词条 | Barrie line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
释义 |
| box_width = auto | name = Barrie | color = | logo = {{rint|gotransit|rail|size=60}} {{rint|gotransit|rail|E|x|size=30}} | logo_width = | logo_alt = | image = Car 2029 at Barrie South Platform.jpg | image_width = 300px | image_alt = | caption = The Barrie South platform with BiLevel coach 2029 | type = Commuter rail | system = GO Train | status = | locale = Toronto; Vaughan; King City; Aurora; Newmarket; East Gwillimbury; Bradford; Barrie | start = | end = | stations = 12 | routes = | daily_ridership = 17,000 (2014)[1] | open = September 7, 1982 | close = | owner = Metrolinx | operator = GO Transit | character = | depot = | stock = | linelength_km = 101.4 | tracklength = | tracks = | gauge = {{RailGauge|sg|allk=on}} | old_gauge = | minradius = | racksystem = | routenumber = | electrification = | speed = {{convert|80|mph|kph}} {{sfn|Metrolinx|2010|p=57}} | elevation = | website = | map = {{GO Transit Barrie}} | map_state = }} Barrie is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto in a generally northward direction to Barrie, and includes ten stations along its {{convert|101.4|km|mi|1}} route.{{sfn|Metrolinx|2010|p=57}} From 1982 to 1990 and again from 1993 to 2007, it was known as the Bradford line, named after its former terminus at Bradford Station until the opening of Barrie South Station. The Barrie Line runs on the former Northern Railway of Canada route. This is the oldest operating railway line in Ontario, with passenger service beginning in 1853.{{sfn|Town of Aurora}} HistoryIn 1852, construction began on the Ontario, Simcoe and Huron Railway, which would run from Toronto to Collingwood.{{sfn|Milland|2009}} The line opened on May 16, 1853, when passenger train service began operating between Toronto and Aurora (then Machell's Corners).{{sfn|Town of Aurora}} On October 11, 1853, service was extended to Allandale, then opposite Barrie on the south shore of Kempenfelt Bay.{{sfn|Smith}} In 1888, the Grand Trunk Railway took over operation of the line.{{sfn|Town of Aurora}} In 1923, the Canadian National Railway (CNR) inherited the bankrupt Grand Trunk Railway. Commuter service planningIn 1968, MPP William Hodgson introduced a private member's bill to move that the government of Ontario establish GO Transit services north of Metro Toronto.{{sfn|The Era|1968|p=1}} That year, a community group known as the GO North Committee distributed "GO North" stickers for motorists to adhere to their automobile's windshield to advocate for GO Transit commuter rail service north of Toronto.{{sfn|Lade|1968|p=1}} Planning for commuter services resulted in the establishment of the Newmarket Bus Terminal by 1970, from which commuters would be taken to the Richmond Hill GO Station to commute to Toronto.{{sfn|The Era|1969|p=1}} John Crawford Medcof, operating a company named Railroad Boosters, rented a train for one-day service between Barrie and Toronto on 16 October 1969,{{sfn|Brotherhood of Maintenance of Way Employees|1973}}{{sfn|The Era|June 1970|p=29}} earning a profit.{{sfn|Ottawa Citizen|1971|p=21}} He gave the proceeds to the government of Ontario to support a north GO train service promised by John Robarts in late 1969, but asked for the government to return the money when the provincial government announced it would not establish a Richmond Hill line service in 1970.{{sfn|The Era|1970|p=2}}{{sfn|The Era|June 1970|p=29}} He applied for a grant of {{currency|97200|CAD}} from the federal government to operate a commuter train for twelve weeks, with one train leaving Barrie in the morning for Toronto, and a return trip at night.{{sfn|Ottawa Citizen|1971|p=21}} The grant was approved per the government's local initiatives program in December 1971.{{sfn|Ottawa Citizen|1971|p=21}} The train was operated by Canadian National Railways, and charged the same fares as those for the GO Transit bus service.{{sfn|Ottawa Citizen|1971|p=21}} Another trial commuter service from Barrie to Toronto was operated in late 1972, carrying 13,483 passengers.{{sfn|The Era|1973|p=2a}} In 1973, the Canadian Transport Commission held a public hearing at Georgian College{{sfn|The Era|1973|p=2a}} during which its three-member committee heard presentations from Medcof and councillors from all "municipalities between Toronto and Barrie".{{sfn|The Era|1973|p=5}} All presentations favoured the creation of commuter train service between the two cities, including that of York—Simcoe MP Sinclair Stevens.{{sfn|The Era|1973|p=5}} On April 1, 1972, CN introduced commuter service from Barrie to Toronto, as required by the Canadian Transport Commission. The service was transferred to Via Rail in 1978.{{sfn|Garcia|Bow}} As a result of federal government financial cutbacks to Via Rail, the service was transferred to the provincial government and integrated into the GO Transit network on September 7, 1982, but service only extended to Bradford.{{sfn|Garcia|Bow}} On September 17, 1990, the line was extended to Barrie, but was again cut back to Bradford on July 5, 1993. Service expansionOn September 8, 1998, GO Transit added a second daily round trip to the line. In the early 2000s, GO Transit opened four new stations on the line: Rutherford on January 7, 2001;{{sfn|Garcia|Bow}} York University on September 6, 2002;{{sfn|Ministry of Transportation|2002}} and East Gwillimbury on November 1, 2004.{{sfn|Canada Newswire|2004}} In 2006, the number of daily trains on the line doubled again to four in each direction.{{sfn|GO Transit|2005}} In 2006, GO Transit built a bridge at the Snider diamond,{{sfn|GO Transit|2006}} which is the junction between the Barrie Line and Canadian National's primary east-west freight line, the York Subdivision. Since CN controlled both corridors, the passage of passenger trains over the diamond was often delayed by freight trains passing through the intersection. Constructing the bridge and associated trackage resulted in a grade separation of the two lines, eliminating such delays. Construction of the bridge began in February 2006, and the bridge was opened in December 2006. The entire project was completed in June 2007.{{sfn|GO Transit|2007}} On December 17, 2007, the Bradford Line was extended to the new Barrie South GO Station and was renamed the "Barrie Line".{{sfn|GO Transit: New stations}} Construction had begun on February 2, 2007 to construct the new Barrie South station, a new layover facility and new tracks, signals and crossings along the existing {{convert|20|km|mi|0}} railway corridor. The project cost $25 million, funded by two thirds by the federal and provincial governments, and one third by the City of Barrie.{{sfn|City of Barrie|2007}} On December 15, 2009, Metrolinx purchased the portion of the Newmarket Subdivision within the City of Toronto from CN for $68 million. The Barrie line trackage, from Union Station to Barrie, is now fully owned by Metrolinx. As part of the agreement, the Canadian National Railway continues to serve five freight customers located on the Newmarket subdivision between Highway 401 and the CN York Subdivision. On January 30, 2012, the Barrie line was extended north to the newly constructed Allandale Waterfront GO Station.{{sfn|Mackenzie|2012}} In the summer of 2012, a pilot train service was introduced on weekends and holidays between June and September.{{sfn|GO Transit: Seasonal service|2012}} Two trains in each direction completed the entire route, while an additional four trains ran between Union Station and East Gwillimbury GO station.{{sfn|GO Transit|2012}} The summer service cost {{currency|520,000|CAD}} to operate, including train crews, safety and enforcement, station staffing and fuel.{{sfn|Burton|2013}} Bidirectional weekend service was offered again in summer 2013, with four trains in each direction covering the entire route from Toronto to Barrie, making all stops and having a bus connection at Rutherford GO Station for non-stop service to Canada's Wonderland.{{sfn|Burton|2013}}{{sfn|GO Transit: Barrie Seasonal Service|2013}} It cost {{currency|400,000|CAD}} to operate.{{sfn|Burton|2013}} For the summers of 2014, 2015 and 2016, the same train service was provided, but without non-stop buses to Canada's Wonderland, requiring those passengers to transfer instead to York Region Transit local bus service at Maple station.{{sfn|GO Transit|2014}} On December 31, 2016, year-round weekend train service was introduced with service every 75 minutes in both directions between Toronto and Aurora, including three daily trains per direction covering the full route between Toronto and Barrie.{{sfn|Government of Ontario|2016}} On December 30, 2017, {{ttcs|Downsview Park}} GO Station opened, and service to York University station was correspondingly reduced to peak hours only.{{sfn|Toronto Transit Commission|2010}}{{sfn|Metrolinx|2010}} At the same time, the Barrie line's weekend train service was improved to every 60 minutes between Union and Aurora, and new hourly weekday off-peak service was introduced between Union and Aurora, as well as additional peak period trains between Union Station to Bradford GO Station.{{sfn|CTV News|2017}} StationsThere are 11 stations on the Barrie line, excluding the terminus at Union Station in Toronto. In addition to Union Station, four station buildings along the Barrie Line are federally protected by the Heritage Railway Stations Protection Act. At Allandale Waterfront and Newmarket stations, historic station buildings remain but are used for other purposes, while at Aurora and Maple stations, the historic stations buildings continue to be in use.{{sfn|Parks Canada}}
Service{{As of|2018|1}}, the Barrie line has weekday service consisting of seven trains southbound from Barrie and one train southbound from Bradford in the morning, and seven trains northbound to Barrie and one train northbound to Bradford from Union Station in the afternoon.[3] The line also has hourly, two-way service between Union and Aurora during off peak times.Weekend service consists of hourly trains in both directions. Three trips in each direction cover the full route from Toronto to Barrie, while the remainder operate between Toronto and Aurora. Trips terminating in Aurora have connecting GO bus service to Barrie.[3] During the times and directions that train service does not operate, service is provided by GO bus routes 63 (Toronto–King City), 65 (Toronto–Newmarket) and 68 (Newmarket–Barrie).[3] The maximum speed on the line is {{convert|128|kph|mph}}, between Bradford and Barrie South.{{sfn|Metrolinx|2010|p=57}} Trains are limited to {{convert|24|kph|mph}} in some parts, but can travel at least {{convert|80|kph|mph}} over most of the line.{{sfn|Metrolinx|2010|p=57}} ConnectionsThe Barrie line makes connections with:
Future{{Update section|date=March 2019}}Capacity expansionIn April 2015, the government of Ontario announced that as part of a broad GO Transit expansion project called Regional Express Rail, service on the Barrie line would increase from 7 daily train trips to over 20 daily train trips by 2020.{{sfn|Kalinowski|2015}}{{efn|As of April 2015, there are seven daily southbound weekday morning trains on the Barrie line, and seven daily northbound weekday evening trains.}} The railway electrification system is expected to be completed by 2024 and will feature two-way, all-day service every 15 minutes between Union Station and Aurora GO.{{sfn|Kalinowski|2015}} Grade separationA number of grade separation projects are planned for the line. The Davenport Diamond will separate the east-west CP rail subdivision tracks from the north-south Barrie line tracks. Road and rail grade separation will be undertaken at Rutherford Road immediately north of Rutherford GO Station, and at McNaughton Road north of Maple GO Station. Davenport DiamondThe Davenport Diamond is an at-grade rail-to-rail crossing of the GO Barrie line and east-west CP Rail North Toronto subdivision tracks near Davenport Road in Toronto. In order to increase service frequency on the Barrie Line, GO Transit has identified the need to remove the diamond and build a grade separated crossing. In 2015 Metrolinx initiated a Transit Project Assessment Process (an environmental assessment process specific to transit projects) based on the preferred option of construction an overpass to carry the GO line over the east-west CP Rail line. This process anticipates a start of construction in 2017.{{sfn|Metrolinx - Project Overview|May 2015}}{{sfn|Metrolinx - Display Boards|May 2015}} The grade separated crossing will be on a {{convert|1.5|km|1|adj=on}} long, {{convert|8.5|m|adj=on}} high rail bridge. It will lie between Bloor Street West and Saint Clair Avenue West parallel to Lansdowne Avenue. The bridge will allow GO Transit to run all-day, two-way service on the Barrie line without freight traffic disruptions. The project will cost $120 million.[4][5] Additional stationsIn the September 2015 planning document "New Station Analysis", an initial list of 22 potential GO station sites were identified. These were, from north to south, at Innisfil, Holland Yard, Mulock Drive, St John's Sideroad, Yonge Street, Bathurst Street at Side Road 15, Dufferin Street, Kirby Road, Keele Street at Teston Road, Langstaff Road, Highway 7, Steeles Avenue, Finch Avenue, Downsview Park, Wilson Avenue, Lawrence Avenue, Caledonia Road, Rogers Road, St Clair Avenue West, Davenport Road, Dupont Street, and Bloor Street.{{sfn|Woo|2015|p=19}} Of these, most were rejected as unsuitable, either because they were too close to other stations,{{sfn|Woo|2015|p=17}} or for failing to meet other criteria, such as connections to other services, proximity to urban growth centres,{{sfn|Woo|2015|p=22}} construction viability, urban density, or necessary infrastructure.{{sfn|Metrolinx|2016|p=11–12}} Others were rejected because they were considered for other lines on the network.{{sfn|Woo|2015|p=12}} The final list of recommended candidate locations were the sites at Innisfil, Mulock Drive, Kirby Road, and a location between Davenport Road and Bloor Street, and Spadina Road.{{sfn|Metrolinx|2016|p=18}} Four sites were considered for either the Barrie line or the Kitchener line.{{sfn|Metrolinx|2016|p=13}} The sites at Highway 7 in Vaughan and at St Clair Avenue West were not included as part of the 10-year RER expansion, but are part of a future expansion program.{{sfn|Metrolinx|2016|p=21-23}} The candidate location Bathurst Street at Side Road 15 was deferred for future consideration.{{sfn|Metrolinx|2016|p=26}} Stations have been approved in Vaughan for the Kirby Road site (serving the community of Hope), at Mulock Drive in Newmarket, and in Innisfil.{{sfn|Metrolinx|2016}} Under the Regional Express Rail initiative, new stations are planned in Toronto at Bloor Street West (near Lansdowne Avenue and {{ttcs|Lansdowne}} subway station) and at Spadina Avenue near Front Street (with access to the CityPlace neighbourhood and 510 Spadina streetcars).{{sfn|Spurr|2016}} Caledonia StationThe design for Caledonia station on Line 5 Eglinton includes provisions for a connection to the Barrie Line, including a pedestrian bridge above the Barrie line and provisions for elevator access to future GO platforms.{{sfn|Metrolinx|2013}} Metrolinx announced that an environmental assessment for the station would begin in the summer of 2015.{{sfn|Metrolinx|2015}} Innisfil GO StationMetrolinx is considering a station in Innisfil for a future expansion, to be located at approximately mile marker {{convert|52.00|mi|km|2}}.{{sfn|Metrolinx|2010|p=167}} They are analyzing two sites, both of which are in southeast Innisfil just east of Sideroad 20. One is at 5th Line near Lefroy's Lormel subdivision and the other at 6th Line near the future Sleeping Lion development in south Alcona. The two locations are about 1.5 kilometres apart from one another.{{sfn|Vanderlinde|2016}} Innisfil town council has stated its preference for the 6th Line location, and has approved use of $2 million to acquire land and $2.6 million to partially fund the station's construction.{{sfn|CTV News|2016}} The location of a rail station has been controversial among residents and competing developers in the area. Metrolinx consults municipalities and the public, but selects site locations based on ridership, other transit connections and the cost to construct at a location. Innisfil is shortlisted with 50 other sites in the GTA, including 10 other possible locations on the Barrie line. Metrolinx has rated Innisfil as high for affordability of construction, but low for ridership.{{sfn|Vanderlinde|2016}} Concord StationTo provide an interchange with Viva, a bus rapid transit service in York Region, a new station was proposed at Highway 7. The site was called Concord Station, after the Concord neighborhood in which it would be located.{{sfn|City of Vaughan|2013|p=15}} The city of Vaughan has integrated the station into its design plans for a mixed use development near the intersection of Highway 407 and the rail corridor. Both the municipal government of Vaughan and the regional government of York have identified this location as a potential site for the station, which requires GO Transit to perform an environmental assessment.{{sfn|City of Vaughan|2013|p=16}} In January 2013, Vaughan municipal clerk sent a Vaughan City Council resolution to York Regional Council requesting Metrolinx consideration for four priority projects, among them all-day two-way service on the Barrie line, creation of the Concord GO Station, and creation of a Kirby Road GO Station.{{sfn|Kelly|2014|p=2}} RidershipIn 2012, the Barrie line served about 7,500 passengers a day,{{sfn|McInroy|2012}} or approximately 2 million per year. By 2008, the annual number of riders on the Barrie line was almost 3.1 million, an increase of 18% from 2007 and 167% from 2001.{{sfn|Metrolinx|2010|p=41}} About 2,300 of the 3,000 daily peak passengers to Union Station boarded at Aurora (about 1,000), Rutherford (about 800), and Newmarket (about 500) that year.{{sfn|Metrolinx|2010|p=44}} The weekend summer service had 105 daily riders in 2012 (32,000 total for six trains per day), and 220 daily riders in 2013 (41,000 total for four trains per day).{{sfn|Bruton|2013}} From 2010 to 2014, ridership on the line increased 70% based on cordon count data.{{sfn|Metrolinx|2017|p=9}} For 2015, there was a weekday morning peak of 5,852 boardings and 227 alightings at the stations on the line, all other passengers alighting at Union Station in Toronto.{{sfn|Metrolinx|2017|p=9}}
Notes{{notelist}}1. ^{{cite web |url=http://www.metrolinx.com/en/docs/pdf/board_agenda/20140905/20140905_BoardMtg_Regional_Express_Rail_EN.pdf |title=Regional Express Rail |date=5 September 2014 |publisher=Metrolinx |accessdate=2 September 2014}} -->2. ^{{cite web|title=More Barrie GO Trains|url=http://www.gotransit.com/public/en/news/barrie/servicechanges.aspx|website=GO Transit|accessdate=December 13, 2017|archive-url=https://web.archive.org/web/20171213144217/http://www.gotransit.com/public/en/news/barrie/servicechanges.aspx|archive-date=2017-12-13|dead-url=yes|df=}} 3. ^1 2 {{cite web |url=http://www.gotransit.com/timetables/en/PDF/Timetables/09171217/Table65.pdf |title=Barrie Line 2017 |author= |date=2 September 2017 |website= |publisher=GO Transit |access-date=6 September 2017 |df= |archive-url=https://web.archive.org/web/20170921104406/http://www.gotransit.com/timetables/en/PDF/Timetables/09171217/Table65.pdf |archive-date=2017-09-21 |dead-url=yes }} 4. ^{{cite news |url=https://www.thestar.com/news/gta/transportation/2015/08/07/go-gives-city-more-time-to-consider-giant-rail-bridge.html |title=GO gives city more time to consider giant rail bridge |newspaper=Toronto Star |author=Tess Kalinowski, Transportation reporter |date={{date|2015-08-07}} |accessdate=2016-03-31}} 5. ^{{cite news |url=https://www.thestar.com/news/gta/transportation/2015/11/17/metrolinx-to-move-ahead-with-giant-davenport-rail-bridge.html |title=Metrolinx to move ahead with giant Davenport rail bridge |newspaper=Toronto Star |author=Tess Kalinowski, Transportation reporter |date={{date|2015-11-17}} |accessdate=2016-03-31}} }} References{{refbegin}}
|last1=Garcia|first1=Daniel|last2=Bow|first2=James|publisher=Transit Toronto|accessdate=9 June 2006|ref=harv}}
|title=Railways Appeared in Toronto in 1852|last=Milland|first=Russell|publisher=Toronto Railway Historical Association|date=21 June 2009|accessdate=5 February 2011|ref=harv}}
|url=http://gotransit.com/public/en/updates/seasonal2013/Barrie_Seasonal_Schedule.pdf |title=Barrie Seasonal Service |publisher=GO Transit |accessdate=6 June 2013 |ref={{sfnref|GO Transit: Barrie Seasonal Service|2013}} |deadurl=yes |archiveurl=https://web.archive.org/web/20130717112110/http://www.gotransit.com/public/en/updates/seasonal2013/Barrie_Seasonal_Schedule.pdf |archivedate=17 July 2013 |df=
External links{{commons category}}
9 : GO Transit|Passenger rail transport in Toronto|Transport in Vaughan|Transport in York Region|Transport in Aurora, Ontario|Transport in Simcoe County|Transport in Barrie|Railway lines opened in 1982|1982 establishments in Ontario |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。