词条 Horns Rev Offshore Wind Farm
释义

  1. Horns Rev 1

  2. Horns Rev 2

  3. Horns Rev 3

  4. See also

  5. References

{{Infobox power station name = Horns Rev 1 name_official = image = HornsRev Blavandshuk.jpg image_size = image_caption = Horns Rev 1 wind farm with Horns Rev A substation platform image_alt = location_map = North Sea location_map_size = location_map_caption =55|31|47|N|7|54|22|E|type:landmark_region:DK|display=inline,title}} coordinates_ref = country = Denmark location = Horns Rev, East North Sea status = Operational construction_began = commissioned = 2002 decommissioned = cost = owner = Vattenfall (60%)
DONG Energy (40%)
operator = Vattenfall ps_units_operational = 80 ps_units_manu_model = Vestas Wind Systems: V80-2.070|m|0|abbr=on}}80|m|0|abbr=on}}9.7|m/s|0|abbr=on}} wind_farm_type = Offshore6|–|14|m|0|abbr=on}}14|–|20|km|0|abbr=on}} ps_electrical_capacity = 160 MW[1] ps_electrical_cap_fac = ps_annual_generation = 600 GW·h[2] website = [https://web.archive.org/web/20101121000931/http://www.hornsrev.dk/index.en.html www.hornsrev.dk] extra =
}}
{{Infobox power station name = Horns Rev 2 name_official = image =   image_size = image_caption = image_alt = location_map = North Sea location_map_size = location_map_caption =55|36|00|N|7|35|24|E|type:landmark_region:DK|display=inline}} coordinates_ref = country = Denmark location = Horns Rev, East North Sea status = Operational construction_began = May 2008 commissioned = November 2009 decommissioned = cost = €448 million[3] owner = DONG Energy operator = ps_units_operational = 91 ps_units_manu_model = Siemens Wind Power: SWT 2.3-9368|m|0|abbr=on}}93|m|0|abbr=on}}10|m/s|0|abbr=on}} wind_farm_type = Offshore9|–|17|m|0|abbr=on}}30|km|0|abbr=on}} ps_electrical_capacity = 209 MW ps_electrical_cap_fac = 47.7%[4] website = [https://web.archive.org/web/20101116113126/http://www.dongenergy.com/Hornsrev2/EN/Pages/index.aspx www.dongenergy.com] extra =
}}
{{Infobox power station name = Horns Rev 3 name_official = image =   image_size = image_caption = image_alt = location_map = North Sea location_map_size = location_map_caption =55|41|40|N|7|41|00|E|type:landmark_region:DK|display=inline}} coordinates_ref = country = Denmark location = Horns Rev, East North Sea status = Under construction construction_began = 2016 commissioned = 2019 decommissioned = cost = €1 billion[5] owner = Vattenfall operator = ps_units_operational = 49 ps_units_manu_model = MHI Vestas: V164105|m|0|abbr=on}}164|m|0|abbr=on}}14|m/s|0|abbr=on}} wind_farm_type = Offshore11|–|19|m|0|abbr=on}}29|-|44|km|0|abbr=on}} ps_electrical_capacity = 406.7 MW website = [https://web.archive.org/web/20190104231144/https://corporate.vattenfall.com/about-energy/renewable-energy-sources/wind-power/wind-power-at-vattenfall/horns-rev-3-offshore-wind-farm/ corporate.vattenfall.com] extra =
}}

Horns Rev is an offshore wind farm in Danish waters in the North Sea.

The wind farm was built in three phases, with the first coming online in 2002, the second in 2009 and the third in 2017.

The first phase was the first large scale offshore wind farm in the world with 160 MW.[1][6]

Horns Rev 1

Horns Rev 1 was the first large scale offshore wind farm in the world, at 160 MW, four times larger than the previous largest, the Middelgrunden at 40MW.[7][8]

Built by Danish Energy company Elsam (now Ørsted), it was the first offshore wind farm in the North Sea.

The farm has a total of 80 Vestas V80-2.0 MW units were installed by the Danish offshore wind farms services provider A2SEA in 2002 with the last turbine coming into operation on 11 December 2002.

It receives a guaranteed price of 0.453 DKK/kWh for the first 42,000 hours, paid by electricity consumers.[9]

Since 2005, the wind farm has been owned and operated by Vattenfall.

It cost DKK2bn.[10]

A radar has shown details of the wind patterns, improving local short-term forecasting.[11][12]

Turbines are laid out as an oblique rectangle of 5 km x 3.8 km (8 horizontal and 10 vertical rows). The distance between turbines is 560 m in both directions.

The main method of transport to the first wind park is an adapted Eurocopter EC-135 helicopter when winds are less than 19 m/s.[13] Hoisting the workers to and from a small platform on each turbine allows access to the park regardless of sea conditions which would otherwise prevent sailing in the area for a large part of the year.

Vattenfall can change a gearbox in a day, and the farm has an availability of 96-97%. Two turbines are burnt out, and are uneconomic to replace with less than 10 years left.[13]

Horns Rev 2

In May 2008, Dong Energy began construction of the second wind farm in the Horns Rev area, Horns Rev 2. Construction was completed in September 2009[14] and was inaugurated on September 17, 2009 by Prince Frederik on the Poseidon accommodation platform.[17]

When inaugurated, Horns Rev 2 was the largest offshore wind farm in the world until Thanet Wind Farm opened on 23 September 2010.[15][16]

For the year of 2012, HR2 reached a capacity factor of 52.0%.[4] It receives 51.8 øre/kWh for the first 50,000 hours, paid by electricity consumers.[9] The farm has had some cable outages,[17][18] and blades are being renovated.[19]

The Horns Rev 2 consists of 91 Siemens Wind Power SWT 2.3-93 wind turbines with a total generating capacity of 209 MW.[16] The foundations are monopiles like on Horns Rev 1.

It has the first offshore wind farm accommodation platform in the world, named Poseidon. It is connected by walkway to the transformer platform,[20] and is {{convert|750|m2}} large with 3 decks and weighs 422 tons. On-site accommodation is cheaper and more efficient than transporting service personnel by boat 2 hours from Esbjerg harbour {{convert|60|km}} away. A turbine is visited 10 times a year on average, mostly for routine service, and 1-2 times for fixing faults.[21] Flying people by helicopter to turbines like on Horns Rev 1 is not possible on Horns Rev 2 as the turbines there are not built for it, although the transformer platform has a helipad.[22] Poseidon has 24 rooms of 12 square meters each fitted with TV and internet. There is a gym, kitchen, dining room, laundry room, and a study room. Inspired by Poseidon, a similar platform is being built at the DanTysk wind farm.[23]

Horns Rev 3

In April 2012, most of the Danish Folketing (parliament) agreed to send out tenders in 2013 for a 400 MW wind farm at Horns Rev called Horns Rev 3, and a 600 MW at Kriegers Flak in the Baltic Sea, both likely receiving 90 øre/kWh for the first 50,000 hours.[9] This is expected to raise wind power in Denmark above the current 39% of annual electricity production,[24] which includes the 400 MW Anholt Offshore Wind Farm.[25][26] The Danish Energy Agency expects construction candidates for Horns Rev 3 to have experience with installing and operating a large offshore wind farm.[27][28] Some of the area is an old minefield from World War Two.[29] Four bidders were qualified for the tender.[30]

Vattenfall won the tender in February 2015, at a price of 77 øre/kWh, well below the 105 øre at Anholt.[31] Vattenfall states that they bid unaggressively against strong competition without sacrificing margins.[32] The price reduction contributes to a smaller "green subsidy" (PSO) over the next years.[33][34] A total of 49 MHI Vestas V164-8.3 MW units, capable of producing 406.7 MW, will be installed.[35] Three transformers were installed in July 2016.[36] The turbines of third phase started to produce electricity for the grid in December of 2018.[37]

See also

{{stack|{{Portal|Denmark|Weather|Renewable energy}}}}
  • Wind power in Denmark
  • List of offshore wind farms in Denmark
  • List of offshore wind farms in the North Sea
  • List of offshore wind farms
{{clear}}

References

1. ^Horns Rev Wind Farm {{webarchive|url=https://web.archive.org/web/20100129161045/http://www.hornsrev.dk/Engelsk/Projektet/uk-Projektet.htm |date=29 January 2010 }}, Horns Rev web site. Retrieved 11 March 2010.
2. ^{{cite web|title=Horns Rev|url=http://powerplants.vattenfall.com/powerplant/horns-rev|publisher=Vattenfall|accessdate=12 January 2011|deadurl=yes|archiveurl=https://web.archive.org/web/20110113032120/http://powerplants.vattenfall.com/powerplant/horns-rev|archivedate=13 January 2011|df=dmy-all}}
3. ^{{cite web|title=Where the Wind Blows|url=http://www.nib.int/news_publications/cases_and_feature_stories/dong_energy_2008|publisher=Nordic Investment Bank|accessdate=1 December 2011}}
4. ^{{cite web|url= http://www.energynumbers.info/capacity-factors-at-danish-offshore-wind-farms |website= energynumbers.info |title= Capacity factors at Danish offshore wind farms |author= Andrew |date= 2017-01-26 |accessdate= 2017-02-11}}
5. ^{{cite web|title=Vattenfall to spend $1.12bn on Danish wind farm|url=https://www.powerengineeringint.com/articles/2016/06/vattenfall-to-spend-1-12bn-on-danish-wind-farm.html8|publisher=Power Engineering International|accessdate=19 February 2019}}
6. ^Horns Revolution {{webarchive|url=https://web.archive.org/web/20110714110540/http://www.modernpowersystems.com/story.asp?storyCode=2017033 |date=14 July 2011 }}, Modern Power Systems 5 October 2002. Retrieved 11 March 2010.
7. ^Morgan, Colin. Offshore Wind - State of the Art page 24 Garrad Hassan, 20 October 2004. Retrieved: 19 November 2010.
8. ^Larsen, Jens H. The World´s largest off-shore windfarm, Middelgrunden 40MW Copenhagen Environment and Energy Office (CEEO), 2001. Retrieved: 19 November 2010.
9. ^{{cite web|url=http://www.ens.dk/sites/ens.dk/files/energistyrelsen/Nyheder/2014/pso-fremskrivning_2014_19052014.pdf|title=Fremskrivning af PSO-udgifter|page=4|publisher=Danish Energy Agency|date=19 May 2014|access-date=17 January 2015|language=da|trans-title=Projection of PSO Expenses|format=pdf}}
10. ^{{cite web|title=Horns Reef Wind Farm, Denmark|url=http://www.power-technology.com/projects/hornsreefwind/|publisher=power-technology.com|accessdate=1 December 2011}}{{Unreliable source?|reason=domain on WP:BLACKLIST|date=June 2016}}
11. ^Pinson, Pierre. Radar@Sea
12. ^PossPOW: Possible Power of Offshore Wind power plants Technical University of Denmark
13. ^http://ing.dk/artikel/horns-rev-laerte-vattenfall-lektien-173671
14. ^James Kanter. Largest Offshore Wind Farm to Go Online Green Inc., 15 September 2009.
15. ^Matthew McDermott. "Denmark Inaugurates World's Largest Offshore Wind Farm - 209 MW Horns Rev 2" Treehugger
16. ^{{cite news |url= http://www.rechargenews.com/energy/wind/article189250.ece |title= DONG cuts the ribbon at 209MW Horns Rev 2 project |newspaper = ReCharge | publisher = NHST Media Group | first = Karl-Erik | last = Stromsta |date=17 September 2009 |accessdate=19 November 2010 |id={{subscription required}}}}
17. ^http://ing.dk/artikel/soekabel-til-horns-rev-2-er-ude-af-drift-179590
18. ^http://energinet.dk/DA/El/Nyheder/Sider/Kabel-til-havmoelleparken-Horns-Rev-2-er-igen-i-drift.aspx
19. ^http://ing.dk/artikel/dong-og-siemens-giver-horns-rev-2-storstilet-vinge-makeover-173761
20. ^Accommodation Platform {{webarchive|url=https://web.archive.org/web/20110719235519/http://www.dongenergy.com/hornsrev2/en/about_horns_rev_2/about_the_project/pages/accomodation_platform.aspx |date=2011-07-19 }}, DONG Energy. Retrieved February 2010.
21. ^Krøyer, Kent. I kamp mod bølgerne: Teknikere besøger hver havmølle 10 gange om året (in Danish) Ing.dk, 14 December 2009. Accessed: 14 January 2015.
22. ^Naming Ceremony {{webarchive|url=https://web.archive.org/web/20110719235538/http://www.dongenergy.com/Hornsrev2/EN/News/Horns_Rev_2_News/News/Pages/Naming_Ceremony.aspx |date=2011-07-19 }}, DONG Energy. Retrieved February 2010.
23. ^Wittrup, Sanne. Vattenfall bygger verdens største beboelsesplatform ved havmøllepark (in Danish) Ing.dk, 14 January 2015. Accessed: 14 January 2015.
24. ^Rasmussen, Jesper Nørskov. "Vindmøller slog rekord i 2014 {{webarchive|url=https://web.archive.org/web/20150106223105/http://energinet.dk/DA/El/Nyheder/Sider/Vindmoeller-slog-rekord-i-2014.aspx |date=6 January 2015 }}" Energinet.dk, 6 January 2015. Accessed: 6 January 2015.
25. ^Dyrskjøt, Mette. "Two giant offshore wind park tenders in 2013" Dagbladet Børsen, 23 April 2012. Retrieved 23 April 2012.
26. ^"Energinet kicks off 1GW offshore work"{{dead link|date=April 2017 |bot=InternetArchiveBot |fix-attempted=yes }} reNews, 23 April 2012. Retrieved 23 April 2012.
27. ^"Danish Officials Seek Experienced Bidders" OffshoreWind, 11 October 2013. Retrieved: 12 October 2013.
28. ^"Draft for prequalification criteria for the tender of Horns Rev 3 offshore wind farm {{webarchive|url=https://web.archive.org/web/20150223231020/http://www.ens.dk/sites/ens.dk/files/byggeri/draft_for_prequalification_criteria.pdf |date=23 February 2015 }}" Danish Energy Agency, 10 October 2013. Retrieved: 12 October 2013.
29. ^Wittrup, Sanne. "70 tyske miner kan forsinke kommende havmøllepark" Ingeniøren, 23 February 2015. Accessed: 23 February 2015.
30. ^Wittrup, Sanne. "Horns Rev 3 er en godbid" Ingeniøren, 16 February 2015. Accessed: 12 March 2015.
31. ^Wittrup, Sanne. "Svenske Vattenfall skal bygge Danmarks næste havmøllepark {{Webarchive|url=https://web.archive.org/web/20150226223508/http://ing.dk/artikel/saa-er-det-afgjort-svenske-vattenfall-skal-bygge-danmarks-naeste-havmoellepark-174419# |date=2015-02-26 }}" Ingeniøren, 26 February 2015. Accessed: 26 February 2015.
32. ^Nielsen, Michael Korsgaard. "Vattenfall: Vi har ikke presset indtjeningen" Berlingske, 12 March 2015.
33. ^Wittrup, Sanne. "Regnefejl, billig vind og sene kystmøller sænker prisen på grøn omstilling" Ingeniøren, 27 March 2015. Accessed: 27 March 2015.
34. ^PSO prediction
35. ^"[https://corporate.vattenfall.com/about-energy/renewable-energy-sources/wind_power/wind-power-at-vattenfall/horns-rev-3-offshore-wind-farm/ Horns Rev 3 offshore wind farm] {{webarchive|url=https://web.archive.org/web/20161022222554/https://corporate.vattenfall.com/about-energy/renewable-energy-sources/wind_power/wind-power-at-vattenfall/horns-rev-3-offshore-wind-farm/ |date=22 October 2016 }}" Vattenfall, 27 June 2016. Accessed: 29 October 2016.
36. ^http://www.4coffshore.com/windfarms/transformer-units-sent-to-horns-rev-3-nid4077.html
37. ^"[https://www.4coffshore.com/news/first-power-for-horns-rev-3-nid11002.html First power for Horns Rev 3]" 4C Offshore, 24 December 2018. Accessed: 04 January 2019.
{{Wind power}}

3 : offshore wind farms in the North Sea|Wind farms in Denmark|Ørsted (company) wind farms