf#page/5/mode/2up |title=Annual Report for the Period Ending June 30, 1960 |publisher=San Francisco Bay Area Rapid Transit District |year=1960 |page=5 |via=Internet Archive}}
22. ^{{cite book |title=BART: The Dramatic History of the Bay Area Rapid Transit System |first=Michael |last=Healy |publisher=Heyday |year=2016 |isbn=9781597143707 |pages=59}}
23. ^{{cite book |url=http://libraryarchives.metro.net/DPGTL/bart/1961-parsons-engineering-report-to-sf-bart-district.pdf |title=Engineering Report to the San Francisco Bay Area Rapid Transit District |author=((Parsons Brinkerhoff, Tudor, Bechtel)) |date=June 1961 |page=4}}
24. ^{{cite book |url=https://archive.org/stream/annualreportsanf1964sanf#page/40/mode/2up |title=Annual Report 1966/1967 |publisher=San Francisco Bay Area Rapid Transit District |year=1967 |page=14 |via=Internet Archive}}
25. ^{{cite book |url=https://archive.org/stream/annualreportsanf1964sanf#page/76/mode/2up |title=1969-70 Annual Report |publisher=San Francisco Bay Area Rapid Transit District |year=1970 |page=4 |via=Internet Archive}}
26. ^{{BART History|page=4}}
27. ^{{cite book |url=https://archive.org/stream/annualreportsanf1964sanf#page/2/mode/2up |title=Annual Report 1964/1965 |publisher=San Francisco Bay Area Rapid Transit District |year=1965 |page=3 |via=Internet Archive}}
28. ^{{cite book |title=An Architectural Guidebook to San Francisco and the Bay Area |url=https://books.google.com/books?id=FkVQx6MWa8MC&lpg=PR1&pg=PA204#v=onepage&q&f=false |first=Susan Dinkelspiel |last=Cerny |year=2007 |page=501 |publisher=Gibbs Smith |isbn=9781586854324 |via=Google Books}}
29. ^{{cite journal |journal=Architectural Record |title=Two BART Stations |date=November 1974 |pages=113–120 |volume=156 |issue=11}}
30. ^{{Muni Chronology|pages=58, 70, 79}}
31. ^{{cite news |url=https://www.sfgate.com/bayarea/article/Curtis-E-Green-rose-from-bus-driver-to-head-2816575.php |title=Curtis E. Green -- rose from bus driver to head of S.F. Muni |newspaper=San Francisco Chronicle |date=July 31, 2002 |first=Carl |last=Nolte}}
32. ^{{cite web |url=https://www.sfmta.com/blog/curtis-green-transportation-industry-trailblazer |title=Curtis Green, a Transportation Industry Trailblazer |publisher=San Francisco Municipal Transportation Agency |date=January 31, 2017 |first=Lori |last=Phelan}}
33. ^{{cite book |url=https://archive.org/details/j-church-extension-feir |title=Muni J Line Connection Project Final Environmental Impact Statement |date=May 1983 |publisher=Urban Mass Transit Administration and San Francisco Department of City Planning |via=Internet Archive |pages=1–4, 94–97}}
34. ^10 11 12 13 14 15 {{cite web |title=Balboa Park Station Capacity and Conceptual Engineering Study Final Report |url=https://www.sfmta.com/sites/default/files/agendaitems/11-6-12item11balboaparkphaseii-revisedpublicdraftreportoct2012accessibleforboard.pdf |date=October 2012 |publisher=San Francisco Municipal Transportation Agency |author1=Jacobs |author2=San Francisco Municipal Transportation Agency}}
35. ^{{cite book |url=https://www.bart.gov/sites/default/files/docs/BalboaParkCSPpartC.pdf |title=Balboa Park Comprehensive Station Plan |date=September 2002 |publisher=San Francisco Bay Area Rapid Transit District}}
36. ^{{cite web |url=http://sf-planning.org/balboa-park-station-area-plan |archiveurl=https://web.archive.org/web/20180402031520/http://sf-planning.org/balboa-park-station-area-plan |archivedate=April 2, 2018 |title=Balboa Park Station Area Plan |publisher=San Francisco Planning Department}}
37. ^{{cite web |url=http://sf-planning.org/sites/default/files/FileCenter/Documents/1983-Balboa_Park_Station_Area_Plan_v2.pdf |title=Balboa Park Station: An Area Plan of the General Plan of the City and County of San Francisco |date=October 2008 |publisher=San Francisco Planning Department }}
38. ^{{cite web |url=https://www.bart.gov/sites/default/files/docs/2008StationProfileReport_web.pdf |title=2008 BART Station Profile Study |page=7 |publisher=San Francisco Bay Area Rapid Transit District}}
39. ^{{cite press release |url=https://www.bart.gov/news/articles/2011/news20110415 |title=New entrance and walkway at Balboa Park Station |publisher=San Francisco Bay Area Rapid Transit District |date=April 15, 2011}}
40. ^{{cite press release |url=https://www.sfmta.com/projects-planning/projects/balboa-park-station-light-rail-platform-construction-project |archiveurl=https://web.archive.org/web/20150402050542/https://www.sfmta.com/projects-planning/projects/balboa-park-station-light-rail-platform-construction-project |archivedate=April 2, 2015 |date=September 2014 |title=Balboa Park Station Light Rail Platform Construction Project |publisher=San Francisco Municipal Transportation Agency}}
41. ^{{cite press release |url=https://www.sfmta.com/calendar/alerts/balboa-park-station-construction-affects-j-and-k-lines-sept-7-oct-31-2014 |archiveurl=https://web.archive.org/web/20151003134348/https://www.sfmta.com/calendar/alerts/balboa-park-station-construction-affects-j-and-k-lines-sept-7-oct-31-2014 |archivedate=October 3, 2015 |title=Balboa Park Station construction affects J and K lines Sept. 7-Oct. 31, 2014 |date=September 2014 |publisher=San Francisco Municipal Transportation Agency}}
42. ^{{cite press release |archiveurl=https://web.archive.org/web/20150912044802/https://www.sfmta.com/projects-planning/projects/balboa-park-station-light-rail-platform-construction-project |archivedate=September 12, 2015 |url=https://www.sfmta.com/projects-planning/projects/balboa-park-station-light-rail-platform-construction-project |date=April 27, 2015 |title=Balboa Park Station Light Rail Platform Construction Project |publisher=San Francisco Municipal Transportation Agency}}
43. ^{{cite press release |url=https://www.sfmta.com/project-updates/construction-impacts-starting-february-29th-0 |title=Construction Impacts, starting February 29th |date=February 29, 2016 |publisher=San Francisco Municipal Transportation Agency}}
44. ^{{cite press release |url=https://www.bart.gov/news/articles/2016/news20160524 |title=Construction begins at Balboa Park Station 5/31 |publisher=San Francisco Bay Area Rapid Transit District |date=May 24, 2016}}
45. ^{{cite press release |url=https://www.sfmta.com/project-updates/k-ingleside-and-j-church-temporary-service-changes |date=September 6, 2016 |title=K-Ingleside and J-Church Temporary Service Changes |publisher=San Francisco Municipal Transportation Agency}}
46. ^{{cite web |url=https://www.sfmta.com/projects-planning/projects/balboa-park-station-area-and-plaza-improvements |archiveurl=https://web.archive.org/web/20161013052716/https://www.sfmta.com/projects-planning/projects/balboa-park-station-area-and-plaza-improvements |archivedate=October 13, 2016 |title=Balboa Park Station Area and Plaza Improvements |publisher=San Francisco Municipal Transportation Agency}}
47. ^{{cite press release |url=https://www.sfmta.com/calendar/alerts/k-ingleside-service-balboa-park-station-restored |date=May 20, 2017 |title=K-Ingleside Service at Balboa Park Station Restored |publisher=San Francisco Municipal Transportation Agency}}
48. ^{{cite web |url=https://sunnysideassociation.wordpress.com/2017/11/14/sfmta-update-on-balboa-park-station-area-improvements-re-j-church/ |title=SFMTA: Update on Balboa Park Station Area Improvements (re J-Church) |publisher=Sunnyside Neighborhood Association |date=November 14, 2017}}
49. ^{{cite press release |url=https://www.bart.gov/news/articles/2017/news20170630-1 |title=Construction begins with single-tracking at Balboa Park 7/16 |publisher=San Francisco Bay Area Rapid Transit District |date=June 30, 2017}}
50. ^{{cite press release |url=https://www.sfmta.com/blog/new-improvements-debut-balboa-park-station |title=New Improvements Debut at Balboa Park Station |publisher=San Francisco Municipal Transportation Agency |first=Erica |last=Kato |date=November 30, 2018}}
51. ^{{cite press release |url=https://archives.sfmta.com/cms/apress/SFMTAandMSRUnveilNewStreetcarCanopyandNewlyRestoredHistoricStreetcar.htm |title=SFMTA and MSR Unveil New Streetcar Canopy and Newly Restored Historic Streetcar |publisher=San Francisco Municipal Transportation Agency |date=December 2, 2010}}
52. ^{{cite press release |url=https://archives.sfmta.com/cms/apress/SFMTARenamesHistoricStreetcarYardforCameronBeach.htm |title=SFMTA Renames Historic Streetcar Yard for Cameron Beach |publisher=San Francisco Municipal Transportation Agency |date=October 25, 2011}}
53. ^{{cite web |url=https://www.streetcar.org/historic-streetcars-move-back-home-tonight/ |title=Historic Streetcars Move Back Home Tonight |publisher=Market Street Railway |date=June 15, 2018}}
54. ^{{cite web |url=https://www.sfmta.com/sites/default/files/projects/2016/Station%204%20Miscellaneous.pdf |title=Station 4: Miscellaneous |publisher=San Francisco Municipal Transportation Agency |date=February 2016 |page=1}}
55. ^{{cite web |url=http://www.bart.gov/sites/default/files/docs/Balboa%20Park%20Station%20Mod%20Boards_0.pdf |title=Balboa Park Station Modernization Boards |publisher=San Francisco Bay Area Rapid Transit District |date=March 2018}}
56. ^{{cite web |url=http://ohp.parks.ca.gov/pages/1067/files/geneva%20office%20building%20nr%20draft.pdf |title=National Register of Historic Places Registration Form: Geneva Office Building and Power House |date=July 14, 2009 |publisher=California Office of Historic Preservation |first1=Bridget |last1=Maley |first2=Sara |last2=Lardinois |pages=8.15–17}}
57. ^{{cite web |url=https://www.streetcar.org/geneva-car-barn-powerhouse-gets-funding/ |title=Geneva Car Barn & Powerhouse Gets Funding |publisher=Market Street Railway |date=June 16, 2017}}
58. ^{{cite web |url=http://www.sfbos.org/ftp/uploadedfiles/bdsupvrs/committees/materials/BF040214_140034.pdf |title=Ordinance waiving the competitive solicitation requirement under Municipal Code, Section 6.40, and authorizing the General Manager of the Recreation and Parks Department to enter into a Professional Services Agreement with Aidlin Darling Design in the amount of $838,000 for the purpose of completing the design and construction documents for the Geneva Car Barn and Powerhouse Project, to commence following board approval. |date=April 2, 2014 |publisher=San Francisco Budget and Finance Committee |page=2}}
59. ^{{cite web |url=http://sfrecpark.org/project/geneva-car-barn-improvements/ |title=Geneva Car Barn Improvements |publisher=San Francisco Recreation and Park Department}}
60. ^{{cite web |url=http://www.parks.ca.gov/pages/1067/files/draft%20april%202010%20meeting%20agenda.pdf |title=Regular Quarterly Meeting of the State Historical Resources Commission: Agenda |page=3 |publisher=California Department of Parks and Recreation |date=April 30, 2010}}
61. ^{{cite news |url=https://www.sfchronicle.com/politics/article/Geneva-Car-Barn-en-route-to-new-life-as-arts-11268434.php |title=Geneva Car Barn en route to new life as arts center |newspaper=San Francisco Chronicle |date=July 6, 2017 |first=Dominic |last=Fracassa |accessdate=March 7, 2018}}
62. ^{{cite news |url=http://www.sfweekly.com/news/old-muni-facility-to-become-community-center/ |title=Old Muni Facility to Become Community Center |newspaper=SF Weekly |first=Ida |last=Mojadad |date=December 13, 2017 |accessdate=March 7, 2018}}
63. ^{{cite web |url=https://sfgov.legistar.com/View.ashx?M=F&ID=5687931&GUID=93CA9F7E-C29D-406D-9A7E-67293602091B |title=Committee Report, Board Meeting |publisher=San Francisco Board of Supervisors Budget and Finance Committee |date=December 12, 2017 |first=Linda |last=Wong |pages=1, 11–19}}
64. ^{{cite news |url=http://www.sfexaminer.com/renovation-project-historic-geneva-car-barn-breaks-ground/ |title=Renovation project at historic Geneva Car Barn breaks ground |newspaper=San Francisco Examiner |date=March 19, 2018 |first=Sadie |last=Gribbon |accessdate=April 3, 2018}}

External links

{{commons category multi|Balboa Park station complex|Balboa Park}}
  • BART: Balboa Park
  • 1967 station drawings: [https://www.flickr.com/photos/walkingsf/6074881130/in/album-72157627504054824/ Street Plan]; [https://www.flickr.com/photos/walkingsf/6074881228/in/album-72157627504054824/ Mezzanine & Platform Plans and Longitudinal Section]; [https://www.flickr.com/photos/walkingsf/6074340477/in/album-72157627504054824/ Transverse Section]
  • Balboa Park Station Modernization Plan; [https://www.bart.gov/about/projects/balboa Balboa Park Phase 2 Eastside Project]
  • SFMTA: [https://www.sfmta.com/stops/san-jose-ave-geneva-ave-17778 San Jose and Geneva] (J and K); [https://www.sfmta.com/stops/san-jose-ave-geneva-ave-16262 San Jose and Geneva] (M)
  • Friends of the Geneva Car Barn and Powerhouse
  • Recreation and Parks Department: Geneva Car Barn Improvements
{{Bay Area Rapid Transit}}{{Muni}}{{Bay Area Rail Stations}}

4 : Bay Area Rapid Transit stations in San Francisco|Muni Metro stations|Railway stations opened in 1973|1973 establishments in California

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/30 1:44:19