请输入您要查询的百科知识:

 

词条 Azad Pattan Hydropower Project
释义

  1. See also

  2. References

  3. External links

{{Infobox dam
| name = Azad Pattan Hydropower Project
| name_official =
| image = Azad Pattan HPP.png
| image_size =
| image_caption = Project Layout
| location_map = Pakistan
| location_map_size =
| location_map_caption =
| coordinates = {{coord|33|46|3.9|N|73|34|17.45|E|type:landmark|display=inline,title}}
| country = Pakistan
| location = Sudhanoti District, Azad Kashmir
| status = P
| construction_begins = 2021
| opening = 2025
| cost = $1.517 billion
| owner = Laraib Group
| dam_type = Gravity dam, Run of the river
| dam_height = {{convert|90|m|ft|0|abbr=on}}
| dam_height_thalweg =
| dam_height_foundation =
| dam_length = {{convert|80|m|ft|0|abbr=on}}
| dam_width_crest =
| dam_width_base =
| dam_volume =
| dam_elevation_crest =
| dam_crosses = Jhelum River
| spillway_count =
| spillway_type =
| spillway_capacity =
| plant_type =
| plant_turbines = 4 x 160 MW
| plant_capacity = 700  MW (10% continuous overload)[1]
| plant_annual_gen = 3064 GWh
| website =
| extra =
}}

The Azad Pattan Hydropower Project is a 700 MW hydroelectric power station on the Jhelum River roughly 7 km upstream of Azad Pattan Bridge in the Sudhanoti District of Azad Kashmir and 90 km from Islamabad, the capital city of Pakistan.[2][3]The project is scheduled for completion by 2025.

Upon finalizing the EPC and other associated costs, the project company submitted its EPC tariff proposal on 23 June 2017. Following an intensive evaluation process, NEPRA determined the tariff vide Determination dated 17 May 2018. Tariff of US ¢ 7.12/kWh (levelized) was determined for the 30-year term; with an average of US ¢ 5.93/kWh. The average and levelized tariff for the first 10 years is US ¢ 8.13/kWh while the average tariff for the next 20 years is US ¢ 4.83/kWh (levelized US ¢ 5.20/kWh). This has the distinction of being the lowest tariff of all the large private hydropower projects (over 500MW) on rivers in Pakistan.[4]

The JCC(Joint Cooperation Committee) for CPEC related projects conducted a study on power market of Pakistan, which led to the decision that both sides will discuss the inclusion of the project at the fifth Expert Panel meeting.[5]

See also

  • List of power stations in Pakistan
  • New Bong Escape Hydropower Project
  • Patrind Hydropower Project
  • Gulpur Hydropower Project
  • Mangla Dam

References

1. ^{{cite news|title=Pakistan announces $1.5b hydropower project in AJK|url=https://tribune.com.pk/story/1596352/2-pakistan-announces-1-5b-hydropower-project-ajk/|accessdate=1 January 2018|publisher=tribune.com.pk}}
2. ^{{Cite web|title = Azad Pattan HPP {{!}} Business Recorder|url = http://www.brecorder.com/supplements/:hydropower-vision-2015-2025/1164913:azad-pattan-hpp/|website = Business Recorder|access-date = 2016-02-14|first = Business|last = Recorder}}
3. ^{{Cite web|title = CDM: Azad Pattan Hydropower Project|url = https://cdm.unfccc.int/Projects/Validation/DB/DZFS0QLBPVPUHF7J6RTTHVA1NYBYJD/view.html|website = cdm.unfccc.int|access-date = 2016-02-15|first = United Nations Framework Convention on Climate|last = Change}}
4. ^{{Cite web|url=https://www.laraibgroup.com/|title=Welcome to Laraib Group|website=www.laraibgroup.com|access-date=2019-03-13}}
5. ^{{Cite web|url=https://tribune.com.pk/story/1887094/2-determining-energy-potential-pakistan-proposes-study-jhelum-river-cascade/|title=Pakistan proposes study of Jhelum river cascade|date=2019-01-13|website=The Express Tribune|language=en-US|access-date=2019-03-13}}

External links

{{External links|date=February 2016}}
  • http://azadpattanhpp.com/
  • http://www.laraibgroup.com/
  • https://cdm.unfccc.int/Projects/Validation/DB/DZFS0QLBPVPUHF7J6RTTHVA1NYBYJD/view.html
  • http://www.ppib.gov.pk/N_hydel_with_los.htm

4 : Dams in Pakistan|Run-of-the-river power stations|Dams on the Jhelum River|Gravity dams

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/30 22:29:35