请输入您要查询的百科知识:

 

词条 Byron Bay Railroad Company
释义

  1. History

  2. Train

  3. Stations

  4. Ticketing

  5. External links

  6. References

{{Use Australian English|date=November 2017}}{{Use dmy dates|date=November 2017}}{{Infobox public transit
| image = Railmotor 726-661 stands at Byron Beach Platform, Byron Bay. 3-11-17.jpg
| imagesize =
| alt =
| caption = 726 at Byron Beach platform in November 2017
| owner = North Byron Beach Resort
| area served =
| locale = Byron Bay
| transit_type = Heritage railway
| line_number =
| start = North Beach
| end = Byron Beach
| stations = 2
| annual_ridership =
| chief_executive =
| website = www.byronbaytrain.com.au
| began_operation = 16 December 2017
| operator =
| character =
| vehicles = 1
| map =
| map_state =
}}

The Byron Bay Railroad Company (also known as the Byron Bay Train) is a not-for-profit passenger rail operator serving Byron Bay, New South Wales operating on a three kilometre section of the disused Casino-Murwillimbah line. Operations commenced in December 2017.

The company has converted a 1949 built 600 class railcar to solar power for use on the line.

History

{{See also|Murwillumbah railway line}}

The first section of the Murwillimbah line (which the Byron Bay Train uses) opened between Lismore and Murwillumbah, connecting the Richmond and Tweed rivers. Passengers and goods were transported to Sydney by coastal shipping from Byron Bay. Nine years later, an extension from Lismore to Casino opened (and later south to Grafton – it was not until 1932 that the line was fully connected to Sydney). The line became a branch line when in 1930, the North Coast line was extended from Kyogle to South Brisbane.[1]

The section of track to the north of the town centre has been fully restored by private investment at a cost of about $300,000 per kilometre.[2]. Track work on the section commenced on 23 May 2016 and was completed in late November 2016. New platforms and a storage shed were completed in April 2017, the focus is now on the recruitment and training of drivers, station staff and the testing of the train prior to the commencement of passenger services by Christmas 2017.[3] It was confirmed in early January 2017 the train would run on solar-hybrid operation. The solar service is believed to be a world first.[4][5]

Operations commenced on 16 December 2017.[1][6][7] The service carried over 10,000 passengers in its first 19 days.[8]

Train

The Byron Bay Railroad Company operates a single railmotor. Power car 661, along with trailer 761, was built at Chullora Railway Workshops in 1949 as 601/701. In 1973, it was upgraded with its GM Detroit Diesel 6/71 engines replaced with Cummins NT855-R2 engines and was subsequently renumbered 661/761. Withdrawn by the State Rail Authority in the early 1990s, it was sold to the Lithgow State Mine Heritage Park & Railway.

After 761 was destroyed by a bushfire, the 1960s-built trailer 726 was acquired as a replacement. It was restored to service in 2015 and operated a few charters on the Gwabegar line to Rylstone and Main Western line to Tarana.[9][10][11] In 2017, it was converted to solar-hybrid operation. The conversion was completed in October 2017, and the railmotor was moved from Lithgow by road, arriving on 3 November 2017.[12][13] Electricity will be supplied from the grid when there is insufficient solar and the train is intended to run on diesel fuel about once a week.[14]

The railmotor has a seating capacity of 100 people.[15] It is believed to be the world's first solar-powered train.[16][17]

Stations

The train operates a return shuttle between North Beach station located in Sunrise Beach and Byron Beach station, which serves the beach and Byron township. Due to the service not being subsidised by the government, the timetable will be reviewed from time to time. The train contains room for bikes, prams and surfboards, which can be carried free of charge.[15][18] It does not use the existing station as this would have required the reinstatement of a level crossing.[1]

The North Beach station is located on Bayshore Drive, near the Sun Bistro Tavern and Elements of Byron Resort. The Byron Beach station is located on the northern side of the Lawson Street level crossing in the Byron Bay CBD.

Ticketing

Passengers aged 0–5 years ride free, with those aged 6–13 travelling for $2, and passengers fourteen and up travelling for $3 on a one-way journey. A 10 ride adult ticket is available for $27, which provides a 10% saving.[15]

External links

  • Official website

References

1. ^"Byron Bay Railroad Company" Railway Digest March 2018 pages 50-54
2. ^{{cite web|url=http://www.echo.net.au/2014/12/rail-shuttle-costs-way-below-government-estimate/|title=Rail costings put govt study into doubt – Echonetdaily|date=16 December 2014|publisher=Echo.net.au|accessdate=31 March 2016}}
3. ^{{Cite news|url=https://www.echo.net.au/2017/11/train-hits-track-powered-solar/|title=Train hits track, powered by solar – Echonetdaily|date=7 November 2017|work=Echonetdaily|access-date=26 November 2017}}
4. ^{{Cite web|url=http://byronbaytrain.com.au/history/|title=Byron Bay Train " History|publisher=byronbaytrain.com.au|access-date=29 October 2017}}
5. ^{{Cite news|url=https://www.northernstar.com.au/news/world-first-byron-rail-line-to-create-19-jobs/3177297/|title=World-first Byron rail line to create 19 jobs|last=Broome|first=Hamish|work=Northern Star|access-date=22 July 2017}}
6. ^World first solar train now leaving the platform in Byron Bay with zero emissions ABC News 17 December 2017
7. ^[https://www.railexpress.com.au/solar-train-enters-service-in-byron-bay/ Solar train enters service in Byron Bay] Rail Express 18 December 2017
8. ^{{Cite news|url=https://www.northernstar.com.au/news/success-story-byron-solar-train-clocks-10000-trips/3308210/|title=Solar train clocks 10,000 passengers after 19 days|last=Broome|first=Hamish|work=Northern Star|access-date=2018-01-13|language=en}}
9. ^Our Rolling Stock Lithgow State Mine Railway
10. ^Rylstone line to re-open for show train Mudgee Guardian 18 January 2016
11. ^{{Cite web|url=http://byronbaytrain.com.au/history/|title=Byron Bay Train " History|publisher=byronbaytrain.com.au|access-date=29 October 2017}}
12. ^Lithgow-tech: Solar powered train to run Byron Bay Circuit Lithgow Mercury 31 October 2017
13. ^[https://www.northernstar.com.au/news/solar-train-arrives-in-byron-bay/3256153/#/0 Huge milestone as solar train arrives in Byron] The Northern Star 3 November 2017
14. ^{{Cite news|url=https://www.northernstar.com.au/news/byron-bay-rail-revived-after-13-years-with-solar-t/3292364/#/0|title=Byron Bay rail revived after 13 years with solar train|last=BURKE|first=JASMINE|work=Northern Star|access-date=2017-12-20|language=en}}
15. ^{{Cite web|url=http://byronbaytrain.com.au/service/|title=Byron Bay Train " Service|publisher=byronbaytrain.com.au|access-date=29 October 2017}}
16. ^{{Cite web|url=http://www.goldcoastbulletin.com.au/news/gold-coast/volunteers-to-drive-byron-bays-solar-train-possibly-within-weeks/news-story/9dd2806f898a5ae725f4e95a250f2bd4|title=World's first true solar train to run through Byron Bay|last=Affleck|first=John|date=2 August 2017|website=Gold Coast Bulletin|dead-url=}}
17. ^{{Cite news|url=http://reneweconomy.com.au/world-first-solar-train-about-to-be-launched-in-byron-bay-93544/|title=World-first "solar train" about to be launched in Byron Bay|date=27 October 2017|work=RenewEconomy|access-date=29 October 2017}}
18. ^{{Cite web|url=http://northbyronbeachresort.com.au/rail-shuttle/|title=North Byron Beach Resort " Byron Bay train|publisher=northbyronbeachresort.com.au|access-date=29 October 2017}}

5 : Byron Bay, New South Wales|Passenger railway companies of Australia|Railway companies of New South Wales|Railway companies established in 2017|2017 establishments in Australia

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/22 10:36:29