词条 | Line 3, Hanoi Metro |
释义 |
| box_width = 300px | name = Văn Miếu Line Line 3: Nhổn - Hà Nội Station | native_name = Tuyến Văn Miếu (số 3 Nhổn - ga Hà Nội) | color = 079312 | logo = {{huge|{{RouteBox|V|Line 3, Hanoi Metro|green}}}} | logo_width = 50px | logo_alt = | image = Hanoi_metro_L3_construction.jpg | image_width = 300px | image_alt = | caption = Viaduct pillar on Line 3 | type = Rapid transit | system = Hanoi Metro | status = Under construction | stations = Phase 1: 12 | linenumber = {{RouteBox|3|Line 3, Hanoi Metro|green|white|bold=}} | start = {{stn|Nhon}} | end = Hanoi Railway Station | routes = | depot = Nhon Depot | planopen = {{Start date and age|2023|||df=y}} | open = | close = | owner = Vietnam Railways | operator = Hanoi Metro Company (HMC) | stock = 10 4-carriage Alstom Metropolis trains (40 carriages) [1] | linelength = Phase 1: {{convert|12.5|km|mi|abbr=on}} | gauge = {{RailGauge|sg|al=on}} | conductionsystem = | daily_ridership = | ridership2 = 8,600 passengers/hour/direction | electrification = Third rail, 750 V DC | speed = 80 km/hour maximum | website = {{URL|hanoimetro.net.vn}} | map = | map_state = }} Line 3, Hanoi Metro (Nhon - Hanoi Station section), also known as Văn Miếu Line, is one of the under-construction mass transit railway line in the Hanoi Metro network, will be the second line to be used in the metro network. This line is invested by Hanoi Metropolitan Railway Management Board and divided into two phases. Phase 1 is 12.5 km long and consists of 12 stations in total,[2] with 8.5 km elevated and 4 km underground, stretching from the city's western suburbs - Nhon - to the city center on Tran Hung Dao Street near Hanoi Railway Station. Its services are scheduled for completion in 2022 to 2023. 20% of Hanoi's people in 6 districts Ba Dinh, Cau Giay, Dong Da, Hoan Kiem, Nam Từ Liêm and Bắc Từ Liêm can benefit from this line. BudgetBeside 276 million euros from the Hanoi city's budget, the project also receives 726 million euros from the four donors - the French government (DGT), Agence française de développement (AFD), Asian Development Bank (ADB),[3] and European Investment Bank (EIB). Construction progressImplementation of the project is delayed by four years compared to the original schedule with completion expected in 2021. As of March 2017, the project has achieved 30% physical progress over the elapsed project life of 9 years. However, due to land clearance issues, the project completion is expected to be delayed to 2023.[4] RouteLine 3: Nhon - Hanoi Station section starts from Nhon - to National Highway 32 - Cau Dien - Mai Dich - Ring road 3 intersection - Cau Giay (ring road 2 intersection) - Kim Ma - Giang Vo - Cat Linh - Quoc Tu Giam and ends at Tran Hung Dao Street, in front of Hanoi Station. Stations12 stations including 8 elevated stations (Nhon, Minh Khai, Phu Dien, Cau Dien, Le Duc Tho, Vietnam National University, Chua Ha, Cau Giay) and 4 underground stations (Kim Ma, Cat Linh, Van Mieu, Hanoi Station), with concourse level, elevators and lifts. The railway platform is 109 m long. Design1,435mm double-track European standard type-B rail; the trains will be 2.75–3 m wide, 20 m long and 3.69 m high. The capacity of each 4-wagon train is 916 passengers maximum, with a density of 6 passengers per meter square. The underground section, dug by Tunnel Boring Machine, consists of 2 single tubes. Social and environmental impacts
See also{{Portal|Trains|Vietnam|Transport}}
References1. ^[https://www.globalrailnews.com/2017/01/17/french-consortium-to-deliver-hanoi-metro-line-3/ French consortium to deliver Hanoi Metro Line 3] 2. ^{{Cite web|url=https://www.adb.org/projects/40080-013/main|title=Ha Noi Metro Rail System Project (Line 3: Nhon-Ha Noi Station Section)|last=|first=|date=|website=|archive-url=|archive-date=|dead-url=|access-date=}} 3. ^{{Cite web|url=https://www.adb.org/projects/40080-025/main|title=Financing of metro line 3: Nhon - Hanoi Station section|last=|first=|date=|website=|archive-url=|archive-date=|dead-url=|access-date=}} 4. ^[https://e.vnexpress.net/news/news/sluggish-hanoi-metro-defers-line-3-launch-to-2023-3760055.html Sluggish Hanoi metro defers Line 3 launch to 2023] External links{{commonscat-inline|Hanoi Metro}}{{Vietnam rapid transit}}{{Transport in Vietnam}}{{Urban Rail Transit in ASEAN}} 3 : Rapid transit in Vietnam|Hanoi Metro|Proposed public transport in Asia |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。