词条 | North Negros BioPower |
释义 |
| name = North Negros BioPower | name_official = | image = | image_caption = | location_map = Philippines | coordinates = {{coord|10|56|41|N|123|10|2|E|region:PH_type:landmark|display=inline,title}} | country = Philippines | location = Manapla, Negros Occidental | status = P | construction_began = | commissioned = 4th quarter 2018 (planned) | decommissioned = | cost = | owner = | operator = | th_fuel_primary = cane trash with some grassy and woody energy crop plants | th_fuel_tertiary = | ps_units_manu_model = | th_cogeneration = | th_combined_cycle = | ps_electrical_capacity = 24.99 MW planned | ps_electrical_cap_fac = | website = {{URL|www.snbiopower.com}} | extra = }} North Negros BioPower is a planned biomass-fired power station in Manapla, Negros Occidental in the Philippines. When commissioned in the 4th quarter 2018 it will be among the biggest biomass power stations in the Philippines and will have a generating capacity of 24.99 megawatts, enough electricity to provide 265,000 people in the region’s urban centres and rural areas on the island of Negros.[1] The power plant is a cooperation between ThomasLloyd CTI Asia Holdings Pte and Bronzeoak Philippines. General Contractor is Wuxi Huaguang Electric Power Engineering. The plant will be primary fed with cane trash with some grassy and woody energy crop plants. The feedstock utilisation will be 220,000 tonnes per year with a local feedstock availability of 2.1 million tonnes per year within a 50 km-radius catchment area. The plant will be connected to an existing 138 kV substation, 12 km away when operational. The power plant is expected to create 675 new jobs in the plant and 2,500 jobs in feedstock production and collection.[2] The facility was initially planned to be constructed in 2014 for commissioning in 2017 with the cost of about $114 million.[3] The planned schedule for completion was moved to the third quarter of 2016.[1] The planned commissioned date was moved once again to the fourth quarter of 2018 with construction of the facility set on the second quarter of 2017.[2] See also
References1. ^1 {{cite news|title=The Philippines takes center stage at the ThomasLloyd Clean Teach Congress in Frankfurt|url=http://www.philippine-embassy.de/bln/index.php?option=com_content&task=view&id=1228&Itemid=74|accessdate=7 April 2016|publisher=Embassy of the Republic of the Philippines in Germany|date=3 February 2014}} 2. ^1 {{cite web|title=North Negros Biopower|url=http://www.thomas-lloyd.com/en/projects/biomass/NORTH-NEGROS-BIOPOWER|publisher=ThomasLloyd Group|accessdate=7 April 2016}} 3. ^{{cite news|last1=Valencia|first1=Czeriza|title=Bioenergy developer set to complete 5 clean projects|url=http://www.philstar.com/business/2013/10/08/1242606/bioenergy-developer-set-complete-5-clean-projects|accessdate=7 April 2016|publisher=The Philippine Star|date=8 October 2013}} External links
3 : Buildings and structures in Negros Occidental|Biofuel power stations|Renewable energy power plants in the Philippines |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。