词条 | Chicago Region Environmental and Transportation Efficiency Program |
释义 |
The Chicago Region Environmental and Transportation Efficiency Program (CREATE) is a $3.2 billion project to improve the efficiency of the rail network in the Chicago area by building, amongst other things, flyovers to separate rail traffic on conflicting lines. While the need is fairly clear, finance for the project is stalled in the United States Congress. ProblemsThe tracks and junctions in the Chicago area have grown with little coordination between the railroads and the city since the first railroads arrived in the 1830s. There are a large number of at-grade crossings, sometimes not located a train length apart which is a problem as train lengths have grown. Some flyovers exist but do not always have sufficient clearance for tall or double-stack trains. Some connections that would create short cuts for traffic are missing. There are also many highway crossings at grades. The congestion in the Chicago area is predicted to lead to severe disruption by the late 2010s without the completion of the CREATE program.[1] ProjectsThe program is composed of a total of 71 separate projects, of which 46 are eliminating rail junctions and the remainder are eliminating grade crossings.[1] As of November 2017, a total of 29 had been fully completed, 5 were under construction, four are in final design, and another 13 are in the preliminary design and environmental review process.[2] Major projectsEnglewood JunctionDue to a $140 million project under construction as of May 2012,[3] a junction in Englewood, Chicago will get a flyover for Metra trackage above a Norfolk Southern route, eliminating a grade-level crossing.[5] 138 trains a day operate through the junction, which is the cause of the majority of delays in the Midwest for Amtrak trains.[5] Planned since 2002, the project was originally to begin construction in late 2010, with a completion date in 2012.[4] On 22 June 2011, it was announced that the state of Illinois, Amtrak, Norfolk Southern and the Federal Railway Administration had signed a final agreement for financing the project. The federal government is paying 95% of the cost, [5]and it opened in October 2014. [6]75th Street CorridorOn a daily basis, 80 Metra and freight trains cross paths along the Belt Railway of Chicago on Chicago's South Side near 75th Street.[7] The project budgeted at $474 million,[7] began construction in October 2018, and is scheduled to be completed in 2025.[8] As a part of this project, Metra plans to reroute SouthWest Service commuter trains from Chicago Union Station to LaSalle Street Station, in order for high-speed passenger trains to operate into Union Station.[1] Other projects
FundingCREATE is a public-private partnership estimated to cost around $3 billion, up from an initial predicted cost of $1 billion.[1] $230 million is to be supplied by railroads that are part of the program, with the remainder coming from governments at federal, state and local levels.[1] In July 2010, a $100 million TIGER grant from the federal government was finalized.[9] As of late 2010, a total of around $320 million had been committed to the project, with an additional $133 million to be provided from the American Recovery and Reinvestment Act.[1] In 2018, CREATE received a $132 million grant from the United States Department of Transportation's (USDOT) Rebuilding America (INFRA) grant program.[11] Other sources of funding included grants from the Illinois Department of Transportation (IDOT), the Association of American Railroads (AAR), Cook County, Metra, the City of Chicago, and Amtrak.[7] See also
External links
References1. ^1 2 3 4 5 {{cite web|url=http://www.progressiverailroading.com/news/article/More-projects-more-funding-still-on-CREATEs-slate-UPs-Payette-says--25000|title=More projects, more funding still on CREATE's slate, UP's Payette says|publisher=Progressive Railroading|date=8 November 2010|accessdate=9 November 2010}} 2. ^{{cite web|title=IDOT INFRA application 75CIP-B9|url=http://miprc.org/Portals/7/pdfs/IDOT_INFRA%20application_75CIP-B9__FINAL.PDF?ver=2017-11-07-105353-080|accessdate=28 November 2017}} 3. ^Train Late? Blame Chicago, John Schwartz, New York Times, May 7, 2012 4. ^1 2 {{cite web|title=Englewood flyover work to begin this year|url=http://trn.trains.com/Railroad%20News/News%20Wire/2010/03/Englewood%20flyover%20work%20to%20begin%20this%20year.aspx|publisher=Trains Magazine|accessdate=11 November 2010|date=5 March 2010}} 5. ^{{cite web |url=http://www.chicagotribune.com/news/local/breaking/chi-construction-to-begin-on-englewood-flyover-rail-bridges-20110622,0,5864858.story |title=Construction to begin on Englewood Flyover rail bridges |publisher=Chicago Tribune |date=22 June 2011 |accessdate=24 June 2011 |archiveurl=https://www.webcitation.org/5zfZqtw5d?url=http://www.chicagotribune.com/news/local/breaking/chi-construction-to-begin-on-englewood-flyover-rail-bridges-20110622%2C0%2C5864858.story |archivedate=24 June 2011 |deadurl=yes |df= }} 6. ^Metra Flyover Chicago Tribune, 2014 Oct 23 7. ^1 2 {{cite news|url=https://www.chicagotribune.com/news/ct-biz-create-grant-20180605-story.html|title=State gets $132 million federal grant to reduce South Side railroad delays|last=Wisniewski|first=Mary|newspaper=Chicago Tribune|date=June 5, 2018|accessdate=December 11, 2018}} 8. ^{{cite news|url=https://chicagocrusader.com/preckwinkle-partners-mark-75th-street-rail-corridor-improvement-project/|title=Preckwinkle, Partners Mark 75th Street Rail Corridor Improvement Project|newspaper=The Chicago Crusader|date=October 1, 2018|accessdate=December 11, 2018}} 9. ^1 2 3 {{cite web | url=http://progressiverailroading.com/news/article/CREATE-partners-apply-TIGER-funds-to-five-projects--25402 | title=CREATE partners apply TIGER funds to five projects | accessdate=8 January 2010 | date=6 January 2011 | publisher=Progressive Railroading}} 10. ^{{cite web|title=CREATE project completed in southern Chicago suburb |url=http://www.progressiverailroading.com/mow/article/CREATE-project-completed-in-southern-Chicago-suburb--28767 |publisher=Progressive Railroading |accessdate=11 November 2011 |archiveurl=https://www.webcitation.org/636ZbSVdR?url=http://www.progressiverailroading.com/mow/article/CREATE-project-completed-in-southern-Chicago-suburb--28767 |archivedate=11 November 2011 |date=8 November 2011 |deadurl=yes |df= }} 11. ^{{cite news|url=https://www.rtands.com/track-maintenance/on-track-maintenance/infra-grants-148m-to-create-and-ohio-rail-projects/|title=INFRA grants: $148M to CREATE and Ohio rail projects|last=Wanek-Libman|first=Mischa|publisher=Railway Track and Structures|date=June 6, 2018|accessdate=December 11, 2018}} 2 : Transportation in Chicago|Passenger rail transportation in Illinois |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。