请输入您要查询的百科知识:

 

词条 USS John D. Henley (DD-553)
释义

  1. Service history

  2. Honors

  3. References

  4. External links

{{other ships|USS Henley}}{{Infobox ship image
Ship image=Ship caption=
}}{{Infobox ship career
Hide header=Ship country=United States1946}}Ship name=Ship namesake=John D. HenleyShip ordered=Ship builder=Gulf Shipbuilding Corporation, Chickasaw, AlabamaShip laid down=21 July 1941Ship launched=15 November 1942Ship acquired=Ship commissioned=2 February 1944Ship decommissioned= 30 April 1946Ship in service=Ship out of service=Ship struck=1 May 1968Ship reinstated=Ship honours=Ship fate=Sold May 1970, and scrappedShip status=Ship notes=
}}{{Infobox ship characteristics
Hide header=Header caption=Ship class=Fletcher class destroyerShip displacement=2,050 tonsShip length=376 ft 6 in (114.7 m)Ship beam=39 ft 8 in (12.1 m)Ship draft=17 ft 9 in (5.4 m)Ship propulsion=60,000 ;shp (45 MW); 2 propellers35|kn|lk=in}}Ship range=6,500 nm @ 15 kn (12,000 km @ 28 km/h)Ship complement=273Ship sensors=Ship EW=Ship armament={{Fletcher class destroyer armament}}Ship armor=Ship aircraft=Ship aircraft facilities=Ship notes=
}}

USS John D. Henley (DD-553), a Fletcher-class destroyer, was a ship of the United States Navy named for Captain John D. Henley (1781–1835).

John D. Henley was laid down on 21 July 1941 by Gulf Shipbuilding Co., Chickasaw, Ala.; launched on 15 November 1942, sponsored by Miss Shelah Keith Kane, great-great-great-granddaughter of Captain Henley; and commissioned on 2 February 1944, Commander C. H. Smith in command.

Service history

Following exhaustive shakedown training out of Bermuda, the new destroyer arrived Norfolk on 28 March 1944. Sailing for the Pacific via the Panama Canal, she arrived Pearl Harbor on 23 April 1944. After operational training, John D. Henley escorted fleet oilers to Majuro and returned on 17 May. She departed on 27 May for Majuro once more and there became flagship of a refueling task group. Departing on 6 June 1944, the ships moved to the Marianas to refuel the fleet during the capture and occupation of Saipan and Tinian. During this long at-sea period the ships came under air attack 17–18 June. They returned to Eniwetok 14 August.

As the Navy's mobile amphibious forces prepared to move into the Palaus, Henley joined Task Group 30.8 (TG 30.8) and departed Manus 1 September as flagship of the refueling group during strikes on Peleliu and its eventual capture. The oilers and their escorts continued to operate out of Ulithi well into November, supporting the vast aircraft carrier task forces striking the Philippines. This unit, headed by Captain J. T. Acuff, had much to do with the great success of the wide-ranging carrier forces.

In December, the destroyer moved to Guam for independent operation as an escort and patrol ship in the Marshall and Mariana Islands. She then steamed to Ulithi, where she arrived 31 January 1945 to undergo operational training in covering Underwater Demolition Teams. She sailed 14 February for the next major landing on the island road to Japan, Iwo Jima. Arriving 2 days later, she took part in the pre-invasion bombardment and, after the assault on Iwo Jima 19 February, performed yeoman fire support, screening, and radar picket duties during the bitter fighting ashore. She returned to Ulithi on 5 March to prepare for the Okinawa invasion.

Henley got underway on 21 March for the last and largest of the Pacific amphibious operations, Okinawa. Her assignment consisted of screening the light carriers as their planes provided vital air support to ground troops. Undergoing periodic air attacks, she continued to screen her carrier group, with occasional logistics stops at Kerama Retto until 24 June. She arrived Leyte Gulf 27 June 1945.

The veteran ship returned to waters north of Okinawa on 1 July to cover minesweeping operations. Henley returned to Buckner Bay on 7 August and was there at war's end on 15 August. She took air-sea rescue station off Japan on 24 August, then departed on 2 September, the day of Japan's formal surrender, for the long voyage to California, arriving in San Francisco on 24 September. She was overhauled, and decommissioned at San Diego on 30 April 1946, then entered the Pacific Reserve Fleet, and was berthed at Bremerton, Wash.

On 1 May 1968, the ship was stricken from the Naval Vessel Register, and in May 1970 she was sold and broken up for scrap.

Honors

John D. Henley received six battle stars for World War II service.

References

  • {{DANFS|http://www.history.navy.mil/research/histories/ship-histories/danfs/j/john-d-henley-dd-553.html}}

External links

  • navsource.org: USS John D. Henley
  • hazegray.org: USS John D. Henley
{{Fletcher class destroyer}}{{DEFAULTSORT:John D. Henley (Dd-553)}}

6 : World War II destroyers of the United States|United States Navy Virginia-related ships|Ships built in Chickasaw, Alabama|1942 ships|Fletcher-class destroyers of the United States Navy|Pacific Reserve Fleet, Bremerton Group

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/21 22:36:31