词条 | Kolkata Metro Line 6 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
释义 |
| name = {{background color|darkblue|{{font color|white|Kolkata Metro Line 6}}}} | color = b82880 | logo = | logo_width = | image = | image_width = | image_alt = | caption = | type = Rapid transit | system = Kolkata Metro | status = Under Construction | locale = {{flagicon|IND}} Kolkata, India | start = Kavi Subhash (south) | end = Jai Hind (north) | stations = 24 | routes = | daily_ridership = 500000 (projected) | open = 2018 (5km) | planopen = | close = | owner = | operator = Kolkata Metro | character = {{Unbulleted list|{{nowrap|Surface – 1}}|Underground – 1|Elevated – 21}} | depot = | stock = | linelength = {{convert|29.10|km|mi}} | tracklength = | tracks = 2 | gauge = {{RailGauge|1676mm}} Broad gauge | electrification = 750 V DC[1] using third rail | speed = 80 km/h (designed) | website = KMRC | elevation = }} Line 6 of the Kolkata Metro is an under-construction rapid transit line that will connect Garia to the Netaji Subhas Chandra Bose International Airport. HistoryA connection between New Garia and the Airport (29.1 km) via E M Bypass, Saltlake and Rajarhat has started; it will help to reduce travel time between the southern fringes of Kolkata to Netaji Subhas Chandra Bose International Airport. The work on this New Garia-Airport line was inaugurated by Mamata Banerjee on 7 February 2011 with a project deadline of six years.[2] The link between Kavi Subhas (New Garia) and the airport, to be set up at a cost of Rs4 billion, will have 24 stations with the terminal Airport station being an underground one. Work for construction of the terminal station at New Garia for the 32-km Kavi Subhash-Airport (via Rajarhat) Metro project finally resumed on 14 February 2017 with Rail Vikas Nigam Ltd (RVNL) demarcating the plot they require for the purpose. The 5 km stretch from New Garia to Ruby Hospital was expected to start from 2018.[3] On 12 February 2018 Mr Ajay Vijayvargiya, General Manager Metro Railways announced a delay in inauguration of New Garia to Ruby stretch. It is now expected to be inaugurated in early 2019.[4] StationsThe stations, as declared of now, will be named after eminent personalities.[2]
See also
References1. ^ 2. ^1 {{cite news| url=http://www.telegraphindia.com/1110208/jsp/calcutta/story_13549408.jsp | location=Calcutta, India | work=The Telegraph | title=Rail set to take over East-West | date=8 February 2011}} 3. ^{{cite news|title=Metro sets June 2018 date for New Garia-Ruby line|url=https://timesofindia.indiatimes.com/city/kolkata/metro-sets-june-2018-date-for-new-garia-ruby-line/articleshow/59963674.cms|newspaper=The Times of India}} 4. ^{{cite news|title=Metro to connect Sector V to Salt Lake Stadium soon|url=http://www.millenniumpost.in/kolkata/metro-to-connect-sector-v-to-salt-lake-stadium-soon-284718|newspaper=Millennium Post}} External links{{Kolkata Metro}}{{Kolkata topics}}{{Rapid transit in India}} 3 : Kolkata Metro lines|Kolkata Metro|750 V DC railway electrification |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。