请输入您要查询的百科知识:

 

词条 Ballymena and Larne Railway
释义

  1. Routes

  2. Early years

  3. Later years

  4. See also

  5. References

{{coord|54.855|-5.811|display=title|region:GB_scale:10000}}{{UKrail-header|Ballymena and Larne Railway|#9E005E}}{{BS-table}}{{BS|exCONTg||{{BSsplit|BCRB|Towards Retreat}}|}}{{BS3|CONTgq|xvSTRg+r|||{{BSsplit|Belfast–Derry railway line|Towards {{stnlnk|Londonderry Waterside}}}}||}}{{BS|vBHF-exBHF||{{stnlnk|Ballymena}}|}}{{BS5|STR+l|STRq|xvSTRgr|}}{{BS5|STR|exKBHFaq|exABZg+r||||{{stnlnk|Ballymena Harryville}}|}}{{BS5|CONTf||exSTR||||{{BSsplit|Belfast–Derry railway line|Towards {{stnlnk|Belfast Central}}}}||}}{{BS|exBHF||{{stnlnk|Kells|Northern Ireland}}|}}{{BS|exBHF||Moorfields|}}{{BS|exBHF||{{stnlnk|Collin}}|}}{{BS|exBHF||{{stnlnk|Ballynashee}}|}}{{BS3|exKBHFa|exSTR|||{{stnlnk|Doagh|Ballymena and Larne Railway}}|}}{{BS3|exBHF|exSTR|||{{stnlnk|Ballyclare}}|}}{{BS3|exBHF|exSTR|||{{stnlnk|Ballynure}}|}}{{BS3|exSTRl|exABZg+r|}}{{BS|exBHF||{{stnlnk|Ballyboley Junction}}|}}{{BS|exBHF||{{stnlnk|Headwood}}|}}{{BS|exBHF||{{stnlnk|Kilwaughter Halt}}|}}{{BS5|CONTgq|STR2+r|exSHI1l|O3=STRc3||||{{BSsplit|Belfast–Larne railway line|Towards {{stnlnk|Belfast Central}}}}|}}{{BS3|STRc1|vSTR+4-|O2=exv-STR|}}{{BS|vBHF-exKBHFe||{{stnlnk|Larne Town}}|}}{{BS|SHI1+r|}}{{BS|HST||{{stnlnk|Larne Harbour}}|}}{{BS|LTRAJEKT|||P&O Irish Sea}}{{BS|LCONTf|||To {{stnlnk|Stranraer}} and {{stnlnk|Troon}}}}

|}

The Ballymena and Larne Railway was a {{RailGauge|3ft|lk=on}} narrow gauge in County Antrim, Northern Ireland. The first part opened in July 1877 and regular passenger services began in August 1878, the first on the Irish {{RailGauge|3ft}} gauge railways.[1] Passenger services ended in 1933 and the last part of the railway closed in 1950.

Routes

From east to west, the railway ran for {{convert|32|mi|km}} between Larne and Ballymena via Kilwaughter, Headwood, Ballyboley, Ballynashee, Collin, Moorfields, Kells and Harryville.[2] A branch line operated from Ballyboley to Doagh via Ballynure and Ballyclare.[1] From Larne, the line rose for {{convert|12|mi|km}} to a summit of {{convert|660|ft|m}} at Ballynashee. The gradient was, in places, as steep as 1 in 36. The line operated both passenger and goods traffic; transport of locally mined iron ore was the main reason for the construction of the line.[3]

Early years

The line between Larne and Ballyclare opened in 1877. The line between Ballyboley and Ballymena opened in August 1878. The railway originally terminated at Harryville on the outskirts of Ballymena; in 1880 it was extended to Ballymena's main line (Belfast and Northern Counties Railway (B&NCR)) station, where it also made a connection with the Ballymena, Cushendall and Red Bay Railway. The extension from Ballyclare to Doagh opened in 1884. The line's original steam locomotives were built by Beyer Peacock of Manchester to a design similar to those built for the Isle of Man Railway. By the late 1880s the County Antrim iron ore industry was in decline. The railway experienced financial difficulties and was taken over by the B&NCR in July 1889.[3]

Later years

The B&NCR was itself taken over by the Midland Railway (of England) in 1903, which in turn became part of the London, Midland and Scottish Railway (LMS) in 1923. The Midland and the LMS operated its lines in Northern Ireland through its Northern Counties Committee (NCC). Following the takeover, the parent companies were able to invest in new locomotives and equipment. Following World War I, the line experienced a further decline in mineral traffic and increasing road competition. Nevertheless, the LMS invested in new carriages for the line in 1928. These carriages were arguably the most comfortable and modern ever built for an Irish narrow gauge line, including steam heating, electric lighting, lavatories and corridor connections between the coaches.[3] The steamer expresses took 60 minutes from Ballymena to Larne with one stop and 64 minutes eastbound with three stops.[4]

In early 1933 the railway system in Northern Ireland was severely disrupted by a strike. The management announced that passenger services would not resume. The strike also saw the closure of the Castlederg and Victoria Bridge Tramway. Passenger services between Ballyclare and Doagh had already ended in October 1930. Goods trains between Ballymena and Ballyboley Junction ended in 1940. The 12 mile long Larne to Ballyclare railway remained open until 3 July 1950, when the Ulster Transport Authority (which took over the LMS/NCC in 1949) closed the remaining part of the line. This followed the closure of a paper mill at Ballyclare, which had supplied much of the line's remaining freight traffic. The UTA also closed the Ballycastle Railway on the same day.[3]

See also

  • List of narrow gauge railways in Ireland
  • Ballycastle Railway
  • Ballymena, Cushendall and Red Bay Railway
  • Castlederg and Victoria Bridge Tramway
  • Cavan and Leitrim Railway
  • Clogher Valley Railway
  • County Donegal Railways Joint Committee
  • List of heritage railways in Northern Ireland
  • Londonderry and Lough Swilly Railway

References

1. ^{{cite book |last= Baker |first= Michael HC |title= Irish Narrow Gauge Railways. A View from the Past|publisher= Ian Allan Publishing|year= 1999 |isbn= 0-7110-2680-7 }}
2. ^{{coord|54.863|-6.278|display=inline|region:GB_scale:10000}}
3. ^{{cite book |last= Ferris |first= T |title= The Irish Narrow Gauge (Volume 2, The Ulster Lines) |publisher= Midland Publishing |year= 1993 |isbn= 1-85780-017-6 }}
4. ^Railway Magazine June 1936 p. 415
{{Use dmy dates|date=May 2011}}

6 : Closed railways in Northern Ireland|3 ft gauge railways in Ireland|Transport in County Antrim|Railway lines opened in 1877|Railway lines closed in 1950|Transport in Larne

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/22 12:58:46