词条 | List of O-Train stations | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
释义 |
The O-Train is a light-rail transit (LRT) system in Ottawa, Ontario, Canada operated by OC Transpo. The only operating line is the Trillium Line ({{lang-fr|Ligne Trillium}}); a diesel light-rail transit (DLRT) service. The present line runs north-south on a railway line, from Bayview to Greenboro, a distance of approximately {{convert|8|km|mi|0}} and consisting of 5 stations. It is isolated from road traffic, but shared with other trains; after operating hours the track has been infrequently used by Ottawa Central for freight service to the National Research Council. The Confederation Line, an electric light rail transit service, will open in 2019 with 13 stations. Stage 2 will see the O-Train system expanded south, east, and west, with 24 new stations added to the existing lines. Current stations
Under constructionThe Confederation Line is a light rail transit (LRT) line under construction in Ottawa, Ontario, Canada and will consist of 13 stations including 3 new underground stations (St Laurent was an existing underground station that was converted). The Confederation Line will be part of the O-Train network operated by OC Transpo along with the existing diesel-powered Trillium Line.[1]
Planned stationsStage 2 is a planned extension to the O-Train network which will add an additional 8 stations to the Trillium Line and 16 to the Confederation Line. The city has also begun planning future expansions including an extension to Kanata which could see up to 8 stations added.[2] A study to extend the line into Barrhaven is also underway.[3]
References1. ^{{cite web |url=http://metronews.ca/news/ottawa/1157426/transit-commission-on-board-with-new-o-train-name/ |title=Transit commission on board with new O-Train name |author= |date=September 17, 2014 |work= |publisher=Metro News |quote=O-Train passengers could be boarding the expanded and newly named Trillium Line by mid-November |accessdate=December 2014}} 2. ^{{Cite web|url=https://ottawa.ca/en/city-hall/public-engagement/projects/kanata-light-rail-transit-planning-and-environmental-assessment-study|title=Kanata Light Rail Transit Planning and Environmental Assessment Study|last=Planning|first=Infrastructure & Economic Development Dept|date=2019-01-04|website=ottawa.ca|language=en|access-date=2019-02-01}} 3. ^{{Cite web|url=https://ottawa.ca/en/news/barrhaven-light-rail-extension-study-and-booth-street-cycling-infrastructure-moving-forward|title=Barrhaven light-rail extension study and Booth Street cycling infrastructure moving forward|last=Dept|first=Service Innovation & Performance|date=2018-10-03|website=ottawa.ca|language=en|access-date=2019-02-01}} 4. ^{{Cite web|url=https://twitter.com/KatePorterCBC/status/1090637765341896705|title=And, what will the names be on those future LRT Stage 2 stations? Watson says Baseline station would be renamed Algonquin Station for @AlgonquinColleg. #ottcity|last=Porter|first=Kate|date=2019-01-30|website=@KatePorterCBC|language=en|access-date=2019-01-31}} External links
3 : Canada transport-related lists|Ottawa-related lists|O-Train stations |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。