请输入您要查询的百科知识:

 

词条 Hyundai Global Business Center
释义

  1. History

  2. References

{{Update|documentation|date=October 2018}}{{Infobox building
| name = Hyundai Global Business Center
| native_name =
| native_name_lang =
| former_names =
| alternate_names =
| status = Approved
| image = Hyundai Global Business Center Renders - Seoul, Korea.jpg
| image_alt =
| image_size =
| caption =
| map_type =
| map_alt =
| map_caption =
| altitude =
| building_type =
| architectural_style =
| structural_system =
| cost =
| ren_cost =
| client =
| owner = Hyundai Motor Group
| current_tenants =
| landlord =
| location =
| address = Samseong-dong, Gangnam-gu
| location_town = Seoul
| location_country = South Korea
| coordinates = {{Coord|37.5119|N|127.0629|E|region:KR|display=inline,title}}
| groundbreaking_date =
| start_date = 2019
| est_completion = 2022
| completion_date = 2022
| opened_date = 2023
| inauguration_date =
| renovation_date =
| demolition_date =
| destruction_date =
| architectural = {{convert|569|m|ft|abbr=on}}
| tip =
| antenna_spire =
| roof = {{convert|569|m|ft|abbr=on}}
| top_floor =
| observatory =
| other_dimensions =
| floor_count = 105
| floor_area = {{convert|926,162|m|ft|abbr=on}}
| seating_type =
| seating_capacity =
| elevator_count =
| architect =
| architecture_firm =
| structural_engineer =
| services_engineer =
| civil_engineer =
| other_designers =
| quantity_surveyor =
| main_contractor =
| awards =
| designations =
| ren_architect =
| ren_firm =
| ren_str_engineer =
| ren_serv_engineer =
| ren_civ_engineer =
| ren_oth_designers =
| ren_qty_surveyor =
| ren_awards =
| parking =
| url =
| embedded =
| references =
| highest_region =
| highest_reflabel =
| highest_prev =
| highest_start =
| highest_end =
| highest_next =
}}

Hyundai Global Business Center (Korean: 현대차 글로벌 비즈니스 센터) is a 105-floor, {{Convert|569|m|ft|adj=on}} supertall skyscraper scheduled to begin construction in June 2019 in Samseong-dong, Gangnam District, Seoul.

History

Construction has begun in 2016 with the demolition of the existing KEPCO building in May 2016. The actual construction is scheduled to begin construction in early 2019 and to be completed in 2023.

The Hyundai Motor Group had previously planned to construct a 553-meter-tall building, but had to revise it to 569 meters due to some systemic issues.

The building complex will stand on a floor space of 926,162 meters to house the new headquarters building with 105 floors on a 560,443-square-meter space. The building will also host a 155,082-square-meter hotel and facility building with 35 floors, 67,768-square-meter concert hall with 9 floors, 68,895-square-meter convention center with 6 floors and 20,006-square-meter exhibition hall with 4 floors, according to the draft. An observatory will be located on 553 meters above the ground as originally planned. The concert hall with 2,000 seats will become the largest one in Gangnam. The Hyundai Motor Group will also build a sunken square connecting the complex to the underground of Yeongdong Bridge, public open space and public pedestrian passage, the group said in the draft.

References


}}{{SouthKorea-struct-stub}}{{Supertall proposed skyscrapers}}

2 : Buildings and structures under construction in South Korea|Skyscrapers in Seoul

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/13 1:54:01