{{Infobox power station
| name = NP Kunta Ultra Mega Solar Park
| name_official = Ananthapur Ultra Mega Solar Park
| image =
| image_caption =
| image_alt =
| coordinates = {{coord|14|03|23|N|78|24|46|E|type:landmark|display=inline,title}}
| country = India
| location = Nambulapulakunta mandal, Ananthapur district, Andhra Pradesh
| status =
| construction_began =
| commissioned = 9 May 2016[1]
| cost =
| owner = Andhra Pradesh Solar Power Corporation Private Limited (APSPCL)
| operator =
| solar_type = pv
| solar_collectors =
| solar_collectors_area =
| solar_aperture_area =
| ps_site_area = {{Convert|7924.76|acre|km2|abbr=on}}
| solar_site_resource = 5.5-6.0 kWh/m2 per day[2]
| ps_units_operational = 500 MW
| ps_units_manu_model =
| ps_units_uc = 1450 MW
| ps_units_planned = 1,500 MW
| ps_units_cancelled =
| ps_units_decommissioned=
| ps_thermal_capacity =
| ps_electrical_capacity =
| ps_electrical_cap_fac =
| ps_storage_capacity =
| ps_annual_generation =
| website = http://apspcl.ap.gov.in/content/npkuntasite
| extra =
}}

The NP Kunta Ultra Mega Solar Park, also known as Ananthapuram Ultra Mega Solar Park, is a solar park spread over a total area of {{Convert|7924.76|acre|km2}} in Nambulapulakunta mandal in the Ananthapur district of the Indian state of Andhra Pradesh.

The first phase of park was commissioned on 9 May 2016 with a capacity of 200 MW.An additional 50 MW capacity was commissioned on 29 July 2016. A further 750 MW was planned to have been commissioned by March 2018 in the second phase.

In August 2016, Tata Power Solar commissioned a 100 MW solar project at the park built over an area of 500 acres. This was the largest solar project commissioned using domestically manufactured solar cells and modules at the time.

In May 2018, Azure Power commissioned a 50 MW solar capacity at the park. In July 2018, Tata Power commissioned another 100 MW capacity, taking total commissioned capacity to 500 MW.

In July 2018, 750 MW were awarded for installation at Rs 2.71 per KWh.

See also

{{Portal|India|Sustainable development|Renewable energy}}
  • Power sector of Andhra Pradesh
  • Kadapa Ultra Mega Solar Park
  • Kurnool Ultra Mega Solar Park

References

1. ^{{cite web|url=http://www.business-standard.com/article/pti-stories/power-generation-begins-at-kunta-ultra-mega-solar-project-116051001059_1.html|title=Power generation begins at Kunta ultra mega solar project | Business Standard News|date=|publisher=Business-standard.com|accessdate=2016-09-14}}
2. ^{{cite web|url=http://www.nrel.gov/international/images/india_ghi_annual_2016-01.jpg|title=India Solar Resource - Global Horizontal Irradiance - Annual Average, by NREL, National Renewable Energy Laboratory}}
{{SPIN}}

4 : Photovoltaic power stations in India|2016 establishments in India|Anantapur district|Power stations in Andhra Pradesh