词条 | Achwa 2 Hydroelectric Power Station |
释义 |
| name = Achwa 2 Hydroelectric Power Station | name_official = | image = | image_size = | image_caption = | image_alt = | location_map = Uganda | location_map_size = | location_map_caption = Map of Uganda showing the location of Achwa 2 HEP Station. | location_map_alt = | coordinates = {{coord|03|08|06|N|32|31|15|E|region:UG_type:landmark|display=inline,title}} | location_map_relief = | country = Uganda | location = Achwa River, Gulu District | purpose = | status = UC | construction_began = | opening = 2018 (Expected)[1] | demolished = | cost = | owner = | operator = | dam_type = | dam_crosses = Achwa River | dam_height = | dam_height_foundation= | dam_height_thalweg = | dam_length = | dam_elevation_crest = | dam_width_crest = | dam_width_base = | dam_volume = | spillway_count = | spillway_type = | spillway_capacity = | res_name = | res_capacity_total = | res_capacity_active = | res_capacity_inactive= | res_catchment = | res_surface = | res_max_length = | res_max_width = | res_max_depth = | res_elevation = | res_tidal_range = | plant_name = | plant_coordinates = | plant_operator = | plant_commission = | plant_decommission = | plant_type = | plant_hydraulic_head = | plant_turbines = 4 x 10.5MW | plant_capacity = {{convert|42|MW|abbr=on}} | plant_annual_gen = | website = | extra = }}Achwa 2 Hydroelectric Power Station is a {{convert|42|MW}} hydroelectric power plant, under construction in Uganda.[2] LocationThe power station is located across the Achwa River, in Gulu District, Northern Uganda. This location is at the border between Gulu District and Pader District, approximately {{convert|38|km|0}} north of the settlement of Aswa.[3] This is approximately {{convert|65|km|0}}, by road, northeast of Gulu, the largest city in Northern Uganda.[4] The geographical coordinates of the construction site are:03°08'06.0"N, 32°31'15.0"E (Latitude:3.135000; Longitude:32.520833).[5] OverviewThis power station is one in a cascade of five power stations planned on the Achwa River totaling {{convert|109|MW}}, with Achwa 2 being the first to be built.[3][6] Achwa 2 is a run-of-the-river hydroelectricity project with planned annual output of 281 GWh.[3] The power generated will be evacuated via a 132kV high voltage transmission line to a substation in Lira, a distance of approximately {{convert|140|km|0}}, where it will be sold to the Uganda Electricity Transmission Company Limited (“UETCL”).[6] Other infrastructure that will be constructed include {{convert|9|km|0}} of service roads, a {{convert|38|km|0}} service road to connect the site to the Gulu-Kitgum Road and a camp for the construction workers.[3][6] Ownership and fundingThe power station is owned and being developed by ARPE Limited.[7] The cost of construction is budgeted at US$78,808,400, of which the African Development Bank lent US$14,330,754 and the remaining US$64,477,646 was borrowed from Delta.[6] PAC SpA, an Italian construction company, is the EPC contractor for civil works and Voith, a German manufacturer has been contracted to supply the four turbines and associated electro-mechanical parts. The contract includes design, manufacturing, supply, transportation, erection, testing and commissioning of all supplied equipment.[8] See also
References1. ^{{cite web| url=https://www.berkeley-energy.com/project/achwa-2/ | title=Achwa 2 – Hydro – Uganda |publisher=Berkeley Energy |date=16 October 2018 |access-date=16 October 2018 | author=Berkeley Energy |location=London}} 2. ^{{cite web|url=http://www.hydroworld.com/articles/2016/07/voith-supplying-electromechanical-equipment-for-42-mw-achwa-river-hydro-plant-in-uganda.html |title=Voith supplying electromechanical equipment for 42-MW Achwa River hydro plant in Uganda |accessdate=7 September 2017 |date=7 July 2016 | publisher=Hydroworld.com |location=Heidenheim, Germany |first=Elizabeth | last=Ingram}} 3. ^1 2 3 {{cite web|url=https://www.afdb.org/fileadmin/uploads/afdb/Documents/Environmental-and-Social-Assessments/Uganda_-_ACHWA_II_Hydro_Electric_power_Project_%E2%80%93_Summary_ESIA.pdf |title=African Development Bank: Project: Achwa II Hydro Electric Power Project: Country: Uganda: Summary of Environmental and Social Assessment (ESIA) |format=PDF | publisher=African Development Bank (AfDB) |author=Kinoshita, N. et.al |location=Abidjan | accessdate=7 September 2017 |date=14 December 2016}} 4. ^{{cite web|url=https://distancecalculator.globefeed.com/Uganda_Distance_Result.asp?fromplace=Gulu%2C%20Northern%20Region%2C%20Uganda&toplace=Atanga%20I%2C%20Northern%20Region%2C%20Uganda%2C&dt1=ChIJJyrED1ymcRcRBg7Yw9Hzbs4&dt2=ChIJtY6NvCBdcRcR0NedrVvBq7U |title=Distance between Gulu, Northern Region, Uganda and Atanga I, Northern Region, Uganda |publisher=Globefeed.com (GFC) |author=GFC |accessdate=7 September 2017 | date=7 September 2017}} 5. ^{{google maps|url=https://www.google.com/maps/place/3%C2%B008'06.0%22N+32%C2%B031'15.0%22E/@2.9772977,32.4675736,71019m/data=!3m1!1e3!4m5!3m4!1s0x0:0x0!8m2!3d3.135!4d32.5208333| title=Location of Achwa 2 Hydroelectric Power Station |accessdate=7 September 2017}} 6. ^1 2 3 {{cite web| url=https://www.afdb.org/en/projects-and-operations/project-portfolio/p-ug-fab-007/ | title=African Development Bank: Achwa II Hydropower Plant |accessdate=7 September 2017 | date=14 December 2016 |publisher=African Development Bank (AfDB) | author=AfDB}} 7. ^{{cite web| url=http://www.era.or.ug/index.php/2013-10-23-18-03-21/2013-10-23-18-12-48/latest-news/359-era-issues-license-to-arpe-limited | title=ERA Issues License to ARPE Limited |accessdate=7 September 2017 | date=15 August 2014 | publisher=Electricity Regulatory Authority (ERA) | author=ERA}} 8. ^{{cite|url=http://www.voith.com/en/press/press-releases-99_70545.html |title=Renewable Energy in Africa – Powering Uganda through Hydropower | accessdate=7 September 2017 |date=7 June 2016 |publisher=Voith.com | author=Voith |location=Heidenheim, Germany}} External links
2 : Gulu District|Hydroelectric power stations in Uganda |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。