词条 | Isinya–Singida High Voltage Power Line |
释义 |
| name = Isinya–Singida High Voltage Power Line | photo = | caption = | map = | country = Kenya and Tanzania | state = | province = | coordinates = {{coord|-1.9950|36.8000|type:landmark_region:KE|display=inline}} | direction = North to South | start = Isinya, Kenya | through = | finish = Singida, Tanzania | par = | owner = Government of Kenya & Government of Tanzania | partners = African Development Bank | operator = Kenya Electricity Transmission Company & Tanzania Electric Supply Company | cable_manufacturer = | cable_installer = | cable_layer = | substation_manufacturer = | substation_installer = | contractors = North China Power Engineering Company Limited | construction = | expected = 2019 | est = | decom = | type = | current_type = AC | length = | length_mi = 315.5 | tower_no = | capacity = | AC_voltage = 400kV | DC_voltage = | poles_no = | circuits_no = 2 }} The Isinya–Singida High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Isinya, Kenya to another high voltage substation at Singida, Tanzania.[1] LocationThe power line starts at Isinya, in Kajiado County, about {{convert|58|km|0}} south of Nairobi,[2] and runs in a southerly direction for approximately {{convert|98|km|0|}} to the border with Tanzania at Namanga.[3] At Namanga the power line crosses into Tanzania and follows a southerly direction to Arusha, a distance of about {{convert|95|km|0}} from Namanga.[4] From Arusha the line travels in a south-westerly direction for about {{convert|266|km|0}} to end at Singida.[5] According to the African Development Bank, {{convert|93.1|km|0}} of the line are located in Kenya and {{convert|414.5|km|0}} are located in Tanzania, for total length of {{convert|507.6|km|0}}.[1] OverviewAs far back as 2015, Kenya, Tanzania and Zambia began to explore the amount of electricity that can be moved along high voltage power lines linking the three countries. The objective was to exchange electricity between the Eastern Africa Power Pool to which both Kenya and Tanzania belong, and the Southern African Power Pool to which Tanzania ad Zambia belong. Each country would build and maintain the infrastructure within its borders.[6] Kenya and Tanzania sought a joint consultant to advise of the project.[7] A joint Environmental and Social Impact Assessment (ESIA) in both countries was carried out in 2014, funded by the African Development Bank (AfDB).[1] Construction in KenyaIn October 2017, Ketraco, the Kenyan electricity transportation monopoly awarded the construction contract for a 400kV substation at Isinya and the {{convert|96|km|0}} 400kV high tension line from Isinya to Namanga, to North China Power Engineering Company Limited (NCPE).[8] The work will be jointly financed by Kenyan government at US$4.25 million and the AfDB which will offer US$22.42 million in loans. Construction is expected to take 22 months.[11] Construction in TanzaniaThe work in Tanzania involves the construction of approximately {{convert|415|km|0}} of double circuit high tension power lines, from Namanga, through Arusha to Singida, a 400kV substation in Arusha and another 400kV substation in Singida. The work is budgeted at US$258.82 million.[9] The section between Singida and Babati was contracted to Kalpataru Power Transmission Limited of India. The Babati to Arusha section was contracted to Bouygues Energies & Services of France. Kenya is expected to establish a 400kV connection to Ethiopia, while Tanzania is expected to establish a similar 400kV connection to Zambia. This will enable seamless power sales between the four countries.[10] See also
References1. ^1 2 {{cite web |url=http://www.afdb.org/fileadmin/uploads/afdb/Documents/Environmental-and-Social-Assessments/Kenya-Tanzania_-_Power_Interconnection_Project_-_ESIA_Summary.pdf |date=July 2014 |access-date=19 October 2016 |publisher=African Development Bank | format=PDF |title=Multinational Kenya–Tanzania Power Interconnection Project: Country : Kenya and Tanzania: Project Number : P-Z1- FA0-052 |author=Asfaw S; Kulemeka N |display-authors=etal |location=Abidjan}} 2. ^{{cite web |url=http://distancecalculator.globefeed.com/Kenya_Distance_Result.asp?fromplace=Nairobi%2C%20Nairobi%20County%2C%20Kenya&toplace=Isinya%2C%20Kajiado%20County%2C%20Kenya%2C&dt1=ChIJp0lN2HIRLxgRTJKXslQCz_c&dt2=ChIJ64VW_xS5LxgR7rHmS4HGyhI |title=Distance between Nairobi, Nairobi County, Kenya and Isinya, Kajiado County, Kenya |access-date=19 October 2016 |date=19 October 2016 |publisher=Globefeed.com |author=Globefeed.com}} 3. ^{{cite web |access-date=19 October 2016 |date=19 October 2016 |url=http://distancecalculator.globefeed.com/Kenya_Distance_Result.asp?fromplace=Isinya%2C%20Kajiado%20County%2C%20Kenya&toplace=Namanga%2C%20Kajiado%20County%2C%20Kenya%2C&dt1=ChIJ64VW_xS5LxgR7rHmS4HGyhI&dt2=ChIJcY6qiMrwMBgR5rRlyc_MFp8 |title=Distance between Isinya, Kajiado County, Kenya and Namanga, Kajiado County, Kenya |last=Globefeed.com |publisher=Globefeed.com}} 4. ^{{cite web |access-date=19 October 2016 |date=19 October 2016 |publisher=Globefeed.com |url=http://distancecalculator.globefeed.com/Tanzania_Distance_Result.asp?fromplace=Namanga%20Bus%20Station%2C%20A%20104%2C%20Namanga%2C%20Kajiado%20County%2C%20Tanzania&toplace=Arusha%2C%20Arusha%20Region%2C%20Tanzania%2C&dt1=ChIJSws6XqvwMBgRHlNZgW_UWAI&dt2=ChIJg3M48ogcNxgRUnFJ7PcHGbw |author=Globefeed.com |title=Distance between Namanga Bus Station, A 104, Namanga, Kajiado County, Tanzania and Arusha, Arusha Region, Tanzania}} 5. ^{{cite web |url=http://distancecalculator.globefeed.com/Tanzania_Distance_Result.asp?fromplace=Arusha%2C%20Arusha%20Region%2C%20Tanzania&toplace=Singida%2C%20Singida%20Region%2C%20Tanzania%2C&dt1=ChIJg3M48ogcNxgRUnFJ7PcHGbw&dt2=ChIJ8ye2fVgkSxgR6lztDvNxtXk |title=Distance between Arusha, Arusha Region, Tanzania and Singida, Singida Region, Tanzania |publisher=Globefeed.com |date=19 October 2016 |access-date=19 October 2016 |author=Globefeed.com}} 6. ^{{cite web|publisher=Thomson-Reuters |author=Reuters |url=https://af.reuters.com/article/topNews/idAFKCN0SD1Q020151019 |title=Zambia, Tanzania, Kenya to assess power output on high-voltage power line |date=19 October 2015 |access-date=19 October 2016 |location=New York City}} 7. ^{{cite web | url=http://www.theeastafrican.co.ke/business/Kenya--Tanzania-seek-consultant-for-cross-border-power-lines/-/2560/2618012/-/81os7sz/-/index.html |title=Kenya, Tanzania seek consultant for cross-border power lines |newspaper=The EastAfrican Quoting Reuters | location=Nairobi |accessdate=19 October 2016 |date=9 February 2015}} 8. ^{{cite web |date=18 October 2016 |url=http://www.businessdailyafrica.com/Corporate-News/Chinese-firm-to-build-Sh2-6bn-power-line-to-Tanzania/539550-3421686-11q82s5z/index.html |accessdate=19 October 2016 |first=Neville |last=Otuki |location=Nairobi |title=Chinese firm to build KSh2.6 billion power line to Tanzania |newspaper=Business Daily Africa}} 9. ^1 {{cite web |accessdate=19 October 2016 |url=http://www.theeastafrican.co.ke/business/2560-3421526-70tk8bz/index.html |title=Work on Kenya-Tanzania powerline set to begin |location=Nairobi |newspaper=The EastAfrican | date=18 October 2016 |last=Anyanzwa |first=James}} 10. ^{{cite web |title=Tanzania-Kenya joint power project kicks into high gear |newspaper=The EastAfrican | url=https://www.theeastafrican.co.ke/business/Tanzania-Kenya-joint-electricity-project/2560-4974190-iuwd57/index.html |date=9 February 2019 |access-date=11 February 2019 |first=Bob |last=Karashani |location=Nairobi}} External links
6 : High-voltage transmission lines in Kenya|High-voltage transmission lines in Tanzania|Energy in Kenya|Energy in Tanzania|Energy infrastructure in Africa|Proposed energy infrastructure |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。