请输入您要查询的百科知识:

 

词条 List of O-Train stations
释义

  1. Current stations

  2. Under construction

  3. Planned stations

  4. References

  5. External links

The O-Train is a light-rail transit (LRT) system in Ottawa, Ontario, Canada operated by OC Transpo. The only operating line is the Trillium Line ({{lang-fr|Ligne Trillium}}); a diesel light-rail transit (DLRT) service. The present line runs north-south on a railway line, from Bayview to Greenboro, a distance of approximately {{convert|8|km|mi|0}} and consisting of 5 stations. It is isolated from road traffic, but shared with other trains; after operating hours the track has been infrequently used by Ottawa Central for freight service to the National Research Council.

The Confederation Line, an electric light rail transit service, will open in 2019 with 13 stations. Stage 2 will see the O-Train system expanded south, east, and west, with 24 new stations added to the existing lines.

Current stations

Line Stations Track Ridership
(Q4 2017 daily)
ottawa|2}} Trillium Line5 8|km|abbr=on}}16,900
StationLineOpenedGradePlatformsTransfers
Bayviewottawa|1}} -->{{rint|ottawa|2}} 2001 Underpass Single bus|rapid}} Transitway
{{rint|bus|1}} OC Transpo buses
Carlingottawa|2}} 2001 Trench Single bus|1}} OC Transpo buses
Carletonottawa|2}} 2001 Surface Side bus|1}} OC Transpo buses
Mooney's Bayottawa|2}} 2001 Surface Single bus|1}} OC Transpo buses
Greenboroottawa|2}} 2001 Surface Single bus|rapid}} Transitway
{{rint|bus|1}} OC Transpo buses

Under construction

The Confederation Line is a light rail transit (LRT) line under construction in Ottawa, Ontario, Canada and will consist of 13 stations including 3 new underground stations (St Laurent was an existing underground station that was converted). The Confederation Line will be part of the O-Train network operated by OC Transpo along with the existing diesel-powered Trillium Line.[1]

Line Stations Track
ottawa|1}} Confederation Line13 12.5|km|abbr=on}}
StationLineOpeningGradePlatformsTransfers
Tunney's Pastureottawa|1}} 2019 Trench Side bus|rapid}} Transitway
{{rint|bus|1}} OC Transpo buses
Pimisiottawa|1}} 2019 Trench Centre bus|1}} OC Transpo buses
Lyonottawa|1}} 2019 Underground Side bus|1}} OC Transpo buses
Parliamentottawa|1}} 2019 Underground Side bus|1}} OC Transpo buses
Rideauottawa|1}} 2019 Underground Side bus|1}} OC Transpo buses
{{rint|bus|1}} Société de transport de l'Outaouais
uOttawaottawa|1}} 2019 Surface Side None
Leesottawa|1}} 2019 Trench Side bus|1}} OC Transpo buses
Hurdmanottawa|1}} 2019 Elevated Side bus|rapid}} Transitway
{{rint|bus|1}} OC Transpo buses
Tremblayottawa|1}} 2019 Underpass Side ca|via}} Ottawa station
St. Laurentottawa|1}} 2019 Underground Side bus|1}} OC Transpo buses
Cyrvilleottawa|1}} 2019 Underpass Centre None
Blairottawa|1}} 2019 Surface Centre bus|rapid}} Transitway
{{rint|bus|1}} OC Transpo buses

Planned stations

Stage 2 is a planned extension to the O-Train network which will add an additional 8 stations to the Trillium Line and 16 to the Confederation Line.

The city has also begun planning future expansions including an extension to Kanata which could see up to 8 stations added.[2] A study to extend the line into Barrhaven is also underway.[3]

StationLineOpeningGrade
Gladstoneottawa|2}} 2022 Trench
Walkleyottawa|2}}2022Surface
South Keysottawa|2}}2022Surface
Uplandsottawa|2}}2022Elevated
Airportottawa|2}}2022Elevated
Leitrimottawa|2}}2022Surface
Bowesvilleottawa|2}}2022Surface
Limebankottawa|2}}2022Surface
Trimottawa|1}} 2024 Surface
Place d'Orléansottawa|1}} 2024 Surface
Orléansottawa|1}} 2024 Surface
Jeanne d'Arcottawa|1}} 2024 Surface
Montrealottawa|1}} 2024 Surface
Westboroottawa|1}} 2025 Trench
Dominionottawa|1}} 2025 Surface
Clearyottawa|1}} 2025 Underground
New Orchardottawa|1}} 2025 Underground
Lincoln Fieldsottawa|1}} 2025 Surface
Irisottawa|1}} 2025 Surface
Algonquin[4]ottawa|1}} 2025 Underground
Queensviewottawa|1}} 2025 Surface
Pinecrestottawa|1}} 2025 Surface
Bayshoreottawa|1}} 2025 Surface
Moodieottawa|1}} 2025 Surface

References

1. ^{{cite web |url=http://metronews.ca/news/ottawa/1157426/transit-commission-on-board-with-new-o-train-name/ |title=Transit commission on board with new O-Train name |author= |date=September 17, 2014 |work= |publisher=Metro News |quote=O-Train passengers could be boarding the expanded and newly named Trillium Line by mid-November |accessdate=December 2014}}
2. ^{{Cite web|url=https://ottawa.ca/en/city-hall/public-engagement/projects/kanata-light-rail-transit-planning-and-environmental-assessment-study|title=Kanata Light Rail Transit Planning and Environmental Assessment Study|last=Planning|first=Infrastructure & Economic Development Dept|date=2019-01-04|website=ottawa.ca|language=en|access-date=2019-02-01}}
3. ^{{Cite web|url=https://ottawa.ca/en/news/barrhaven-light-rail-extension-study-and-booth-street-cycling-infrastructure-moving-forward|title=Barrhaven light-rail extension study and Booth Street cycling infrastructure moving forward|last=Dept|first=Service Innovation & Performance|date=2018-10-03|website=ottawa.ca|language=en|access-date=2019-02-01}}
4. ^{{Cite web|url=https://twitter.com/KatePorterCBC/status/1090637765341896705|title=And, what will the names be on those future LRT Stage 2 stations? Watson says Baseline station would be renamed Algonquin Station for @AlgonquinColleg. #ottcity|last=Porter|first=Kate|date=2019-01-30|website=@KatePorterCBC|language=en|access-date=2019-01-31}}

External links

  • O-Train and Transitway system map
{{OC Transpo Rapid Transit}}{{DEFAULTSORT:O-Train stations}}

3 : Canada transport-related lists|Ottawa-related lists|O-Train stations

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/22 9:28:01