词条 | Formosa 1 Offshore Wind Farm |
释义 |
| name = Formosa 1 Offshore Wind Farm | name_official = | image = | image_caption = | location = Miaoli County, Taiwan | coordinates = {{Coord|24|41|27.8|N|120|48|59.3|E|display=inline,title}} | status = O | construction_began = November 2016 | commissioned = April 2017 | decommissioned = | cost = | owner = Macquarie Capital (50%) Ørsted (35%) Swancor Renewable (15%) | operator = | employees = | wind_farm_type = Offshore | wind_site_usage = Electricity generation | wind_offshore_depth = 15-30 m | wind_offshore_distance = 6 km | wind_hub_height = | wind_rotor_diameter = | wind_rated_speed = | ps_site_area = | ps_site_elevation = | ps_feed-in_tariff = | ps_revenue = | ps_units_operational = | ps_units_manu_model = | ps_units_uc = | ps_units_planned = | ps_units_cancelled = | ps_units_decommissioned= | ps_electrical_capacity = 8 MW | ps_electrical_cap_fac = | ps_annual_generation = | ps_storage_capacity = | website = }} The Formosa 1 Offshore Wind Farm is an offshore wind power station in Miaoli County, Taiwan. It is Taiwan's first offshore wind farm.[1] HistoryThe Changhua County Government signed a memorandum of understanding with Macquarie Formosa 1 and Swancor Renewable Energy in March 2017 to invest NT$210 billion to the Formosa 1 Offshore Wind Farm project. The Macquarie Group then secured funding in June 2018 for the project from local and international banks. K2 Management was appointed as the consultant and Sinotech Engineering Consultants was appointed as the EPC contractor for the project. Sinotech then subcontracted the turbine foundation design to COWI. The first phase of the wind turbines were installed in November 2016 and commenced operation in April 2017.[2] Currently the wind power station is undergoing the second phase of the wind turbines construction expansion to install 120 MW capacity of electricity generations. ArchitectureThe wind power station was installed 6 km offshore of Miaoli County in the Taiwan Straits over an area of 11 km2.[2] Technical specificationsThe total installed capacity of the first phase is 8 MW, consists of two wind turbines from Siemens. Each turbine has a 120 m diameter rotor, 58.5 m long rotor blades and 11,300 m2 swept area. The turbines are installed on monopile foundations. The wind turbine performance is constantly monitored from Brande, Denmark.[2] FinanceThe wind power stations distributes the generated power to Taiwan Power Company based on feed-in tariff agreed in a power purchase agreement for 20 years.[2] See also
References1. ^{{cite web|first1=Joshua S.|last1=Hill|url=https://cleantechnica.com/2018/06/12/taiwans-120-megawatt-formosa-1-offshore-wind-farm-reaches-financial-close/|title=Taiwan's 120 Megawatt Formosa 1 Offshore Wind Farm Reaches Financial Close|date=12 June 2018|website=CleanTechnica|accessdate=22 March 2019}} {{Taiwan-struct-stub}}2. ^1 2 3 {{cite web|url=https://www.power-technology.com/projects/formosa-1-offshore-wind-farm/|title=Formosa 1 Offshore Wind Farm|website=Power Technology|accessdate=22 March 2019}} 4 : 2017 establishments in Taiwan|Buildings and structures in Miaoli County|Energy infrastructure completed in 2017|Wind farms in Taiwan |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。