请输入您要查询的百科知识:

 

词条 Crossrail 2
释义

  1. Current plans

      Core section    Northern Regional section   Potential eastern extension   South West section  

  2. Transport for London consultations

     2013 consultation  2014 consultation  2015 consultation 

  3. Cost and funding

  4. History

     1970s  1980s  1990s  2000s  2010s  2008 safeguarded route  Northern and southern destinations 

  5. Support and opposition

     Support  Opposition 

  6. External links

  7. References

{{Use dmy dates|date=April 2011}}{{Use British English|date=November 2015}}{{Infobox rail line
| name = Crossrail 2
| color = E1EB5B
| logo = Crossrail2.svg
| logo_width = 150px
| caption = Crossrail 2 logo
| type = Commuter/suburban rail
| system = National Rail
| status = Proposed
| locale =
| start =
| end =
| stations = 47
| routes =
| daily_ridership =
| open =
| close =
| owner = {{unbulleted list|Transport for London |Network Rail}}
| operator =
| character =
| depot =
| stock =
| linelength =
| tracklength =
| tracks = 2
| gauge = {{track gauge|uksg|allk=on}}
| electrification = 25 kV 50 Hz AC (Overhead line)
| speed = Up to {{convert|90|mph|km/h|abbr=on|order=flip}}
| elevation =
| map =
| map_state = expanded
| website = {{url|www.crossrail2.co.uk}}
}}Crossrail 2 is a proposed rail route in South East England, running from nine stations in Surrey to three in Hertfordshire, providing a new North-South rail link across London. It would connect the South Western Main Line to the West Anglia Main Line, via Victoria and {{LUL stations|station=King's Cross St Pancras}}. It is intended to alleviate severe overcrowding that would otherwise occur on commuter rail routes into Central London by the 2030s.[1][2] Should permission be granted, construction is expected to start around 2023, with the new line opening from the early 2030s.[3] The project's cost has been estimated at £31.2 billion.[4]

The line is the fourth major rail project in the capital since 2000 (East London line extensions opened in May 2010, the Thameslink Programme opened in 2018 and Crossrail opens after 2019). National Rail's projections of overcrowding, including in suburbs and tourist destinations less well-served by the Underground, led it to call for more new lines[4] and cross-London line proposals have gained more importance with Euston being named as the terminus of the planned High Speed 2 rail line.[5]

The project was earlier known as the Chelsea–Hackney line (or Chelney line) in reference to a potential route. The plan for a line on this alignment has existed in various forms since 1970, initially as an Underground service and later as a standard railway.

Current plans

{{Crossrail 2}}

This route is from the 2015 public consultation.[6]

Core section

Operating in new underground tunnels at 30 trains per hour (in each direction):

  • Dalston ({{Stnlnk|Dalston Junction}}–{{Stnlnk|Dalston Kingsland}} {{rint|london|overground|East}}) Double-ended station
  • {{LUL stations|station=Angel}} {{rint|london|Northern}}
  • {{rws|Euston St. Pancras}} {{rint|london|Victoria}} {{rint|london|Northern}} {{rint|london|Piccadilly}} {{rint|london|Metropolitan}} {{rint|london|Circle}} {{rint|london|H&c}} {{rint|london|overground}} {{rint|gb|rail}} (High Speed 1, High Speed 2, East Coast Main Line, Midland Main Line, West Coast Main Line, Thameslink)
    double-ended station serving Euston, King's Cross and St Pancras mainline stations and the Underground's Euston, Euston Square and King's Cross St Pancras stations
  • {{LUL stations|station=Tottenham Court Road}} {{rint|london|crossrail}} {{rint|london|Northern}} {{rint|london|Central}} (Crossrail Elizabeth line)
  • {{LUL stations|station=Victoria}} {{rint|london|Victoria}} {{rint|london|Circle}} {{rint|london|District}} {{rint|gb|rail}} (Brighton main line, Chatham main line)
  • {{LUL stations|station=King's Road Chelsea}} - the only entirely new station site
  • {{Stnlnk|Clapham Junction}} {{rint|london|overground}} {{rint|gb|rail}} (SWML, Brighton main line, Waterloo–Reading line)
  • {{LUL stations|station=Tooting Broadway}} {{rint|london|Northern}} or {{LUL stations|station=Balham}} {{rint|london|Northern}} {{rint|gb|rail}}[7]
  • {{LUL stations|station=Wimbledon}} {{rint|london|District}} {{rint|london|tram}} {{rint|gb|rail}} (South Western main line, Sutton Loop Line (Thameslink))

Also in new tunnels, connected to a junction north of Dalston, at 10 and 15 trains per hour:

  • {{LUL stations|station=Seven Sisters}}-{{Stnlnk|South Tottenham}}[8] {{rint|london|Victoria}} {{rint|london|overground}} double ended station
  • either {{LUL stations|station=Turnpike Lane}} {{rint|london|Piccadilly}} and {{Stnlnk|Alexandra Palace}} {{rint|gb|rail}} (Thameslink, Northern City Line, Hertford Loop Line) or {{LUL stations|station=Wood Green}} {{rint|London|Piccadilly}}[9]
  • {{Stnlnk|New Southgate}} {{rint|gb|rail}} having surfaced, continuing to Oakleigh Road depot.[10]

Northern Regional section

Running at between 10 and 15 trains per hour[11] on new rails above ground, connected to a junction north of Dalston:

{{LUL stations|station=Tottenham Hale}} {{rint|london|Victoria}} {{rint|gb|rail}} (West Anglia Main Line, Lea Valley lines) all stations[12] to {{Stnlnk|Broxbourne}} for Crossrail 2 services[13] and {{Stnlnk|Cheshunt}} {{rint|gb|rail}}.

Potential eastern extension

The 2015 consultation earmarks a "potential future Eastern Branch"[14]

  • {{Stnlnk|Hackney Central}}/{{Stnlnk|Hackney Downs}} {{rint|london|overground}} {{rint|gb|rail}} (Lea Valley lines)

South West section

Above ground, after surfacing south of Wimbledon station, using the existing SWML slow line, and providing between 4 and 20 trains per hour, the southern section comprises:

  • 20 trains per hour at {{Stnlnk|Raynes Park}} {{rint|gb|rail}}
  • 8-10 trains per hour at {{Stnlnk|Motspur Park}} {{rint|gb|rail}} [15]
  • Exclusive use of the Chessington branch line to {{Stnlnk|Chessington South}} at 4 trains per hour[16]
  • Mixed (shared) use of the Raynes Park – Epsom line to {{Stnlnk|Epsom}} {{rint|gb|rail}} (Sutton and Mole Valley lines) (4-6 trains per hour)[17]
  • 10-12 trains per hour at {{Stnlnk|New Malden}} {{rint|gb|rail}}
  • Exclusive use of the Hampton Court branch line to {{Stnlink|Hampton Court}} at 4 trains per hour via shared station {{Stnlnk|Surbiton}} {{rint|gb|rail}}[18]
  • Shared use of the bulk of the Kingston Loop Line via {{Stnlnk|Kingston|England}} {{rint|gb|rail}} at 6-8 trains per hour to {{Stnlnk|Teddington}} {{rint|gb|rail}} and 4 trains per hour onward to {{Stnlnk|Shepperton}} {{rint|gb|rail}} [19]

Transport for London consultations

2013 consultation

In May 2013, TfL began public consultation on two potential options:

  • Metro route: Wimbledon - Central London - Angel - Alexandra Palace (all underground)
  • Regional route: Twickenham/Surbiton/Epsom - Wimbledon - Central London - Angel - Alexandra Palace (underground) plus Angel - Cheshunt.

The results of the consultation were published on 29 November 2013 by TfL and revealed broad support for the Crossrail 2 plans. 96% of respondents supported or strongly supported the plans, whilst 2% opposed or strongly opposed them. The regional route had greater support than the metro route, with 84% of respondents supporting or strongly supporting the regional route versus 73% for the metro plans.[20]

The greatest level of opposition to the principle of Crossrail 2 came from the residents of Kensington and Chelsea, the only area with more than 5% of respondents (16%) who strongly opposed the scheme. Nearly 20% of respondents from this area either opposed or strongly opposed the scheme; the corresponding percentages in all other areas did not exceed 10%.[21]

2014 consultation

In June 2014, a consultation began on small modifications to the 2013 proposals. The changes proposed fell broadly into three areas: extending the Alexandra Palace branch to New Southgate; relocation or removal of the Chelsea station; and moving the point at which the two northern branches diverged to beyond either Dalston Junction or Hackney Downs station, calling at only one of these two stations.[22]

2015 consultation

A further consultation began in October 2015.[23] In October 2015, the route proposal was changed in three ways:

  • Balham was to be the preferred stop instead of the nearby alternative of Tooting Broadway. This would give a further railway interchange
  • Not to serve the remainder of the Kingston Loop Line (Strawberry Hill and Twickenham).[24]
  • A (pink-coloured) option bypassing Turnpike Lane and Alexandra Palace and instead going via Wood Green to support "Haringey's aspiration for the redevelopment of Wood Green High Street .. situated in the main retail area of Wood Green with access to shops, leisure and services".[9]

In January 2015, Surrey County Council published a detailed report lobbying for TfL to consider extending branches to Dorking and Woking.[25]

Cost and funding

The cost of the scheme has been estimated at £27–32 billion, in 2014 prices including the cost of new trains and Network Rail works.[26] However Transport for London (TfL) argued the full cost of the project could be £45 billion in 2017. To ease the funding issues TfL recommended spreading the funding over a longer period and completing the project by the 2040s, ten years after the initial projection.[27]

In the 2016 Budget, the Treasury gave the "green light" for the project, and allocated £80 million towards developing the project, with the aim of bringing forward a Hybrid Bill "this Parliament", meaning before 2020.[28]

In the 2017 Autumn Budget, the Treasury said only that it will "continue to work with Transport for London on developing fair and affordable plans for Crossrail 2, including through an independent review of funding and financing".[29] On 2 March 2018, the UK's Transport Secretary, who represents a seat centred on a prospective terminus of one of the branch lines (Epsom and Ewell), announced Mike Gerrard would lead the Treasury's required Independent Affordability Review, which is expected to conclude in the summer of 2018.[30]

The Mayor of London intends to charge Mayoral Community Infrastructure Levy in the same manner as for the original Crossrail project.[31]

History

{{Refimprove section|date=November 2015}}

A south-west/north-east tube line was originally planned as early as 1901[32] and a Bill was put before Parliament in 1904.[33] However, political manoeuvring by rival tube magnate Charles Yerkes ended the proposal.[32]

1970s

{{Chelsea-Hackney line 1974}}

A south-west to north-east tube line was proposed in 1970 by the London Transport Board's London Rail Study as the next project after the completion of the Victoria line and the Fleet line (now the Jubilee line). Designed to relieve pressure on the District, Central and Victoria lines and to link two areas without tube services, the route would have taken over the {{lus|Wimbledon}} branch of the District as far as {{lus|Parsons Green}}, then followed a new underground alignment via {{lus|Aldwych}} (where it would take over the then Piccadilly line shuttle to Holborn); thence to {{lus|Leytonstone}}, and continuing over one of the branches of the Central line.[34] For financial reasons the line was not built, but the idea has remained.

1980s

{{Kings line}}

Following the Central London Rail Study of 1989, a route through central London was safeguarded.[32] As the route would serve both King's Cross and King's Road it was suggested that it could be named Kings line. It was decided, however, that the Jubilee line extension should take priority and the project was postponed.

1990s

{{Express Metro}}

In 1995, an alternative Express Metro plan was put forward that would utilise more existing track, have fewer stations and be built to National Rail standards. It would take one of three routes from {{lus|East Putney}} on the District line to {{lus|Victoria}}; either {{lus|Putney Bridge}}, {{lus|Parsons Green}} and {{lus|Chelsea}} or King's Road as in the original safeguarded plan; or to {{rws|Wandsworth Town}} and {{rws|Clapham Junction}} and then via Chelsea Harbour and King's Road or via Battersea. From Hackney Central it would split into two branches, to {{lus|Leytonstone}} and then on to {{lus|Epping}} taking over the Central line; and taking over the North London Line to {{rws|North Woolwich||Woolwich}},[32] a route now followed by the Docklands Light Railway.

The 1991 safeguarding also included a spur south of Victoria across the river to Battersea Park, for stabling trains and to access a riverside tunnelling site.

2000s

{{Chelsea-Hackney Regional Metro}}

The London East West Study in 2000 considered Crossrail, the Chelsea–Hackney line and a combination of the two, from {{lus|Wimbledon}} to {{lus|Tottenham Court Road}} and then to {{lus|Liverpool Street}}. The Study supposes main-line gauge, and would omit a station at {{lus|Piccadilly Circus}}. Its version of the Chelsea-Hackney Regional Metro splits in the north, with one branch via Dalston taking over the {{lus|Epping}} branch of the Central line, the other to {{lus|Finsbury Park}}, then using the disused alignment of the Northern Heights plan, taking over the {{lus|High Barnet}} branch of the Northern line. The Express Metro option would run on the East Coast Main Line.[32][35]

Crossrail was given the go-ahead in 2007 in preference to the Chelsea–Hackney line, despite some commentators favouring the latter[36] putting implementation after Crossrail's completion date of 2018. The Chelsea–Hackney plans were taken over by Crossrail as Crossrail 2.

In 2007, the 1991 route was updated – Sloane Square was dropped and the Central line's Epping branch from Leytonstone was re-safeguarded.[33] Due to objections from residents of Sloane Square, it was reinstated the following year.[44][45] South West Trains' Wimbledon depot was safeguarded as a depot for the line.[45] The safeguarding was enlarged from tube gauge to Network Rail loading gauge as it became clear that larger and longer trains would be needed.[37] Of the three routes proposed for south-west London the Royal Borough of Kensington and Chelsea initially favoured one going south via Imperial Wharf to Clapham Junction, but now supports the takeover of the District line's Wimbledon branch.[38] Under these present plans, only one entirely new station would be constructed, at Chelsea.

2010s

2008 safeguarded route

A route for the line was safeguarded (legally protected from conflicting development) in 2008. It linked the District line's Wimbledon branch with the Central line's Epping branch via {{LUL stations|station=Parsons Green}}, {{LUL stations|station=Chelsea}}, {{LUL stations|station=Sloane Square}}, {{LUL stations|station=Victoria}}, {{LUL stations|station=Piccadilly Circus}}, {{LUL stations|station=Tottenham Court Road}}, {{LUL stations|station=King's Cross St Pancras}}, {{LUL stations|station=Angel}}, {{Stnlnk|Essex Road}}, {{Stnlnk|Dalston Junction}}, {{Stnlnk|Hackney Central}}, {{Stnlnk|Homerton}} and {{LUL stations|station=Leytonstone}}.[39][40] The safeguarding also includes a spur from Victoria under the Thames to Battersea Park for stabling and access to a tunnelling site.[39][41] The safeguarded route was reviewed by the Department for Transport in 2013.[2]

Northern and southern destinations

Network Rail's July 2011 route utilisation strategy (RUS) for London and the South East supports the existing safeguarded route but speculates about possible modifications in addition to re-routing via Euston. To the south, it suggests that the tunnels should go from Victoria via Clapham Junction to beyond Wimbledon, instead of surfacing near Parsons Green and taking over the District line from there to Wimbledon. To the north, it suggests that the West Anglia corridor would be a better destination than a branch of the Central line. These suggestions are driven by what the RUS sees as the need for extra capacity on the South Western Main Line and the West Anglia corridor.

With the planned terminus of HS2 at {{Stnlnk|Euston}}, Chelsea–Hackney was put back to the top of the agenda for new lines, diverted via Euston.

The London and South East second generation RUS by Network Rail proposed some changes to the safeguarded route: serving {{Stnlnk|Clapham Junction}} rather than the {{LUL stations|station=Wimbledon}} branch of the District line, not serving {{LUL stations|station=Sloane Square}}, and serving {{LUL stations|station=Euston}} as well as {{LUL stations|station=King's Cross St Pancras}}. The RUS was also open to changes north of {{Stnlnk|Hackney Central}} and branches south of Clapham Junction, both of which were seen as later phases.[42]

TfL responded by releasing its preferred options - an automatic metro and a regional scheme:[43]

In July 2015, Surrey County Council commissioned a study to propose in detail and with cost-benefits analysed proposals, services from Surbiton as far as the main line stop of Woking (and whether or not to serve directly the four main intervening stations).[56] Options explored were the re-routing trains so as not to terminate at Waterloo and creative timetabling plans to add capacity to the South Western main line such as the option of moving trains onto the lighter-used New Guildford Line which runs between Surbiton and Guildford, looking at more semi-fast stopping patterns enabled as well once the Waterloo bottleneck is lifted.[44]

{{Collapsible list
| title =Automatic Metro
|{{LUL stations|station=Wimbledon}}
|{{LUL stations|station=Tooting Broadway}}
|{{Stnlnk|Clapham Junction}}
|{{LUL stations|station=King's Road Chelsea}}
|{{LUL stations|station=Victoria}}
|{{LUL stations|station=Piccadilly Circus}}
|{{LUL stations|station=Tottenham Court Road}}
|{{Stnlnk|Euston St Pancras}} double-ended station serving both main-line stations as well as King's Cross main-line station and {{LUL stations|station=Euston}} and {{LUL stations|station=King's Cross St Pancras}} Underground stations
|{{LUL stations|station=Angel}}
|{{Stnlnk|Essex Road}}
|{{Stnlnk|Dalston Junction}}
|{{Stnlnk|Hackney Central}}
|{{LUL stations|station=Seven Sisters}}
}}{{Collapsible list
| title =Regional Option
| Commencing at {{Stnlnk|Twickenham}}, {{Stnlnk|Shepperton}}, {{Stnlink|Woking}}, {{Stnlnk|Chessington South}} and {{Stnlnk|Epsom}} (take over or share South West Trains routes)
| {{LUL stations|station=Wimbledon}}
| {{LUL stations|station=Tooting Broadway}}
| {{Stnlnk|Clapham Junction}}
| {{LUL stations|station=King's Road Chelsea}}
| {{LUL stations|station=Victoria}}
| {{LUL stations|station=Tottenham Court Road}}
| {{Stnlnk|Euston St. Pancras}} double-ended station serving both main-line stations as well as King's Cross main-line station and {{LUL stations|station=Euston}} and {{LUL stations|station=King's Cross St Pancras}} Underground stations
| {{LUL stations|station=Angel}} splits into two branches
| {{Stnlnk|Dalston Junction}} // *{{Stnlnk|Hackney Downs}} / {{Stnlnk|Hackney Central}} double-ended station
| {{LUL stations|station=Seven Sisters}} // *{{LUL stations|station=Tottenham Hale}}
| {{LUL stations|station=Wood Green}} // *{{Stnlnk|Cheshunt}}
| {{Stnlnk|Alexandra Palace}} Terminates // Continuing to {{Stnlnk|Hertford East}} (take over or share the Great Eastern branch)
}}

Both TfL routes at both ends of the route serve Clapham Junction to a higher level than relieving the District line, and the Victoria line at its northern end, and the Central line. The regional option relieves the South Western Main Line, and congested sections of the Northern line and Piccadilly line, by creating alternative routes for journeys from outside Zones 1 and 2.

In February 2013, business group London First's Crossrail taskforce, chaired by former Secretary of State for Transport Andrew Adonis published its recommendations for Crossrail 2, favouring the regional option.[45] Later the same day, Network Rail endorsed the plans.[46]

On 5 February 2015 Dr Michèle Dix was appointed managing director of Crossrail 2.[47]

{{Collapsible list
| title=Proposed changes from previous plans were:
| Services west of {{Stnlnk|Surbiton}} would go to {{Stnlnk|Hampton Court}} instead of {{Stnlnk|Woking}}
| Chelsea station would be called "King's Road Chelsea"
| The double-ended station "{{Stnlnk|Euston}} King's Cross {{Stnlnk|St. Pancras}}" would serve King's Cross as well as Euston and St. Pancras
|{{LUL stations|station=Turnpike Lane}} would be served instead of {{LUL stations|station=Wood Green}}
| The other branch from Angel would serve Hackney, {{Stnlnk|Tottenham Hale}} and {{Stnlnk|Cheshunt}}.
}}

In March 2016, the National Infrastructure Commission said that Crossrail 2 should be taken forward "as a priority" and recommended that a bill should pass through Parliament by 2019 with the line opening by 2033.[48]

Support and opposition

Support

The Mayor of London, Sadiq Khan supports the proposal,[49] as does the Secretary of State for Transport, Chris Grayling.[50]

Many local authorities in South-east England and London released a letter on 13 April 2017, expressing their support for Crossrail 2.[51] ITV news reported in April 2017 that "dozens of MPs" supported Crossrail 2.[52]

After TfL conducted a public consultation in 2017. It was reported by the Fitzrovia Partnership that 96% of respondents supported Crossrail 2 and 80% of respondents preferred the broader of the two options, the Regional option.[53]

The London Chamber of Commerce announced it support in July 2017 with the Greater Manchester Chamber of Commerce announced support for Crossrail 2 in September 2017.[54][55]

Opposition

In 2014, Transport for London announced that the site of the art-house Curzon cinema in Soho had been identified as an area that "may be required to enable the construction of a Crossrail 2 ticket hall" and that "plans for the above site redevelopment may include a replacement cinema".[56] In 2015, the chairman of the "Save Soho" campaign group called the development "deeply worrying".[57]

The plans for Wimbledon station involve the redevelopment of parts of Wimbledon town centre, including the Centre Court shopping centre.[58] Merton Council issued a seven-page cross-party objection to the plans.[59]

There was only a short interval between the announcements of the confirmation of continued government support for Crossrail 2 in 2017, and of the scaling back of proposed railway electrification projects which would particularly benefit Wales and Northern England. Money has been earmarked in the longer term to match London's large forecast population growth. All such forecasts rely on assumptions in terms of where people will wish to live, jobs will be created and housing targets have been set accordingly for 2015-2030,[60][61][62] in contrast to the low growth forecast for the rest of England, all of which could be altered by government policy. Greater Manchester mayor Andy Burnham considered that the in-principle spending decision gives undue and unbalanced priority to London and South East England over other parts of the United Kingdom.[63]

External links

{{commonscat|position=left}}

References

1. ^{{cite news |first=Tom |last=Edwards |title=Crossrail 2 stations proposed by London business leaders |date=5 February 2013 |url=https://www.bbc.co.uk/news/uk-england-london-21333361 |work=BBC News |accessdate=8 March 2013}}
2. ^{{cite web |url=http://londonfirst.co.uk/wp-content/uploads/2013/02/LF_CROSSRAIL2_REPORT_AW_Single_Pages.pdf |format=PDF |title=Crossrail 2: Supporting London's Growth |date=February 2013 |publisher=London First |accessdate=18 February 2013 |archive-url=https://web.archive.org/web/20130213150411/http://londonfirst.co.uk/wp-content/uploads/2013/02/LF_CROSSRAIL2_REPORT_AW_Single_Pages.pdf |archive-date=13 February 2013 |dead-url=yes |df=dmy-all }}
3. ^{{cite web|url=https://crossrail2.co.uk/next-steps/|title=Next steps|website=Crossrail 2}}
4. ^[https://www.google.com/hostednews/ukpress/article/ALeqM5jIAOTHp_Bepjb9ONroG3iXpAWPrg?docId=B18728101292504824A00003 New lines 'may be needed to beat train overcrowding'] Press Association
5. ^{{cite news|url=http://www.transportxtra.com/magazines/local_transport_today/news/25199|title=HS2 fuels Crossrail 2 business case|accessdate=30 March 2018|publisher=Transport News - Publications > Local Transport Today|date=21 December 2010}}
6. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/ |title= Citizen Space - Crossrail 2 - October 2015 |accessdate=22 November 2015}}
7. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/s12b.pdf|title=Clarification information Tooting and Balham: S12B |accessdate=21 November 2015}}
8. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/s3.pdf |title=Crossrail 2 factsheet: Seven Sisters station |accessdate=23 November 2015}}
9. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/s2.pdf |title=Crossrail 2 factsheet: Seven Sisters to New Southgate Route Options |accessdate=21 November 2015}}
10. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/g7.pdf |title=Crossrail 2 train maintenance depots and stabling |accessdate=23 November 2015}}
11. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/ne1.pdf |title=Crossrail 2 factsheet: Services at Broxbourne, Cheshunt and Waltham Cross |accessdate=23 November 2015}}
12. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/ne2.pdf |title=Crossrail 2 factsheet: Services between Enfield Lock and Tottenham Hale |accessdate=23 November 2015}}
13. ^{{cite web |url=http://www.londonreconnections.com/2013/the-transport-committee-crossrail-and-the-overground-talk-shop |title=The Transport Committee: Crossrail and the Overground Talk Shop |date=7 March 2013 |publisher=London Reconnections |accessdate=7 March 2013}}
14. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/crossrail-2-regional-route-png-.png |title=Crossrail 2 route |accessdate=21 November 2015}}
15. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/sw1.pdf |title=Crossrail 2 factsheet: Services at New Malden, Motspur Park and Raynes Park |accessdate=23 November 2015}}
16. ^{{cite web|url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/sw3.pdf |title=Crossrail 2 factsheet: Services between Malden Manor and Chessington South |accessdate=23 November 2015}}
17. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/sw2.pdf |title=Crossrail 2 factsheet: Services between Worcester Park and Epsom |accessdate=23 November 2015}}
18. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/sw4.pdf |title=Crossrail 2 factsheet: Services between Berrylands and Hampton Court |accessdate=23 November 2015}}
19. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/user_uploads/sw5.pdf |title=Crossrail 2 factsheet: Services between Norbiton, Kingston and Shepperton |accessdate=23 November 2015}}
20. ^{{cite web |title=Crossrail 2 Consultation Report |url=http://www.tfl.gov.uk/assets/downloads/corporate/crossrail_2_Consultation_Report.pdf |work=Transport for London Website |author=Steer Davies Gleave |page=1 |date=October 2013 |accessdate=29 November 2013}}
21. ^{{cite web |title=Crossrail 2 Consultation Report |url=http://www.tfl.gov.uk/assets/downloads/corporate/crossrail_2_Consultation_Report.pdf |work=Transport for London Website |author=Steer Davies Gleave |page=18 |date=October 2013 |accessdate=29 November 2013}}
22. ^{{cite web |title=Crossrail 2 June 2014 |url=https://consultations.tfl.gov.uk/crossrail/june-2014 |website=TfL Consultations Portal |publisher=Transport for London |accessdate=5 July 2014}}
23. ^{{cite web |url=https://tfl.gov.uk/info-for/media/press-releases/2015/public-consultation-begins-on-transformative-crossrail-2 |title=Public consultation begins on 'transformative' Crossrail 2 }}{{dead link|date=December 2017 |bot=InternetArchiveBot |fix-attempted=yes }}
24. ^{{cite web |url=https://consultations.tfl.gov.uk/crossrail2/october2015/ |title=Crossrail October 2015}}
25. ^{{cite web|url=http://www.dorkingandleatherheadadvertiser.co.uk/Consultation-report-recommends-Crossrail-extend/story-28485062-detail/story.html?platform=hootsuite|title=Consultation report recommends Crossrail could extend to Dorking|date=January 2015}}{{dead link|date=February 2018 |bot=InternetArchiveBot |fix-attempted=yes }}
26. ^{{cite web|url=http://crossrail2.co.uk/funding/|title=Funding - Crossrail 2|publisher=}}
27. ^{{cite web|url= https://www.standard.co.uk/news/transport/alarm-as-crossrail-2-may-not-be-completed-until-the-2040s-a3649051.html|title= Alarm as Crossrail 2 'may not be completed until the 2040s' |author= Jonathan Prynn |publisher= Evening Standard |date= 3 October 2017 |accessdate= 12 October 2017}}
28. ^{{cite |url=https://www.gov.uk/government/publications/budget-2016-documents/budget-2016 |title=Budget 2016 |publisher= HM Treasury |date=16 March 2016}}
29. ^{{cite |url=https://www.gov.uk/government/publications/autumn-budget-2017-documents/autumn-budget-2017 |title=Autumn Budget 2017 |publisher= HM Treasury |date=22 November 2017}}
30. ^{{cite |url=https://www.gov.uk/government/news/grayling-progress-on-transpennine-route-upgrade-and-crossrail-2-to-advance-in-lockstep |title=Grayling: progress on Transpennine route upgrade and Crossrail 2 to advance in lockstep |publisher=Department for Transport |date=2 March 2018}}
31. ^Mayor of London https://www.london.gov.uk/what-we-do/planning/implementing-london-plan/mayoral-community-infrastructure-levy
32. ^{{Cite web|url=http://www.davros.org/rail/culg/future.html#chelsea|title=Technical information about the Chelsea-Hackney Line|first=Clive|last=Feather|accessdate=7 March 2008}}
33. ^{{Cite web | title = Consultation on safeguarding revision for the Chelsea-Hackney line | publisher=Department for Transport | url = http://www.dft.gov.uk/consultations/archive/2007/consulchelhackney/consulchelhackmain?page=2#a1006 | accessdate = 18 October 2007}}
34. ^{{Cite news|work=The Times |location=UK |title=London Transport plans third new Tube Line|date=2 January 1970}}
35. ^{{Cite web |title=London East West Study |publisher=Shadow Strategic Rail Authority |year=2000 |url=http://www.crossrail.co.uk/80256B090053AF4C/Files/context16/$FILE/eastwest.pdf |deadurl=yes |archiveurl=https://web.archive.org/web/20071013222430/http://www.crossrail.co.uk/80256B090053AF4C/Files/context16/%24FILE/eastwest.pdf |archivedate=13 October 2007 |df=dmy }}
36. ^{{cite web |url=http://www.thisislondon.co.uk/standard/article-23681951-crossrail-will-eat-money-kill-it-boris-and-save-the-bankrupt-tube-instead.do |archiveurl=https://web.archive.org/web/20121018173913/http://www.standard.co.uk/news/crossrail-will-eat-money-kill-it-boris-and-save-the-bankrupt-tube-instead-6761783.html |archivedate=18 October 2012 |title=Crossrail will eat money. Kill it, Boris, and save the bankrupt Tube instead |newspaper=Evening Standard |accessdate=30 September 2015}}
37. ^Trouble Up The (Dalston) Junction – The Difficulties of Safeguarding, London Reconnections
38. ^{{Cite web |url=http://www.rbkc.gov.uk/rbkcdirect/chelseahackney/ch0309.asp |title=Chelsea-Hackney Line: first on the agenda |publisher=Royal Borough of Kensington and Chelsea |date=October 2003 |accessdate=18 October 2007}}
39. ^[https://www.webarchive.org.uk/wayback/archive/20110414221201/http://www.crossrail.co.uk/assets/library/document/c/original/chelsea_hackney_safeguarding_directions_june_2008_part_11.pdf Chelsea–Hackney Line Safeguarding Directions, June 2008 Part A] (PDF), Crossrail, accessed 22 December 2010
40. ^[https://www.webarchive.org.uk/wayback/archive/20110414221205/http://www.crossrail.co.uk/assets/library/document/c/original/chelsea_hackney_safeguarding_directions_june_2008_part_21.pdf Chelsea–Hackney Line Safeguarding Directions, June 2008 Part B] (PDF), Crossrail, accessed 22 December 2010
41. ^Consultation on safeguarding revision of the Chelsea Hackney Line – outcome report, Department for Transport
42. ^{{Cite web|url = http://www.networkrail.co.uk/browse%20documents/rus%20documents/route%20utilisation%20strategies/rus%20generation%202/london%20and%20south%20east/london%20and%20south%20east%20route%20utilisation%20strategy.pdf|title=London and South East Route Utilisation Strategy (section 8.5)|publisher=Network Rail|date=July 2011|accessdate=11 February 2012}}
43. ^{{Cite web|url=http://www.transportxtra.com/magazines/local_transport_today/news/?id=28776|title=Metro or regional rail? TfL maps Crossrail 2 options|publisher=TransportXtra|date=18 November 2011|accessdate=11 February 2012}}
44. ^{{cite web|title=Crossrail 2 project could include Woking and Guildford stations|url=http://www.964eagle.co.uk/news/local-news/1675580/crossrail-2-project-could-include-woking-and-guildford-stations/|website=96.4 Eagle Radio|accessdate=17 July 2015}}
45. ^{{cite web|title=Crossrail 2 supporting London's growth: Final report of London's first Crossrail task force|url=http://londonfirst.co.uk/wp-content/uploads/2013/02/LF_CROSSRAIL2_REPORT_AW_Single_Pages.pdf|website=londonfirst.co.uk|accessdate=16 April 2017|archive-url=https://web.archive.org/web/20161019234108/http://londonfirst.co.uk/wp-content/uploads/2013/02/LF_CROSSRAIL2_REPORT_AW_Single_Pages.pdf|archive-date=19 October 2016|dead-url=yes|df=dmy-all}}
46. ^{{cite web|title=Crossrail 2 supporting London's growth: Final report of London's first Crossrail task force|url=http://www.breakingtravelnews.com/news/article/network-rail-crossrail-2-vital-to-londons-economic-growth/|website=lbreakingtravelnews.com|accessdate=16 April 2017}}
47. ^{{cite web|title=Michèle Dix takes over as Crossrail 2 chief, receives CBE|url=http://www.uitp.org/news/mich%C3%A8le-dix-takes-over-crossrail-2-chief-receives-cbe|publisher=Union Internationale des Transports Publics|language=en}}
48. ^{{cite web|url=http://www.railtechnologymagazine.com/Rail-News/crossrail-2-must-be-developed-as-a-priority-and-delivered-by-2033--nic |title=Crossrail 2 must be developed ‘as a priority’ and delivered by 2033 – NIC}}
49. ^{{cite web |date=28 October 2014 |title=‘Crossrail 2 vital to support London’s growth’, says Mayor |url=https://www.london.gov.uk/press-releases-6360 |location=London |accessdate=16 April 2016}}
50. ^{{cite web|url= https://www.theguardian.com/uk-news/2017/jul/24/transport-secretary-backs-crossrail-2-plan |title= Transport secretary's backing for Crossrail 2 sparks anger outside London |author= Gwyn Topham|publisher= The Guardian |date= 24 July 2017 |accessdate= 26 July 2017}}
51. ^{{cite web|url= https://www.london.gov.uk/press-releases/mayoral/councils-call-on-government-for-crossrail-backing|title= Councils unite to call on government for Crossrail 2 backing |author=|publisher=London.gov.uk |date= 13 April 2017 |accessdate= 12 February 2018}}
52. ^{{cite web|url= http://www.itv.com/news/london/2017-04-21/dozens-of-mps-urged-the-government-to-support-crossrail-2/|title= Dozens of MPs urge the Government to support Crossrail 2 |author=|publisher=ITV News |date= 21 April 2017 |accessdate= 12 February 2018}}
53. ^{{cite web|url= http://fitzroviapartnership.com/news/crossrail-2-announced-and-out-for-consulation/|title= crossrail-2 announced and out for consultation |author=|publisher=FitzroviaPartnership |date= 29 June 2017 |accessdate= 12 February 2018}}
54. ^{{cite web|url= http://www.cityam.com/268994/crossrail-2-latest-mayor-sadiq-khan-and-transport-secretary|title= Crossrail 2 latest: Mayor Sadiq Khan and transport secretary Chris Grayling set out next steps for £31bn rail route|author= Rebecca Smith|publisher= City AM|date= 24 July 2017|accessdate= 12 February 2018|archive-url= https://web.archive.org/web/20180213022332/http://www.cityam.com/268994/crossrail-2-latest-mayor-sadiq-khan-and-transport-secretary|archive-date= 13 February 2018|dead-url= yes|df= dmy-all}}
55. ^{{cite web|url= https://www.bbpmedia.co.uk/news/property-construction/chamber-supports-calls-for-crossrail-2.html|title= Chamber Supports Calls for Crossrail 2|author=|publisher=BBP media|date= 14 September 2017 |accessdate= 12 February 2018}}
56. ^{{cite news |last=Brown |first=Kat |date=30 Dec 2014 |title=Curzon Soho cinema faces demolition for Crossrail |url=https://www.telegraph.co.uk/culture/film/film-news/11317177/Curzon-Soho-cinema-faces-demolition-for-Crossrail.html |newspaper=Daily Telegraph |location=London |accessdate=1 October 2015}}
57. ^{{cite news |last=Topham |first=Gwyn |date=22 September 2015 |title=Celebrities join fight to save Soho's Curzon cinema from Crossrail 2 |url=https://www.theguardian.com/uk-news/2015/sep/22/celebrities-join-fight-to-save-sohos-curzon-cinema-from-crossrail-2-london |newspaper=The Guardian |location=London |accessdate=1 October 2015}}
58. ^{{cite web |url=http://www.wimbledonguardian.co.uk/news/14192801.Crossrail_2_consultation_has_ended__here_is_what_has_been_said_so_far/ |title=Crossrail 2 consultation has ended: here is what has been said so far |website=Wimbledon Guardian |date=8 January 2016}}
59. ^{{cite web |url=http://www.merton.gov.uk/cr2_cross_party_response.pdf |title=CROSSRAIL 2 CONSULTATION: MERTON COUNCIL’S CROSS-PARTY RESPONSE |deadurl=yes |archiveurl=https://web.archive.org/web/20160327155626/http://www.merton.gov.uk/cr2_cross_party_response.pdf |archivedate=27 March 2016 |accessdate=16 September 2016 |df=dmy }}
60. ^https://www.kcl.ac.uk/sspp/policy-institute/publications/Economic-and-demographic-scenarios-for-London-in-2030.pdf
61. ^{{cite web|url=https://www.telegraph.co.uk/finance/economics/12038938/READY-London-to-outpace-New-York-as-City-drives-growth.html|title=London to outpace New York as City drives growth|first=Alan|last=Tovey|date=8 December 2015|publisher=|via=www.telegraph.co.uk}}
62. ^{{cite web|url=https://www.theguardian.com/cities/2015/jan/09/london-booming-population-growth-success-challenges|title=London’s booming: how the city’s population surged past pre-war peak|first=Dave|last=Hill|date=9 January 2015|publisher=|via=www.theguardian.com}}
63. ^{{cite web|url= https://www.bbc.co.uk/news/uk-england-40708531 |title= Crossrail 2: Support by government 'outrageous' after northern snub |publisher= BBC |date= 25 July 2017 |accessdate= 12 October 2017}}
{{Rail infrastructure projects in the United Kingdom|selected=proposed}}{{Chelsea–Hackney line navbox}}

4 : Proposed railway lines in London|Transport in Epping Forest District|Proposed London Underground lines|Underground commuter rail

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/29 18:19:29