请输入您要查询的百科知识:

 

词条 Warsaw–Gdańsk railway
释义

  1. Opening

  2. Electrification

  3. Modernisation

  4. Usage

  5. See also

  6. References

  7. External links

{{Infobox rail line
| box_width =
| name = Warsaw–Gdańsk railway
| color =
| logo =
| logo_width =
| logo_alt =
| image = POL rail 9 map.svg
| image_width =
| image_alt =
| caption =
| type = Heavy rail
| system =
| status = in use
| locale = Poland
| start = Warsaw
| end = Gdańsk
| stations =
| routes =
| daily_ridership =
| ridership2 =
| open = {{Start date and age|1852|df=y}}
| close =
| owner =
| operator =
| character =
| depot =
| stock =
| linelength_km = 323.393
| linelength_mi =
| linelength =
| tracklength_km=
| tracklength_mi=
| tracklength =
| tracks =
| gauge = {{RailGauge|sg|al=on}}
| old_gauge =
| load_gauge =
| minradius =
| racksystem =
| routenumber = 9
| linenumber =
| electrification = 3000 V DC
| speed_km/h = 160
| speed_mph = 99
| speed =
| elevation_m =
| elevation_ft =
| elevation =
| website =
| map = {{infobox rdt|Warsaw–Gdańsk railway diagram|legend=no|navbar=no}}
| map_state = collapsed
}}

The Warsaw–Gdańsk railway is a Polish 323-kilometre long railway line, that connects Warsaw with Iława, Malbork, Tczew, Gdańsk and further along the coast to Gdynia.

Opening

The line was opened in stages between 1852 and 1877. Today's Line 9 was created separately in the Russian zone and German zone. It was built as part of the Prussian Eastern Railway linking Berlin with Königsberg (today's Kaliningrad).

Date Section
6 August 1852 Gdańsk - Tczew
12 October 1857 Tczew - Malbork
1 September 1876 Malbork - Iława
1877 Iława - Warsaw

The line is double track throughout. The last single-track section between Mikolajki Pomorskie and Malbork was doubled to two tracks in 1967.[1]

Electrification

Electrification took place in six stages between 1969 and 1985:

  • 1969 - electrification of section Gdańsk - Tczew
  • 1972 - electrification of section Warsaw - Nasielsk
  • 1983-1985 - electrification of section of Nasielsk - Tczew [2]

Modernisation

Between 2006 and 2014 the line was completely modernised and made suitable for passenger trains to travel at 200 km/h (160 km/h for trains without ETCS) and 120 km/h for freight trains with axle load of 22.5 tonnes. Before modernisation speed on the line was between 80 and 120 km/h. The cost of modernisation cost about PLN 10 billion,[3][4] which gives an approximate cost of PLN 31 million per kilometer of the route.

Usage

The line sees trains of various categories (EuroCity, Express InterCity, Intercity, TLK and regional services).

  • EuroCity services from Gdynia to Vienna
  • Intercity Premium, Express Intercity, Intercity and TLK services along the whole route
  • Regional services

See also

  • Railway lines of Poland

References

1. ^[https://www.bazakolejowa.pl/index.php?dzial=linie&id=294&okno=przebieg History of Line 9]
2. ^[https://www.bazakolejowa.pl/index.php?dzial=linie&id=294&okno=przebieg History of Line 9]
3. ^ 
4. ^ 
  • This article is based upon a translation of the Polish language version as of October 2016.

External links

{{commonscat-inline|Railway line 9 (Poland)}}{{DEFAULTSORT:Warsaw-Gdansk railway}}{{poland-rail-transport-stub}}

2 : Railway lines in Poland|Railway lines opened in 1852

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/14 12:22:57