请输入您要查询的百科知识:

 

词条 Batman Dam
释义

  1. References

  2. External links

{{Infobox dam
| name = Batman Dam
| image = BatmanDam-July2012-01.JPG
| image_caption =
| name_official = Batman Baraji
| dam_crosses = Batman River
| location = Batman, Turkey in Batman Province
| dam_type = Embankment, earth and rock-fill
| dam_length ={{Convert|510|m|ft|0|abbr=on}}
| dam_height ={{Convert|74|m|ft|0|abbr=on}}
| dam_elevation_crest = {{Convert|670|m|ft|0|abbr=on}}
| plant_hydraulic_head ={{Convert|61.8|m|ft|0|abbr=on}} (gross)
| dam_width_crest ={{Convert|12|m|ft|0|abbr=on}}
| dam_width_base ={{Convert|300|m|ft|0|abbr=on}}
| dam_volume ={{Convert|4000000|m3|acre.ft|0|abbr=on}}
| spillway_type =Service, controlled-chute
| spillway_capacity ={{Convert|8200|m3/s|ft3/s|0|abbr=on}}
| purpose = Power, irrigation
| status = O
| construction_began = 1986
| opening = 1999
| cost =
| owner = State Hydraulic Works
| res_name = Batman Reservoir
| res_capacity_total = {{Convert|1175000000|m3|acre.ft|abbr=on}}
| res_capacity_active = {{Convert|738000000|m3|acre.ft|abbr=on}}
| res_capacity_inactive= {{Convert|447000000|m3|acre.ft|abbr=on}}
| res_elevation = {{Convert|665|m|ft|abbr=on}}
| res_max_length = {{Convert|15|km|mi|abbr=on}}
| res_surface = {{Convert|49|km2|mi2|abbr=on}}[1]
| res_catchment ={{Convert|4105|km2|sqmi|0|abbr=on}}
| res_max_depth =
| plant_operator =
| plant_commission = 1998 est.
| plant_turbines = 3 x 62 MW, 1 x 5.7 MW Francis-type
| plant_capacity = 160 MW
| plant_annual_gen =
| plant_decommission =
| location_map =Turkey
| location_map_caption =
| coordinates = {{coord|38|17|28.47|N|41|01|24.84|E|type:landmark|display=inline,title}}
| website =
| extra =
}}

Batman Dam is one of the 22 dams of the Southeastern Anatolia Project of Turkey, built on the Batman River, north of Batman, in southeastern of Turkey. It was constructed between 1986 and 1999. There is a hydroelectric power plant, established in 1998, at the dam, with a power output of 191.7 MW. The dam is designed to service an irrigation area of {{Convert|37744|ha|acre|abbr=on}}. The Silvan Dam is located upstream.

References

1. ^{{cite web|title=Ilisu Dam Environmental Impact Assessment|url=http://www2.dsi.gov.tr/ilisu/ilisu_ced_eng.pdf|publisher=State Hydraulic Works|accessdate=21 May 2013|pages=TABLE 2–6 (PDF pgs. 118–119)|year=2005|deadurl=yes|archiveurl=https://web.archive.org/web/20150926095504/http://www2.dsi.gov.tr/ilisu/ilisu_ced_eng.pdf|archivedate=26 September 2015|df=}}
  • {{cite web|url=http://www2.dsi.gov.tr/baraj/detay.cfm?BarajID=188 |title=General information on Batman Dam, Turkey |accessdate=2009-03-05 |author=State Hydraulic Works (DSİ), Turkey |authorlink=State Hydraulic Works (Turkey) |deadurl=yes |archiveurl=https://web.archive.org/web/20141214103637/http://www2.dsi.gov.tr/baraj/detay.cfm?BarajID=188 |archivedate=2014-12-14 |df= }}
  • [https://web.archive.org/web/20060302001632/http://www.un.org.tr/undp/Gap.htm www.un.org.tr/undp/Gap.htm - United Nations] Southeast Anatolia Sustainable Human Development Program (GAP)
  • [https://web.archive.org/web/20110716140556/http://www.gapturkiye.gen.tr/english/current.html www.gapturkiye.gen.tr/english/current.html] Current status of GAP as of June 2000
  • [https://web.archive.org/web/20070928080044/http://www.ecgd.gov.uk/eiar_s2.pdf www.ecgd.gov.uk] Data sheet

External links

{{stack|{{Portal|Turkey|Water|Renewable energy}}}}
  • www.gap.gov.tr - Official GAP web site
{{Southeastern Anatolia Project}}{{Dams and reservoirs in Turkey}}{{Power stations in Turkey}}{{Turkey-dam-stub}}{{Hydroelectric-power-plant-stub}}{{Turkey-powerstation-stub}}

5 : Hydroelectric power stations in Turkey|Southeastern Anatolia Project|Dams in Batman Province|Dams completed in 1999|Dams on the Batman River

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/20 5:32:29