词条 | Blue Line (Calgary) |
释义 |
| box_width = auto | name = Blue Line | image =Calgary LRV 2207 leading train into Saddletowne station (2013).jpg | imagesize =300px | caption = Siemens SD-160 at Saddletown Station | owner = Calgary Transit | locale = Calgary, Alberta, Canada | transit_type = Light rail (details) | stations = 25 | ridership = | annual_ridership = | website =http://www.calgarytransit.com/ | began_operation = 1985[1] | operator = Calgary Transit | vehicles = | headway = | train_length = 4 cars | system_length = | track_gauge = {{Track gauge|sg}} (standard gauge) | el = Overhead lines, 600 V DC[1] | map = {{Blue Line (Calgary)}} | map_state = collapsed }} The Blue Line, also known as Route 202 is a light rail transit (LRT) line in Calgary, Alberta, Canada. Partnered with the Red Line, and future Green Line it makes up Calgary's CTrain network. Following its initial approval in 1976, the Red Line opened in 1981, with the first trains running on what is now the Blue Line in 1985. HistoryOriginThe concept of a light rail transit system (LRT) was approved in 1976 by the City of Calgary, with the first {{convert|12.9|km|mi|adj=on}} section running from Anderson Road in the southwest, northbound and into downtown, opening in 1981. Originally planned for 40,000 passengers per day, this initial section quickly achieved its designed ridership, and is now part of the Red Line. Based on the success of the Anderson-downtown section, the city approved a second route which would head northwest towards the University of Calgary and the Southern Alberta Institute of Technology. Opposition to the routing through the neighborhood of Sunnyside resulted in a switch of priority to the northeast, in what would become the Blue Line. The median of some main roads had already been allocated to serve as the right of way for what would become the CTrain's Blue Line, and the first {{convert|9.8|km|mi|adj=on}} section opened in 1985, before the originally proposed northwestern expansion. Both lines share a right-of-way through the downtown core. [2] Northeast expansionThe Blue Line's first expansion was to McKnight–Westwinds station in 2007.[3] with Martindale station and Saddletowne (the current terminus) opening in 2012.[4] Western expansionIn February 2008 the Western expansion of the CTrain began, extending the line from downtown towards 69 Street SW, and adding an additional six stations. The Western expansion opened at the end of 2012, ahead of the planned 2013 opening.[5] Capacity upgradeUp until the completion of the Red Line's Fish Creek-Lacombe station, all platforms for the CTrain were originally designed to service three-car trains, although there had been enough space allotted to allow four car trains. Beginning in 2007 construction on station platforms began to expand the entire network to allow four-car trains, with the project being completed in 2017 for CA$300 million.[6] In 2017 Calgary Tranist began running four-car trains on the Blue Line. The increase from three-car trains realized an additional capacity of 200 passengers per trip.[7] Stations and route{{main|List of CTrain stations}}Starting at the 69 Street Southwest station, the Blue line runs along 17 Avenue SW, crossing Sarcee Trail, passes briefly underground towards Westbrook Mall, and then follows along Bow Trail.[5] The line then continues to Downtown Calgary where it shares a right of way with the Red Line along 7 Avenue S. The two lines diverge after City Hall station, where it turns north to cross the Bow River, and runs along the median of Memorial Drive, crossing Deerfoot Trail (Highway 2), to 36 Street NE, where it turns northbound, continuing within the median of 36 Street NE, crossing 16 Avenue NE (Highway 1 / Trans-Canada Highway), and McKnight Boulevard. After McKnight Boulevard, 36 Street NE turns to Métis Trail, and the Blue Line passes under a bridge in the northbound lane running parallel to the road until Martindale station, at which point it turns northeast to its terminus at Saddletowne station. Future expansionStudies in 2018 included an expansion of the northeast section of the Blue Line beyond the existing terminus at Saddletowne station, along 60 Street NE, turning west onto 128 Avenue NE, on which it would end. The study includes three stations, one at 88 Avenue NE, one on Country Hills Boulevard, and one on 128 Avenue NE. The project though is not included in the City's mobility plan and has yet to be funded.[8] The west leg is also set to be extended to 85th Street in aspen woods. See also
References1. ^{{cite web |title=SD160 Light Rail Vehicle: Calgary, Canada |publisher=Siemens Transportation Systems, Inc |quote=Catenary supply voltage: 600 Vdc |url=http://www.mobility.siemens.com/shared/data/pdf/sts_usa_internet/calgary_sd160.pdf |format=PDF |year=2007 |accessdate=January 23, 2011 |deadurl=yes |archiveurl=https://web.archive.org/web/20101026082202/http://www.mobility.siemens.com/shared/data/pdf/sts_usa_internet/calgary_sd160.pdf |archivedate=October 26, 2010 |df=mdy-all }} {{CTrain navbox}}2. ^1 {{cite journal|last1=Hubbel|first1=John|last2=Colquhoun|first2=Dave|title=Light Rail Transit in Calgary The First 25 Years|date=12 April 2006|url=https://www.calgarytransit.com/sites/default/files/reports/calgarys_lrt_1st_25years_trb_revised.pdf|accessdate=12 March 2018}} 3. ^McKnight-Westwinds Rider's Guide {{webarchive|url=https://web.archive.org/web/20110520180310/http://www.calgarytransit.com/pdf/mcknight_westwinds_riders_guide.pdf |date=2011-05-20 }} 4. ^{{cite news|title=Saddletowne, Martindale LRT Openings Confusing For Some In Calgary|url=http://www.huffingtonpost.ca/2012/08/27/saddletowne-martindale-lrt-confusing_n_1834883.html|accessdate=12 March 2018|work=HuffPost Canada|date=27 August 2012|language=en-CA}} 5. ^1 {{cite news|title=West leg of LRT on track for December opening|url=https://calgary.ctvnews.ca/west-leg-of-lrt-on-track-for-december-opening-1.1028664|work=CTV Calgary|date=7 November 2012|language=en-CA}} 6. ^{{cite news|last1=Markusoff|first1=,Jason|title=Four-car LRT project’s price tag hits $300M|url=https://calgaryherald.com/news/calgary/Four+project+price+hits+300M/10089255/story.html|accessdate=12 March 2018|work=Calgary Herald|date=8 May 2014|language=en-ca}} 7. ^{{cite news|last1=Gilligan|first1=Melissa|title=Calgary Transit launches 4-car CTrain service on Blue Line LRT|url=https://globalnews.ca/news/3417630/calgary-transit-launching-four-car-service-on-blue-line/|accessdate=12 March 2018|work=Global News|date=1 May 2017|language=en}} 8. ^{{cite web|title=Blue Line (Northeast) LRT Extension Preliminary Design Study|url=http://www.calgary.ca/Transportation/TI/Pages/Transit-projects/Blue-line-lrt-extension-preliminary-design-study.aspx?redirect=/nelrtextension|publisher=City of Calgary|accessdate=12 March 2018|language=en-CAN|date=27 April 2017}} 3 : CTrain|Railway lines opened in 1985|1985 in Alberta |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。