请输入您要查询的百科知识:

 

词条 USS Seahorse (SSN-669)
释义

  1. Construction and commissioning

  2. Service history

  3. Decommissioning and disposal

  4. References

  5. External links

{{Other ships|USS Seahorse }}{{Infobox ship image
Ship image=Seahorse (SSN-669) on her way to the Mediterranean Sea to serve as part of the {{USS>John F. Kennedy|CV-67}} aircraft carrier battle group.
}}{{Infobox ship career
Hide header=Ship country=United States1995}}Ship name= USS Seahorse Ship namesake=The seahorseShip ordered= 9 March 1965Ship awarded=Ship builder= General Dynamics Electric Boat, Groton, ConnecticutShip original cost=Ship yard number=Ship way number=Ship laid down= 13 August 1966Ship launched= 15 June 1968Ship sponsor=Mrs. Paul IgnatiusShip christened=Ship completed=Ship acquired=Ship commissioned= 19 September 1969Ship decommissioned= 17 August 1995Ship in service=Ship out of service=Ship struck= 17 August 1995Ship reinstated=Ship homeport=Ship motto= Thoroughbred of the FleetShip nickname=Ship honours=Ship fate= Scrapping via Ship and Submarine Recycling Program begun 1 March 1995, completed 30 September 1996Ship status=Ship notes=
}}{{Infobox ship characteristics
Hide header=Header caption=Ship class= Sturgeon-class attack submarine4027|LT|t|0|abbr=on}} light
  • {{convert|4322|LT|t|0|abbr=on}} full
  • {{convert|295|LT|t|0|abbr=on}} dead
292|ft|m|abbr=on}}32|ft|m|abbr=on}}Ship height=29|ft|m|abbr=on}}Ship depth=Ship hold depth=Ship decks=Ship deck clearance=Ship power=15,000 shaft horsepower (11.2 megawatts)Ship propulsion= One S5W nuclear reactor, two steam turbines, one screw15|kn|lk=in}} surfaced
  • {{convert|25|kn}} submerged
Ship range=Ship endurance=Ship test depth=1,300 feet (396 meters)Ship complement=108 (13 officers, 95 enlisted men)Ship time to activate=Ship sensors=Ship EW=21|in|mm|0|sing=on}} torpedo tubesShip armor=Ship notes=
}}

USS Seahorse (SSN-669), a Sturgeon-class attack submarine, was the second submarine and third ship of the United States Navy to be named for the seahorse.

Construction and commissioning

The contract to build Seahorse was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 9 March 1965 and her keel was laid down there on 13 August 1966. She was launched on 15 June 1968, sponsored by Mrs. Paul Ignatius, and commissioned on 19 September 1969 with Commander George T. Harper, Jr., in command.

Service history

Following a shakedown cruise in the Caribbean Sea and visits to Roosevelt Roads and San Juan, Puerto Rico, and Frederiksted on St. Croix in the United States Virgin Islands, Seahorse returned to her home port, Charleston, South Carolina. Through November 1970, she operated in the Atlantic Ocean and Caribbean, engaging in local operations and conducting attack submarine training.

On 30 November 1970, Seahorse got underway from Charleston on her first major deployment, in which she operated in the Atlantic and visited Bremerhaven, West Germany, before returning to Charleston on 14 February 1971. For the next four months, Seahorse conducted attack submarine training, engaged in air group operations, and made final preparations for an extended Mediterranean Sea deployment. Departing Charleston on 21 June 1971, she arrived at Rota, Spain, on 2 July 1971. She continued to operate in the Mediterranean until 4 October 1971, when she headed back to Charleston. She remained in Charleston for the next three and one-half months.

On 24 January 1972, Seahorse ran aground and was stranded for two hours while attempting to put to sea from Charleston. After breaking free, she returned to port for repairs.

On 9 February 1972, Seahorse again departed Charleston for a North Atlantic Ocean deployment, visiting Faslane, Scotland, before returning to Charleston on 11 May 1972. During the months of June, July, and August 1972, she spent four weeks at sea in the Atlantic providing services for air groups and participating in destroyer operations. In September 1972, Seahorse departed for the North Atlantic to participate in the North Atlantic Treaty Organization Exercise "Strong Express," followed by exercises with the United Kingdom and Canada in October 1972 and with the Royal Netherlands Navy in November 1972. She returned to Charleston on 5 November 1972.

{{Expand section|history for 1972-1974|date=January 2010}}

Seahorse continued to operate out of Charleston into at least 1974.

{{Expand section|history for 1974-1995|date=January 2010}}

Decommissioning and disposal

Seahorse was decommissioned on 17 August 1995 and stricken from the Naval Vessel Register the same day. Her scrapping via the Nuclear-Powered Ship and Submarine Recycling Program at Puget Sound Naval Shipyard in Bremerton, Washington, began on 1 March 1995 and was completed on 30 September 1996. One of her sail planes is on public display in memorial garden at the former Sand Point Naval Air Station (now Warren G. Magnuson Park) near Seattle.

References

  • {{DANFS|http://www.history.navy.mil/research/histories/ship-histories/danfs/s/seahorse-ii.html}}
  • {{NVR|{{NVR url|id=SSN669}}}}
  • NavSource Online: Submarine Photo Archive Seahorse (SSN-669)

External links

  • www.ussseahorse.org website for USS Seahorse (SS-304) and USS Seahorse (SSN-669)
{{Sturgeon class submarine}}{{1972 shipwrecks}}{{Use dmy dates|date=January 2011}}{{DEFAULTSORT:Seahorse (Ssn-669)}}

7 : Ships built in Groton, Connecticut|Sturgeon-class submarines|Cold War submarines of the United States|Nuclear submarines of the United States Navy|United States submarine accidents|Maritime incidents in 1972|1968 ships

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/24 1:21:52