词条 | Wonderland station |
释义 |
| name=Wonderland | style=MBTA blue | image=Wonderland platforms.jpg | image_size= | image_caption=A Blue Line train approaches the platforms | address=1300 North Shore Road (Route 1A) Revere, Massachusetts | coordinates={{coord|42.4135|-70.9918|type:railwaystation_region:US-MA|display=inline,title}} | line={{rail color box|system=MBTA|line=Blue}} | other={{bus icon|12px}} MBTA Bus: {{MBTABus|110}}, {{MBTABus|116}}, {{MBTABus|117}}, {{MBTABus|411}}, {{MBTABus|424W}}, {{MBTABus|426W}}, {{MBTABus|441}}, {{MBTABus|442}}, {{MBTABus|448}}, {{MBTABus|449}}, {{MBTABus|450W}}, {{MBTABus|455}} | platform=2 side platforms | levels= | tracks=2 | parking=1,862 spaces (37 accessible) | bicycle=24 spaces "Pedal and Park" bicycle cage | passengers=6,105 (weekday average boardings)[1] | pass_year=2013 | opened=January 19, 1954[2] | rebuilt=June 24, 1995[2] July 2008[2] June 30, 2012[5] | electrified= | ADA=yes | former=Bath House (BRB&L) | services={{s-rail|title=MBTA}}{{s-line|system=MBTA|line=Blue|previous=Revere Beach|next=}} }} Wonderland is a transit station in Revere, Massachusetts. Located adjacent to Revere Beach, it is the current northern terminus of the MBTA Blue Line rapid transit system, as well as a major bus transfer station for the North Shore area. The station is fully handicapped accessible. A previous station, Bath House, was open near the site on the Boston, Revere Beach and Lynn Railroad from approximately 1900 to 1940. Wonderland station opened in January 1954. It was rebuilt in 1995, repaired in 2008, and upgraded with a large parking garage and pedestrian bridge in 2012. The station plays a role in the 1998 film Next Stop Wonderland as the eponymous destination of the main characters.[2] HistoryBRB<he narrow gauge Boston, Revere Beach and Lynn Railroad (BRB&L) opened from East Boston to Lynn on July 29, 1875.[7] The line ran directly adjacent to the beachfront, a popular summer destination, on the alignment of the modern Revere Beach Boulevard. The Eastern Railroad opened its Chelsea Beach Branch in 1881 along the modern Blue Line corridor slightly inland. A third line - the Boston, Winthrop, and Shore Railroad - shared the Chelsea Beach Branch alignment in 1884-5.[8] None of the three railroads initially stopped at the modern station site, which was then an unpopulated swampy area. The BRB&L had a stop named Atlantic (later renamed as Revere Street) at Revere Street some {{convert|2000|feet}} to the north of the modern station site from the beginning of its operations; the other railroads may have briefly had Revere Street stops as well.[3] The Chelsea Beach Branch, which operated only during the summer, ended operations in 1891, although the rails remained in place until the 1920s.[4][5] In April 1897, the BRB&L was moved inland onto the modern right-of-way next to the abandoned Chelsea Beach Branch.[12] A new station, Bath House, was soon built on the east side of the tracks across from the new Revere Beach Bath House, just north of the modern station site.[6] By 1928 the line was electrified, with pre-pay stations - more a rapid transit line than a conventional railroad.[7] However, due to the Great Depression, the BRB&L shut down on January 27, 1940.[4] M.T.A. and MBTAIn 1941, the Boston Elevated Railway bought the BRB&L right of way from Day Square to Revere Beach for use as a high-speed trolley line similar to the Ashmont-Mattapan High Speed Line; these plans were delayed by the onset of World War II.[8] The 1926 Report on Improved Transportation Facilities and 1945–47 Coolidge Commission Report recommended that the East Boston Tunnel line, which had been converted to rapid transit from streetcars in 1924, be extended to Lynn via the BBRB&L route rather than using it for a trolley line.[17][9] In 1947, the newly formed Metropolitan Transit Authority (M.T.A.) decided to build to Lynn as a rapid transit line, and construction began in October 1948.[8] The first part of the Revere Extension opened to Orient Heights in January 1952 and Suffolk Downs in April 1952; the second phase (cut short due to limited funds) opened to Wonderland on January 19, 1954 with intermediate stations at Beachmont and Revere Beach.[8][10][11] Wonderland was originally to be named Bath House after the former station, but instead was named after the now-closed Wonderland Greyhound Park - itself named after Wonderland Amusement Park, which operated at the site from 1906 to 1911.[9][12] The Wonderland Blue Line terminus station has been in mostly continuous operation since 1954; however, service has been interrupted several times due to weather and construction. It was closed for flood damage from February 6 to March 13, 1978 after the Blizzard of '78, and from June 24 to September 10, 1983 for track work between Wonderland and Orient Heights.[11] RenovationsWonderland was closed for approximately one year starting on June 25, 1994 as the station was rebuilt along with Suffolk Downs, Revere Beach and Beachmont stations as part of the Blue Line Modernization Program. Blue Line service temporarily ended at Orient Heights and buses served the closed stations during the $467 million improvement project to upgrade four stations on the line.[13][11] Wonderland station was largely rebuilt at a cost of $9 million; it reopened along with the other stations on June 24, 1995.[14] The station was closed while additional platform repair work was performed from June 21 to July 3, 2008.[11] Wonderland Intermodal Transit CenterAs early as 1973, the MBTA proposed constructing a parking garage at Wonderland.[15] In 2006, the MBTA settled a lawsuit with the Conservation Law Foundation over emissions from increased auto traffic through downtown Boston due to the Big Dig. As part of the settlement, the MBTA was required to implement twenty transit improvements.[16] One of these projects was the Wonderland Intermodal Transit Center, which started construction in September 2010 and opened on June 30, 2012.[17][18] The $53.5 million project, partially funded by the 2009 Stimulus Act, included the 1465-space South Parking Garage as well as a new sheltered busway, bicycle storage, and improved pedestrian connections.[17][19] The $20 million Christina and John Markey Memorial Pedestrian Bridge opened on July 4, 2013 from the station area to Revere Beach, allowing access to the station without crossing busy Ocean Avenue.[20][21] Future plansEver since the 1954 Revere extension was cut short to Wonderland, a further extension to Lynn has been planned. Various state and federal reports in 1966, 1969, 1973, 1978, and 1983 all recommended extensions of the Blue Line to Lynn or even Salem, Massachusetts, but funding was instead given to the Haymarket North Extension and Southwest Corridor projects on the Orange Line and the Alewife and Braintree extensions of the Red Line.[10] The extension is still continually discussed, but due to the lack of an identified funding source it has not received priority.[22] The Draft Environmental Impact Statement, which has been under development since 2002, will include several possible projects. They include extending the Blue Line directly to Lynn, a shorter extension to a new Revere Center commuter rail station, or a direct transfer from Wonderland via people mover to the new commuter rail station.[23] In March 2012, the MBTA announced plans to place solar panels on the roof of the new South Garage. The panels would be installed and maintained by an outside contractor.[24] A winning bidder was chosen in June 2012 and approved by the board in September, with expected completion by June 2013.[25] However, as of 2015, the solar panels have not been installed. Bus connectionsAs the terminus of the Blue Line, Wonderland serves as a major bus transfer station. All routes except southbound route 411 buses (which run on Ocean Avenue) use a busway in the garage off Route 1A, which opened on June 30, 2012.[17][26] Previously, several routes used a two-lane busway off Ocean Avenue. Until September 2016, inbound route 448 and 449 buses stopped on North Shore Road opposite the station rather than using the new busway.[11]
The 424W, 426W, and 450W routes operate weekends only. On weekdays, the 424, 426, and 450 routes operate instead to Haymarket. The 441, 442, and 455 routes formerly operated in this manner as well; however, Wonderland became their full-time terminus as part of systemwide changes on July 1, 2012.[11] Platform layout{{MBTA Blue Line Platform Layout}}References1. ^{{cite web |url=http://www.mbta.com/uploadedfiles/documents/2014%20BLUEBOOK%2014th%20Edition.pdf |title=Ridership and Service Statistics |edition=14 |publisher=Massachusetts Bay Transportation Authority |year=2014 |accessdate=5 July 2015}} 2. ^{{cite web |url=https://www2.massgeneral.org/pubaffairs/issues/Sept%2025%20wonderland.htm |archiveurl=https://web.archive.org/web/20081201174230/http://www.massgeneral.org/pubaffairs/Issues/Sept%2025%20wonderland.htm |archivedate=1 December 2008 |title=MGH makes cameo appearance in "Next Stop, Wonderland" |work=MGH Hotline |date=25 September 1998}} 3. ^1 {{cite book |url=https://books.google.com/books/about/The_Boston_Revere_Beach_and_Lynn_Narrow.html?id=KygwAQAAMAAJ |title=The Boston, Revere Beach and Lynn Narrow Gauge Railroad |last=Bradlee |first=Francis Boardman Crowninshield |year=1921 |publisher=Essex Institute |via=Google Books |pages=4–5}} 4. ^1 2 {{cite book |title=The Rail Lines of Southern New England |last=Karr |first=Ronald Dale |publisher=Branch Line Press |year=1995 |isbn=0942147022 |pages=262, 268–272}} 5. ^{{cite book |title=Lost Railroads of New England |author=Karr, Ronald Dale |edition=Third |publisher=Branch Line Press |year=2010 |isbn=9780942147117 |page=91}} 6. ^{{cite web |url=http://www.wardmaps.com/viewasset.php?aid=16336 |title=Plan for Improvement of Ocean Avenue in City of Revere, Mass. |date=6 January 1916 |publisher=Metropolitan Park Commission |via=WardMaps}} 7. ^{{cite journal |url=https://archive.org/stream/electricrailwayj72mcgrrich#page/990/mode/2up |title="Narrow Gage" Electrified for Economy |journal=Electric Railway Journal |date=8 December 1928 |volume=72 |issue=23 |pages=991–998 |accessdate=24 December 2015 |via=Internet Archive}} 8. ^1 2 3 {{cite book |title=Boston's Blue Line |last=Cheney |first=Frank |year=2003 |publisher=Arcadia Publishing |isbn=9780738535760 |pages=8, 74, 83}} 9. ^1 {{citation |title=Boston Rapid Transit System & Proposed Extensions 1945 - Metropolitan Transit Recess Commission Air View |year=1945 |author=Boston Elevated Railway and Boston Department of Public Utilities|accessdate=4 July 2015}} 10. ^1 2 {{cite web |url=http://ntl.bts.gov/DOCS/boston.html |title=The Transportation Plan for the Boston Region - Volume 2 |date=15 November 1993 |publisher=National Transportation Library |author=Central Transportation Planning Staff |accessdate=3 July 2012}} 11. ^1 2 3 4 5 6 7 8 {{cite web |url=http://www.transithistory.org/roster/MBTARouteHistory.pdf|title=Changes to Transit Service in the MBTA district 1964-2015 |last=Belcher |first=Jonathan |date=August 2016 |format=PDF |publisher=NETransit |accessdate=September 1, 2016}} 12. ^{{cite web |url=http://reverebeach.com/history/ |title=History Overview |publisher=RevereBeach.com |accessdate=24 December 2015}} 13. ^{{cite news |url=http://www.highbeam.com/doc/1P2-8271360.html |archive-url=https://web.archive.org/web/20140611025723/http://www.highbeam.com/doc/1P2-8271360.html |dead-url=yes |archive-date=11 June 2014 |title=MBTA to begin $467 million Blue Line project |newspaper=Boston Globe |date=20 March 1994 |author=Blake, Andrew |accessdate=26 January 2014 |subscription=yes |via=Highbeam Research}} 14. ^{{cite news |url=http://www.highbeam.com/doc/1P2-8332592.html |archive-url=https://web.archive.org/web/20140611025719/http://www.highbeam.com/doc/1P2-8332592.html |dead-url=yes |archive-date=11 June 2014 |title=Blue Line Stations Set to Reopen After $467M Upgrade|last=Blake|first=Andrew|date=18 June 1995 |newspaper=Boston Globe |accessdate=4 July 2015 |via=Highbeam Research |subscription=yes}} 15. ^{{cite news |url=http://search.proquest.com/docview/612899252 |title=$100m parking plans snagged by lot abuttors |newspaper=Boston Globe |date=9 November 1973 |first=A.S. |last=Plotkin |via=Proquest Historical Newspapers |subscription=yes}} 16. ^{{cite web |url=http://environment.transportation.org/clue/case_details.aspx?case_id=29 |title=Case Law Updates Details: Conservation Law Foundation v. Romney |publisher= American Association of State Highway and Transportation Officials |work=Center for Environmental Excellence |accessdate=2 July 2012}} 17. ^1 2 3 {{cite web |url=http://www.mbta.com/about_the_mbta/news_events/?id=25145 |title= Patrick-Murray Administration Celebrates Opening of Wonderland Intermodal Transit Center |publisher=Massachusetts Bay Transportation Authority |date=30 June 2012 |accessdate=2 July 2012}} 18. ^{{cite news |url=http://www.boston.com/news/local/massachusetts/articles/2012/06/24/wonderland_garage_to_open_july_1_t_garages_slated_for_beverly_salem/ |title=Projects to ease parking crunch |newspaper=Boston Globe |date=24 June 2012 |last=Rosenberg |first=Steven A. |accessdate=2 December 2015}} 19. ^{{cite web |url=http://www.mbta.com/about_the_mbta/t_projects/default.asp?id=1074 |title=T Projects: Wonderland TOD |publisher=Massachusetts Bay Transportation Authority |accessdate=3 July 2012}} 20. ^{{cite news |url=http://www.reverejournal.com/2013/07/10/wondy-pedestrian-bridge-plaza-opens-quietly/ |newspaper=Revere Journal |title=Wondy Pedestrian Bridge, Plaza Opens Quietly |last=Daniel |first=Seth |date=10 July 2013 |accessdate=2 December 2015}} 21. ^{{Structurae|id=20065776|title=Christina and John Markey Memorial Pedestrian Bridge}} 22. ^{{cite web |url=http://www.boston.com/news/local/articles/2008/04/06/blue_line_blues/ |archiveurl=https://web.archive.org/web/20080726201650/http://www.boston.com/news/local/articles/2008/04/06/blue_line_blues/ |archivedate=26 July 2008 |title=Blue Line Blues |last=Rosenburg |first=Steven |date=6 April 2008 |newspaper=Boston Globe}} 23. ^{{cite web |url=http://www.mbta.com/about_the_mbta/t_projects/default.asp?id=1012#impact |title=North Shore Transit Improvements |publisher=Massachusetts Bay Transportation Authority |accessdate=3 July 2012}} 24. ^{{cite news |url=https://www.bostonglobe.com/metro/2012/03/26/mbta-wants-solar-companies-build-solar-plants-wonderland-revere-and-readville-yard-dedham/2OVfIeUfbisGbdd9r9UJsM/story.html |title=MBTA wants solar companies to build plants at Wonderland in Revere and Readville Yard 5 in Dedham |newspaper=Boston Globe |author=Young, Colin A. |date=27 March 2012 |accessdate=24 December 2015}} 25. ^{{cite news |url=http://www.itemlive.com/news/mbta-to-launch-solar-energy-program-at-wonderland/article_1d8c64fc-d9f3-501b-bc32-15562bd2b515.html |title=MBTA to launch solar energy program at Wonderland |newspaper=Daily Item |last=Stevens |first=Chris |date=15 September 2012 |accessdate=15 July 2015}} 26. ^{{cite web |url=http://www.mbta.com/uploadedfiles/services/subway/Wonderland%20Neighborhood%20Map.pdf |title=Wonderland Station Neighborhood Map |publisher=Massachusetts Bay Transportation Authority |date=April 2012 |accessdate=2 December 2015}} External links{{Commons category}}
6 : Blue Line (MBTA) stations|Railway stations in Suffolk County, Massachusetts|Boston, Revere Beach and Lynn Railroad stations|Railway stations opened in 1954|1954 establishments in Massachusetts|Revere, Massachusetts |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。