请输入您要查询的百科知识:

 

词条 BVG Class HK
释义

  1. References

  2. External links

{{multiple issues|{{context|date=June 2017}}{{orphan|date=June 2017}}{{unreferenced|date=June 2017}}
}}{{Infobox Train
| background = yellow
| name = BVG Class HK
| image = File:BVG_HK_series_1004_leaving_Mendelssohn-Bartholdy-Park_station_20130718_3.jpg
| imagesize =
| caption = A HK-type train
| interiorimage =
| interiorcaption =
| service = 2001-present
| manufacturer = Bombardier Transportation
| factory = Hennigsdorf
| yearconstruction = 2001-2007
| yearservice = 2001
|numberconstruction=
| numberbuilt= 24 trains
| numberservice   =
| numberscrapped =
| formation = 4 per train set
DT–M–M–DT
|fleetnumbers = 1001 - 1024
| capacity = 296 seated; 1,624 standing; 2 PIW spaces
| operator = Berliner Verkehrsbetriebe
| depots =
| lines = U1 & U2
| carbody = Aluminium-alloy double-skinned construction
| carlength = 9.874 m
| width = 2.65 m
| height = 1.80 m
| floorheight =
| platformheight =
| entrylevelorstep =
| art-sections =
| doors = 1.80 m, 8 per car
| maxspeed = {{convert|80|km/h|mph|abbr=on}}
| weight = 226.8t /335.9 t (laden)
| acceleration = 1.0 m/s2
| deceleration = 1.2 m/s2 (service)
1.3 m/s2 (emergency)
| traction =
| poweroutput = {{convert|2.24|MW|abbr=on}}
| transmission = WN Drive
| aux = IGBT–VVVF Auxiliary Inverter with Battery Charger
80 kVA–16 kW
| powersupply =
| collectionmethod = Third rail
| gauge = {{RailGauge|sg|allk=on}}
|electricsystem = 750 V DC
| brakes = Regenerative Braking, Resistor Braking, Air Brakes
| safety =
| coupling =
}}

In allusion to the Großprofil series H two prototypes were built in 2000, which had the designation HK - originally, the plan had been to call them A4. Unlike their Großprofil model, cars on these trains are not fully inter-connected for passengers. Four tenders has been called, Adtranz, Bombardier Transportation, Kawasaki Heavy Industries & Nippon Sharyo and Siemens. However, Adtranz has been acquired by Bombardier Transportation in 2001 and Kawasaki Heavy Industries has only been keen in the C751B contract, therefore Bombardier Transportation has been selected as the preferred bid.

A full train can be divided into two half trains. The production of the first train started in May 2005. On the U2 these new trains now represent a majority of trains run. They replaced all the A3L67 trains in 2007.

Majority of the trains run on the U2, while some of them ran on the U1 if there is an emergency situation like trackworks or pullover and hardly any ran on the U3 and U4.

References

External links

2 : Berlin U-Bahn|Electric multiple units of Germany

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/13 12:56:17