  1. History

  2. Stations

  3. See also

  4. References

  5. External links

{{Use dmy dates|date=March 2017}}{{Use Indian English|date=March 2017}}{{more citations needed|date=February 2017}}{{Infobox rail line
| name = {{background color|darkblue|{{font color|white|Kolkata Metro Line 6}}}}

| color = b82880
| logo =
| logo_width =
| image =
| image_width =
| image_alt =
| caption =
| type = Rapid transit
| system = Kolkata Metro
| status = Under Construction
| locale = {{flagicon|IND}} Kolkata, India
| start = Kavi Subhash (south)
| end = Jai Hind (north)
| stations = 24
| routes =
| daily_ridership = 500000 (projected)
| open = 2018 (5km)
| planopen =
| close =
| owner =
| operator = Kolkata Metro
| character = {{Unbulleted list|{{nowrap|Surface – 1}}|Underground – 1|Elevated – 21}}
| depot =
| stock =
| linelength = {{convert|29.10|km|mi}}
| tracklength =
| tracks = 2
| gauge = {{RailGauge|1676mm}} Broad gauge
| electrification = 750 V DC[1] using third rail
| speed = 80 km/h (designed)
| website = KMRC
| elevation =
}}

Line 6 of the Kolkata Metro is an under-construction rapid transit line that will connect Garia to the Netaji Subhas Chandra Bose International Airport.

History

A connection between New Garia and the Airport (29.1 km) via E M Bypass, Saltlake and Rajarhat has started; it will help to reduce travel time between the southern fringes of Kolkata to Netaji Subhas Chandra Bose International Airport. The work on this New Garia-Airport line was inaugurated by Mamata Banerjee on 7 February 2011 with a project deadline of six years.[2]

The link between Kavi Subhas (New Garia) and the airport, to be set up at a cost of Rs4 billion, will have 24 stations with the terminal Airport station being an underground one.

Work for construction of the terminal station at New Garia for the 32-km Kavi Subhash-Airport (via Rajarhat) Metro project finally resumed on 14 February 2017 with Rail Vikas Nigam Ltd (RVNL) demarcating the plot they require for the purpose.

The 5 km stretch from New Garia to Ruby Hospital was expected to start from 2018.[3] On 12 February 2018 Mr Ajay Vijayvargiya, General Manager Metro Railways announced a delay in inauguration of New Garia to Ruby stretch. It is now expected to be inaugurated in early 2019.[4]

Stations

The stations, as declared of now, will be named after eminent personalities.[2]

Line 6
No.Station NameLocationOpeningConnectionsLayoutCoordinatesNotes
EnglishBengali
1Jai Hindজয় হিন্দNetaji Subhash Chandra Bose International AirportUnder constructionOrange; font-size:80%}} Line 4 (Under construction); Biman Bandar railway stationUndergroundAlso known as Biman Bhandar
2Kazi Nazrul Islam Avenueকাজী নজরূল ইসলাম সরনীKaikhaliUnder constructionElevatedAlso known as VIP Road
3New Townনিউ টাউনNewtownUnder constructionElevatedAlso known as Chinar Park
4TitumirতিতুমীরNewtownUnder constructionElevated
5Sub CBD 2সাব সিবিডি ২NewtownUnder constructionElevatedAlso known as Akankha 5-point crossing
6Convention Centreকনভেনশন সেন্টারNewtownUnder constructionElevatedAlso known as Nawabpur
7Prakriti Tirthaপ্রকৃতি তীর্থNewtownUnder ConstructionElevatedAlso known as Eco Park
8Baanijya Tirthaবাণিজ্য তীর্থNewtownUnder constructionElevatedAlso known as Newtown CBD/Kalashetra
9Rabindra Tirthaরবীন্দ্র তীর্থNewtownUnder constructionElevatedAlso known as Narkelbagan
10Vivek Tirthaবিবেক তীর্থNewtownUnder constructionElevatedAlso known as Sub CBD 1
11Nazrul Tirthaনজরুল তীর্থNewtownUnder constructionElevatedAlso known as Newtown Bus Stand
12Bidhannagar Limitবিধাননগর লিমিটNewtownUnder constructionElevatedAlso known as Technopolis
13Salt Lake Sector Vসল্ট লেক সেক্টর ৫Salt Lake Sector VUnder constructionRED; font-size:80%}} Line 2 (Under construction)Elevated
14Nicco Parkনিক্কো পার্কSalt Lake Sector VUnder constructionElevated
15Gour Kishore Ghoshগৌর কিশোর ঘোষSalt Lake Sector VUnder constructionElevatedAlso known as Chingrighata
16Varun Senguptaবরুন সেনগুপ্তEM BypassUnder constructionElevatedAlso known as Barataman Bhawan
17Ritwik Ghatakঋত্বিক ঘটকUttar Panchannagram KolkataUnder constructionElevatedAlso known as Science City
18VIP Bazaarভি আই পি বাজারVIP BazaarUnder constructionElevated
19Hemanta Mukherjeeহেমন্ত মুখোপাধ্যায় Ruby/Desun HospitalUnder constructionElevatedAlso known as Kasba Golpark
20Kavi Sukantaকবি সুকান্তKalikapurUnder constructionElevatedAlso known as Kalikapur
21Jyotirindra Nath Nandiযতীন্দ্র নাথ নন্দীMukundapurUnder constructionElevatedAlso known as Mukundapur
22Satyajit Rayসত্যজিৎ রায়Bagha Jatin/Peerless HospitalUnder constructionElevatedAlso known as Bagha Jatin
23Kavi Subhashকবি সুভাষNew Garia7 October 2010BLUE; font-size:80%}} Line 1 and {{rint|rail}} New Garia railway station (Eastern Suburban Railways)At GradeAlso known as New Garia

See also

  • Kolkata Metro
  • List of Kolkata metro stations
  • Kolkata Metro Rolling Stock
  • List of rapid transit systems
  • Trams in Kolkata
  • Kolkata Lightrail
  • Kolkata Monorail
  • Kolkata Suburban Railway

References

1. ^ 
2. ^{{cite news| url=http://www.telegraphindia.com/1110208/jsp/calcutta/story_13549408.jsp | location=Calcutta, India | work=The Telegraph | title=Rail set to take over East-West | date=8 February 2011}}
3. ^{{cite news|title=Metro sets June 2018 date for New Garia-Ruby line|url=https://timesofindia.indiatimes.com/city/kolkata/metro-sets-june-2018-date-for-new-garia-ruby-line/articleshow/59963674.cms|newspaper=The Times of India}}
4. ^{{cite news|title=Metro to connect Sector V to Salt Lake Stadium soon|url=http://www.millenniumpost.in/kolkata/metro-to-connect-sector-v-to-salt-lake-stadium-soon-284718|newspaper=Millennium Post}}

External links

{{Kolkata Metro}}{{Kolkata topics}}{{Rapid transit in India}}

3 : Kolkata Metro lines|Kolkata Metro|750 V DC railway electrification

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/27 21:27:49