The Prime Minister Narendra Modi inaugurated the Hyderabad Metro on 29 November 2017 by opening a 30km stretch from Miyapur to Nagole and hence making it the longest stretch commissioned in the first phase among all metros in India.[2][3] It has since been expanded to around {{convert|56.5|km|mi|abbr=on}} of route length.[4] The system is operated by the Hyderabad Metro Rail Limited (HMRL).
Each line of the Hyderabad Metro is identified by a specific colour. The system uses rolling stock of standard gauge and has the elevated lines. The Metro is open from about 06:30 to 22:30 hours with trains operating at a frequency of 3.5 to 6.5 minutes with CBTC and integrated telecommunication and supervision systems that allows an unattended train operation (UTO).[4] {{As of|2018|October}}, the Hyderabad Metro has an average daily ridership of around 200,000 commuters.[5] The Red Line connects Miyapur to the north and LB Nagar to the south, while the Blue Line connects Ameerpet to the west and Nagole to the east.
# | Station Name (English) | Station Name (Telugu) | Line | Opened | Layout | Notes | Ref. |
---|
1 | Ameerpet * | {{lang|te|అమీర్పేట్}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated | - Interchange of Train between Blue Line and Red Line
| [3][4][9] |
---|
{{color box|Red|Red Line|White}} |
2 | Assembly | te|అసెంబ్లీ}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated |
---|
3 | Begumpet †† | te|బేగంపేట్}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated- Transfer station for Begumpet railway station
- Transfer station for Airport Shuttle
|
---|
4 | Bharat Nagar †† | te|భరత్ నగర్}} | {{color box|Red|Red Line|White}} | 29 November 2017 | Elevated- Transfer station for Bharat Nagar railway station
|
---|
5 | Chaitanyapuri | te|చైతన్యపురి}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated |
---|
6 | Dilsukhnagar | te|దిల్సుఖ్నగర్}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated |
---|
7 | Dr. B. R. Ambedkar Balanagar | te|డా. బి. ఆర్. అంబేడ్కర్ బాలానగర్}} | {{color box|Red|Red Line|White}} | 29 November 2017 | Elevated |
---|
8 | Durgam Cheruvu | te|దుర్గం చెరువు}} | {{color box|Blue|Blue Line|White}} | 20 March 2019 | Elevated |
---|
9 | Erragadda | te|ఎఱ్ఱగడ్డ}} | {{color box|Red|Red Line|White}} | 29 November 2017 | Elevated |
---|
10 | ESI Hospital | te|ఇ.స్.ఐ. హాస్పిటల్}} | {{color box|Red|Red Line|White}} | 29 November 2017 | Elevated |
---|
11 | Gandhi Bhavan | te|గాంధీ భవన్}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated |
---|
12 | Habsiguda | te|హబ్సిగూడ}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated |
---|
13 | HITEC City †† | te|హైటెక్ సిటి}} | {{color box|Blue|Blue Line|White}} | 20 March 2019 | Elevated- Transfer station for Airport Shuttle
| [6] |
---|
14 | Irrum Manzil | te|ఇర్రమంజిల్}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated |
---|
15 | JNTU College †† | te|జె.ఎన్.టి.యు. కాలేజ్}} | {{color box|Red|Red Line|White}} | 29 November 2017 | Elevated- Transfer station for Airport Shuttle
|
---|
16 | Khairatabad †† | te|ఖైరతాబాద్}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated- Transfer station for Khairatabad railway station
|
---|
17 | KPHB Colony | te|కె.పి.హెచ్.బి. కాలని}} | {{color box|Red|Red Line|White}} | 29 November 2017 | Elevated |
---|
18 | Kukatpally | te|కూకట్పల్లి}} | {{color box|Red|Red Line|White}} | 29 November 2017 | Elevated |
---|
19 | L B Nagar #* | te|ఎల్.బి. నగర్}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated- Terminal station for Red Line
- Transfer station for Airport Shuttle
| [7] |
---|
20 | Lakdi-ka-pul | te|లక్డీ-కా-పూల్}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated |
---|
21 | Madhura Nagar | te|మధురా నగర్}} | {{color box|Blue|Blue Line|White}} | 20 March 2019 | Elevated |
---|
22 | Malakpet †† | te|మలక్పేట్}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated- Transfer station for Malakpet railway station
|
---|
23 | Mettuguda | te|మెట్టుగూడ}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated |
---|
24 | MG Bus Station †† | te|ఎం.జి. బస్ స్టేషన్}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated- Transfer station for Mahatma Gandhi bus station
|
---|
25 | Miyapur † | te|మియాపూర్}} | {{color box|Red|Red Line|White}} | 29 November 2017 | Elevated- Terminal station for Red Line
| [3] |
---|
26 | Moosapet | te|మూసాపేట్}} | {{color box|Red|Red Line|White}} | 29 November 2017 | Elevated |
---|
27 | Musarambagh | te|ముసరంబాగ్}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated |
---|
28 | Nagole † | te|నాగోల్}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated- Transfer station for Blue Line
| [3] |
---|
29 | Nampally †† | te|నాంపల్లి}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated- Transfer station for Hyderabad Deccan railway station
|
---|
30 | New Market | te|న్యూ మార్కెట్}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated |
---|
31 | NGRI | te|ఎన్ జి ఆర్ ఐ}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated |
---|
32 | Osmania Medical College | te|ఉస్మానియ మెడికల్ కాలేజీ}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated |
---|
33 | Parade Ground †† | te|పరేడ్ గ్రౌండ్}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated- Transfer station for Jubilee Bus Station
|
---|
34 | Paradise | te|ప్యారడైజ్}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated |
---|
35 | Peddamma Gudi | te|పెద్దమ్మ గుడి}} | {{color box|Blue|Blue Line|White}} | 30 March 2019 | Elevated | [8] |
---|
36 | Prakash Nagar | te|ప్రకాశ్నగర్}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated |
---|
37 | Punjagutta | te|పంజాగుట్ట}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated |
---|
38 | Rasoolpura | te|రసూల్పుర}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated |
---|
39 | Road No 5 Jubilee Hills | te|రోడ్ నం 5 జూబిలీ హిల్స్}} | {{color box|Blue|Blue Line|White}} | 20 March 2019 | Elevated |
---|
40 | S.R. Nagar | te|ఎస్.ఆర్. నగర్}} | {{color box|Red|Red Line|White}} | 29 November 2017 | Elevated |
---|
41 | Secunderabad East †† | te|సికింద్రాబాద్ ఈస్ట్}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated- Transfer station for Jubilee Bus Station
- Transfer station for Secunderabad railway station
|
---|
42 | Stadium | te|స్టేడియం}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated |
---|
43 | Tarnaka †† | te|తార్నాక}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated- Transfer station for Airport Shuttle
|
---|
44 | Uppal †† | te|ఉప్పల్}} | {{color box|Blue|Blue Line|White}} | 29 November 2017 | Elevated- Transfer station for Airport Shuttle
|
---|
45 | Victoria Memorial | te|విక్టోరియా మెమోరియల్}} | {{color box|Red|Red Line|White}} | 24 September 2018 | Elevated |
---|
46 | Yusufguda | te|యూసుఫ్గూడ}} | {{color box|Blue|Blue Line|White}} | 20 March 2019 | Elevated |
---|
|
1. ^{{cite news|last=Iyer|first=Swathyr|url=https://timesofindia.indiatimes.com/city/hyderabad/tryst-with-metro-history-as-2nd-longest-corridor-opens/articleshow/65942656.cms|title=Tryst with Metro history as 2nd longest corridor opens|website=The Times of India|date=25 September 2018|access-date=29 January 2019}}
2. ^{{cite web|url=http://timesofindia.indiatimes.com/city/hyderabad/metro-rail-to-get-lease-of-life-in-november/articleshow/60068066.cms|title=Metro Rail to get lease of life in November|website=The Times of India|agency=Press Trust of India|date=28 November 2017|access-date=29 January 2019}}
3. ^1 2 3 {{cite news|last=Ch.|first=Sushil Rao|url=https://timesofindia.indiatimes.com/city/hyderabad/pm-modi-inaugurates-hyderabad-metro-rail/articleshow/61833627.cms|title=PM Modi inaugurates Hyderabad Metro Rail|website=The Times of India|date=15 August 2017|access-date=29 January 2019}}
4. ^{{cite news|last=V.|first=Geetanath|url=https://www.thehindu.com/news/cities/Hyderabad/driver-less-technology-on-metro-rail/article20556436.ece|title=Driver-less technology on Hyderabad metro rail|website=The Hindu|date=19 November 2017|access-date=29 January 2019}}
5. ^{{cite news|last=BV.|first=Mahalakshmi|url=https://www.financialexpress.com/infrastructure/railways/hyderabad-metro-the-largest-ppp-metro-project-has-become-a-big-success/1349078/|title=Hyderabad Metro, the largest PPP metro project, has become a big success|website=Financial Express|date=15 October 2018|access-date=29 January 2019}}
6. ^1 2 {{cite news|last=Devulapally|first=Indrajeet|url=https://telanganatoday.com/metro-corridor-launched-hyderabad|title=Hyderabad Metro logs into IT corridor|website=Telangana Today|date=21 March 2019|accessdate=27 March 2019}}
7. ^1 {{cite news|last=V.|first=Geetanath|url=https://www.thehindu.com/news/cities/Hyderabad/hyderabad-metro-rail-is-now-second-largest-metro-network-in-country/article25029210.ece|title=Hyderabad Metro Rail is now second largest metro network in country|website=The Hindu|date=24 September 2018|accessdate=30 March 2019}}
8. ^{{cite news|last=|first=|url=https://telanganatoday.com/hyderabad-peddammagudi-station-opened-for-metro-passengers|title=Hyderabad: Peddammagudi station opened for Metro passengers|website=Telangana Today|date=30 March 2019|accessdate=30 March 2019}}