请输入您要查询的百科知识:

 

词条 Azerishiq
释义

  1. History

  2. Cooperation

  3. See also

  4. References

  5. External links

{{Orphan|date=March 2019}}{{short description|Azerbaijani energy company}}{{Infobox government agency
| name = Azerishiq
| native_name = Azərişıq
| seal =
| logo = Azerishiq.png
| formed = February 10, 2015
| jurisdiction =
| employees =
| budget =
| chief1_name =
| chief1_position =
| chief2_name =
| chief2_position =
| chief3_name =
| chief3_position =
| chief4_name =
| chief4_position =
| chief5_name =
| chief5_position =
| chief6_name =
| chief6_position =
| chief7_name =
| chief7_position =
| chief8_name =
| chief8_position =
| chief9_name =
| chief9_position =
| parent_department =
| website = http://www.azerishiq.az

}}Azerishiq is the Baku electrical grid operator.

History

The first power plant in Baku was installed in 1895 in the "Bakinski dock" on Bayil highway. In 1903, the number of power stations reached 70.[1] The Baku electricity grid began operating in 1920.[1] Until 1929 it was a member of Azneft's "Electrotok" department. In 1929, the Central Executive Committee of the USSR passed the decision to the Baku City Council. In 1963, by the Decree of the Council of Ministers of the Republic of Azerbaijan, it was transferred to the Ministry of Azerenerji. From 1969 to 2000, it was a member of the Executive Committee of Baku City Executive Committee. The construction of large semi-substations, transmission lines, and production facilities accelerated in the 1970s.[1]

By the order of the president from 2000 to 2002, it was transferred to the Ministry of Economic Development as "Bakielektrikshebeke" OJSC. On October 20, 2000 the first turn of Baku-Heating Center No. 1 was put into operation.[1] From 2002 to 2006, it was managed by Turkish Barmek Holding A.Ş.

After restoration of Bakielektrikshebeke's activity in 2006, funds were allocated from the Presidential Reserve Fund for power development and investment.[1]

By the decree signed by President on February 10, 2015, the name of Bakielectricshebeke OJSC changed into Azerishiq OJSC. Balababa Rzayev was appointed president of Azerishiq. Functions of Azerenerji OJSC including its property and electric energy supply equipment was transferred to Azerishiq from the Cabinet of Ministers.[2][3]

In 2015, Azerishiq prepared the power distribution modernization project with the financial help of the World Bank. The aim of the project is to develop and modernize the distribution network, improve power supply reliability and enhance efficient energy.[4]

Cooperation

Azerishiq OJSC signed a loan agreement with Asian Development Bank (ADB) on 22 July 2016, in the framework of “Power Distribution Enhancement Investment Program – Tranche 1”.[5] In 2016, ADB approved a 750-million-dollar loan facility for the development of power distribution in Azerbaijan.[6][7]

See also

  • Azerenerji

References

1. ^{{Cite web|url=http://www.azerishiq.az/index.php?lang=en&menu=about&id=10|title=AZƏRİŞIQ ASC|website=www.azerishiq.az|access-date=2018-11-13}}
2. ^{{Cite news|url=http://caspianenergy.net/en/energy/18911-bakielektrikshebeke-ojsc-renamed-into-azerishiq-ojsc|title=Caspian Energy - Bakielektrikshebeke OJSC renamed into Azerishiq OJSC|work=Caspian Energy|access-date=2018-11-13|language=ru-RU}}
3. ^{{Cite web|url=http://caspianbarrel.org/az/2015/02/bakus-electric-energy-distribution-network-to-control-entire-country/|title=Baku’s electric energy distribution network to control entire country – Caspian Barrel|website=caspianbarrel.org|language=az|access-date=2018-11-13}}
4. ^Azerbaijan: Power Distribution Modernization Project (2015)
5. ^{{Cite news|url=https://www.adb.org/projects/documents/loan-3407-aze-power-distribution-enhance-prog-t1-mlo1|title=Loan Agreement for Loan 3407-AZE: Power Distribution Enhancement Investment Program - Tranche 1|last=|first=|date=2016-07-22|work=Asian Development Bank|access-date=2018-11-13|language=en}}
6. ^{{Cite news|url=https://www.adb.org/news/adb-approves-750-million-loan-facility-lift-power-reliability-azerbaijan|title=ADB Approves $750 Million Loan Facility To Lift Power Reliability In Azerbaijan|last=Bank|first=Asian Development|date=2016-07-12|work=Asian Development Bank|access-date=2018-11-13|language=en}}
7. ^[https://www.adb.org/sites/default/files/project-document/184900/42401-014-fam.pdf Proposed Multitranche Financing Facility Azerishiq Open Joint-Stock Company Power Distribution Enhancement Investment Program (Guaranteed by the Republic of Azerbaijan]) (2016)

External links

  • Ministry of Energy of the Republic of Azerbaijan
{{improve categories|date=January 2019}}

2 : Electric power companies|Power companies of Azerbaijan

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/20 18:28:25