请输入您要查询的百科知识:

 

词条 Kentucky Route 3145
释义

  1. Route description

  2. History

  3. Major intersections

  4. References

  5. External links

{{Infobox road
| state = KY
| type = KY
| route = 3145
| maint = KYTC
| map =
| length_mi = 1.762
| length_ref = [1]
| established = July 6, 2017
| direction_a = South
| terminus_a = {{Jct|state=KY|I|65}} in rural east-central Warren County
| junction =
| direction_b = North
| terminus_b = {{Jct|state=KY|US|31W}} near Bowling Green
| counties = Warren
| previous_type = KY
| previous_route = 3144
| next_type = KY
| next_route = 3146
}}

Kentucky Route 3145 (KY 3145) is a rural-secondary state highway located entirely in Warren County in South Central Kentucky. The route serves as a connector between U.S. Route 31W and Interstate 65 (I-65) on the far east side of Bowling Green.

Route description

KY 3145 begins at exit 30 on I-65 and ends with an intersection with US 31W in the eastern outskirts of Bowling Green.[2]

History

Plans for a northern outer loop in the Bowling Green area were proposed in an attempt to create an alignment for a future I-66 corridor to run through the area via existing parkways. Those plans have long been cancelled due to protests in the Daniel Boone National Forest area to preserve karst formations in Laurel and Pulaski counties.

In 2004, a year after the Kentucky Transpark was first opened, now-U.S. Senator Mitch McConnell was able to get federal funding for improvements to U.S. Route 31W in northeast Warren County, and for the connector road and new interchange. Phase one of the project was to build the four-lane connector road from I-65 to US 68, which was completed and opened to traffic, with a designation of Kentucky Route 3145, on July 6, 2017.[3] Phase two was to extend the roadway, as a two-laner, to US 31W east of town to complete the project, which was completed on December 21, 2018. A total of $66.8 million was put into the interchange and new connector.[4]

KY 3145 is the second connector road between US 31W and I-65 in Bowling Green; the first one was KY 446, at exit 28. The interchange at exit 30 was built to ease congestion from the other exits and the two U.S. Routes on the east side of Bowling Green.[5] KY 3145 also serves commercial traffic to the interstate from the Kentucky Transpark, as well as the Industrial Park near the Warren East High School.

Major intersections

{{Jcttop|state=KY|length_ref=[1]|county=Warren}}{{KYint
|location=none
|lspan=3
|mile=0.000
|road={{Jct|state=KY|I|65|city1=Louisville|location2=Nashville}}
|notes=Southern terminus
}}{{KYint
|mile=1.762
|road={{Jct|state=KY|US|68|KY|80|name1=New Glasgow Road|city1=Bowling Green|city2=Oakland|city3=Glasgow|location4=Kentucky Transpark}}
|notes=
}}{{KYint
|mile=
|road={{Jct|state=KY|US|31W|name1=Louisville Road|location1=Mammoth Cave National Park|city2=Bowling Green}}
|notes=Northern terminus
}}

References

1. ^{{cite web |author = Kentucky Transportation Cabinet |url = http://apps.transportation.ky.gov/DMI_Reports/Official_MP_RL_params.aspx |title = Official DMI Route Log |publisher = Kentucky Transportation Cabinet |access-date = July 7, 2017}}
2. ^{{cite press release |first = Wes |last = Watt |date = July 2, 2017 |title = Traffic Impact Report for July 3 through July 7 |url = http://transportation.ky.gov/District-3/Documents/TIR%20July%203-7.pdf |publisher = Kentucky Transportation Cabinet |access-date = July 8, 2017 }}
3. ^{{Cite web |last = Sergent |first = Don |title = New I-65 exit improves access to Transpark |url = http://www.bgdailynews.com/news/new-i--interchange-will-improve-access-to-transpark/article_c429f168-8050-5d24-931d-4b04bdd49862.html |work = Bowling Green Daily News |date = July 5, 2017 |access-date = July 8, 2017 }}
4. ^{{Cite web |last = Doyle |first = Darren |title = Grand Opening of New I-65 Exit 30 Held Today at KY Transpark |url = http://www.edmonsonvoice.com/-news/grand-opening-of-new-i-65-exit-30-held-today-at-ky-transpark |work = Edmonson Voice |date = July 6, 2017 |access-date = July 8, 2017 }}
5. ^{{cite news |last = Sergent |first = Don |date = July 5, 2017 |title = Grand Opening Set For Thursday |work = Bowling Green Daily News |pages = 1A, 6A }}

External links

3 : State highways in Kentucky|Transportation in Warren County, Kentucky|Interstate 65

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/12 11:48:35