请输入您要查询的百科知识:

 

词条 Stadler WINK
释义

  1. Service history

  2. Design

  3. References

{{short description|Train}}{{Infobox Train
| background =
| name = Stadler WINK
| image =
| imagesize =
| caption =
| interiorimage =
| interiorcaption =
| service = 2020–
| manufacturer = Stadler Rail
| factory =
| family =
| replaced =
| refurbishment =
| yearconstruction =
| yearservice = 2020
| yearscrapped =
| numberconstruction = 18
| numberbuilt =
| numberservice =
| numberscrapped =
| formation =
| fleetnumbers =
| capacity = 250
| operator = Arriva
| depots =
| lines =
| carbody = Aluminium
| carlength = {{convert|55.5|m|ftin|frac=8|abbr=on}} (Arriva spec; customizable)[1]
| width = {{convert|2.82|m|ftin|frac=8|abbr=on}}[1]
| height = {{convert|4.12|m|ftin|frac=8|abbr=on}}[1]
| floorheight =
| platformheight =
| entrylevelorstep =
| art-sections =
| doors =
| maxspeed = {{convert|160|km/h|mph|abbr=on}}[1]
| weight =
| acceleration =
| deceleration =
| traction =
| engine = Diesel
| poweroutput =
| transmission =
| aux =
| powersupply =
| gauge =
| electricsystem = Batteries
| collectionmethod =
| brakes =
| safety =
| coupling =
}}

The Stadler WINK (Wandelbarer Innovativer Nahverkehrs-Kurzzug [English translation: convertible, innovative short train for local transport]) is a multiple unit railcar designed and built by Stadler Rail of Switzerland that is planned to enter service in 2020.

Service history

The WINK was unveiled in November 2017 when European operator Arriva announced an order for 18 trainsets, which it planned to place in service in the northern Netherlands beginning in 2020.[1]

Upon delivery, repair and maintenance of the trainsets will be performed by Stadler in Leeuwarden through 2035.[2]

Design

The WINK is a derivative design of Stadler's FLIRT railcars that is intended for service on lightly traveled lines.[1] It has an aluminium carbody that can be customized in length by the customer, and can be powered by either diesel or electric powertrains with supplemental on board batteries.[1] Arriva units will be delivered with Deutz diesel engines, running on vegetable oil fuel, and batteries charged by regenerative braking; the engines are planned to be replaced by additional batteries once electrification is installed over part of their route.[1][2] Each trainset can carry about 275 passengers, with seating for 150, and has a top speed of up to {{convert|160|kph|mph}} depending on customer specification.[1]

References

1. ^{{cite web | url=http://www.railwaygazette.com/news/traction-rolling-stock/single-view/view/stadler-launches-wink-multiple-unit-offering-a-range-of-traction-options.html | title=Stadler launches Wink multiple-unit offering a range of traction options | publisher=Railway Gazette | date=22 November 2017 | accessdate=23 November 2017}}
2. ^{{cite web | url=http://www.railjournal.com/index.php/rolling-stock/stadler-signs-15-year-maintenance-contact-with-arriva-netherlands.html | title=Stadler signs 15-year maintenance contact with Arriva Netherlands | publisher=International Railway Journal | date=11 July 2018 | accessdate=10 September 2018}}

2 : Stadler Rail multiple units|Multiple units of the Netherlands

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/21 8:12:25