请输入您要查询的百科知识:

 

词条 Eastern Busway, Auckland
释义

  1. See also

  2. References

{{EngvarB|date=December 2018}}{{Use dmy dates|date=December 2018}}{{Infobox rail line
|color =
|logo =
|name = Eastern Busway
|image =
|image_width =
|caption =
|type = Busway
|system =
|status = Under construction
|locale = east Auckland
|start = Panmure railway station
|end = Botany Downs
|stations =
|routes =
|open =
|close =
|owner = Auckland Transport
|operator = AT Metro
|character = Urban rapid transit
|stock =
|linelength =
|tracklength =
|gauge =
|speed =
|elevation =
|map = {{Eastern Busway, Auckland}}
}}

The Eastern Busway is a busway project that is under construction in the south-eastern suburbs of Auckland, New Zealand. The bus lanes, segregated from all other traffic, will connect the current bus interchange at Panmure railway station with a bus station that will be built near the Botany Town Centre in Botany Downs. An intermediate station will be built at Pakuranga, near the Pakuranga Plaza shopping centre.

The busway was formerly named Auckland-Manukau Eastern Transport Initiative (AMETI). It is expected to be completed in about 2026 at a cost of NZ$1.4 billion.[1]

In early 2018, preliminary demolition and removal of some properties in Panmure took place, and in October 2018, removal of 61 remaining properties began. Auckland Council's transport and property management CCO's, Auckland Transport and Panuku respectively, had worked to re-house affected owners and tenants.[2]

The removal of the 61 properties from Lagoon Drive and Pakuranga Road is expected to be completed by early 2019, to allow construction of the lanes of the Panmure-Pakuranga section to start in March or April.[1]

A new bridge, dedicated to the busway lanes, will be built across the Tamaki Estuary, alongside the existing Panmure Bridge.[3]

On completion, the busway is expected to account for 35 percent of all journeys across Panmure Bridge, about 22,000 bus passengers per day.[4]

See also

  • Eastern Transport Corridor – a route reserved for an eastern motorway that was politically unpopular and led to the busway project
  • Northern Busway, Auckland
  • Other busway systems
  • Public transport in Auckland

References

1. ^{{cite web|url=https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12149408|accessdate=6 December 2018|title=Work starting on next stage of $1.4 billion busway in east Auckland|date=26 October 2018|publisher=The New Zealand Herald}}
2. ^{{cite web|url=http://www.times.co.nz/news/preparation-for-construction-of-ameti-eastern-busway-ramps-up/|accessdate=6 December 2018|title=Preparation for construction of AMETI Eastern Busway ramps up|date=19 October 2018|publisher=Times Online - times.co.nz}}
3. ^{{cite web|url=https://www.stuff.co.nz/auckland/local-news/eastern-courier/102560430/second-stage-of-longterm-auckland-transport-project-to-start-this-year|accessdate=7 December 2018|title=Second stage of long-term Auckland Transport project to start this year|date=26 March 2018|publisher=Stuff.co.nz}}
4. ^{{cite web|url=https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=11619038|accessdate=7 December 2018|title=Auckland's first urban busway mooted for Pakuranga to Panmure|date=8 April 2016|publisher=The New Zealand Herald}}

2 : Busways|Transport in Auckland

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/18 14:05:50