词条 | Downsview Park station | ||||||||||||||||||||||||||||||||||
释义 |
| name = Downsview Park {{rail-interchange|toronto|1|size=20}} {{rint|gotransit|rail|E|x|size=20}} | symbol_location = toronto | symbol = | style = TTC | image = Downsview Park Platform.jpg | caption = | address = 1212 Sheppard Ave West, Toronto, Ontario | country = Canada | coordinates = {{coord|43|45|14|N|79|28|42|W|region:ON-CA|display=inline,title}} | owned = | operator = Toronto Transit Commission | line = | platforms = Centre platform | depth = | levels = | tracks = 2 | bus_stands = | bus_operators = | connections = | bus_routes = {{Collapsible list |framestyle=border:none; padding:0; |title={{rail-interchange|toronto|bus}} TTC buses | 1= {{RouteBox|84||#FF2D16|white}} Sheppard West | 2= {{color box|white|101|#FF2D16|border=#FF2D16}} Downsview Park | 3= {{RouteBox|106||#FF2D16|white}} Sentinel | 4= {{RouteBox|107||#FF2D16|white}} St. Regis | 5= {{RouteBox|108||#FF2D16|white}} Driftwood | 6= {{color box|white|384 |#034DA9|border=#034DA9}} Sheppard West | 11= {{RouteBox|984A||#00AA4F|white}} Sheppard West Express }} | structure = | parking = | bicycle = | disabled = Yes | architect = Aedas | architectural_style = Postmodern architecture | status = | code = | zone = | opened = {{Start date|2017|12|17}}[1] | closed = | rebuilt = | passengers = {{formatnum:{{TTC ridership|Downsview Park}}}} | pass_year = {{TTC ridership}} | services = {{S-rail|title=TTC}}{{s-line|system=TTC|line=Yonge–University–Spadina|previous=Finch West|next=Sheppard West}} }} Downsview Park is a rapid transit station on Line 1 Yonge–University of the Toronto subway and a commuter rail station on the Barrie commuter rail line of GO Transit. Subway service began on December 17, 2017, and GO Train service began on December 30, 2017.[2] Downsview Park station is a fully integrated multi-modal transit facility serving both transit lines. This is in contrast to other interchanges between TTC subway and GO Transit rail lines, which have separate structures for each agency. TTC ridership statistics for 2018 showed that Downsview Park was the least used station on the heavy-rail subway system, displacing {{ttcs|Bessarion}} on Line 4 Sheppard. ServicesTTC Line 1 operates every 5 minutes or better all day, every day.[3] The GO Transit Barrie Line operates approximately every 15–30 minutes during the morning peak period, every 30 minutes during the afternoon peak period, and every 60 minutes outside of peak periods including on weekends and holidays.[4] Subway stationNameThe station had been expected to be named "Sheppard West"[5] and was officially referred to by that name during construction.[6] Approval was given in 2010 for the station to be named "Downsview Park", subject to the satisfactory resolution of negotiations between the Toronto Transit Commission, the City of Toronto, and the federally-managed Downsview Park related to property acquisition, and to rename the existing Downsview station to "Sheppard West".[7] DescriptionThe subway platform is underground on an east–west axis parallel to Sheppard Avenue West. It is one of three stations on Line 1 with an east–west orientation, the others being {{ttcs|Union}} and {{ttcs|St. George}}. An intermediate concourse level is located below ground between the subway and GO platforms. GO Transit has committed to cost sharing at this station. Upon its opening, York University GO Station located a short distance to the north experienced a service reduction; only weekday peak period trains service that station, while all trains service Downsview Park GO. A new roadway named Vitti Street on the west side of the station provides vehicle access and passenger pick-up/drop-off.[8] To the east and west of the station, the line swings broadly at a 90° angle northwest to Finch West station and southeast via a compound curve to Sheppard West station. The station is located in a low density district; however, the TTC expects mixed use development on nearby land. The GO train connection is also expected to boost ridership.[9] The station building is constructed of glass, stone, and aluminum blend and has a green roof. It is designed to allow sunlight to reach the subway platform. The artwork Spin by artist Panya Clark Espinal spans the interior's walls, floors, and ceilings. Artist Espinal also created the artwork for Bayview station.[9] The floor of the station at the platform level is constructed using striped terrazzo. Architecture firm Aedas was commissioned to design the station; their initial plan provides twinned entrances on opposite sides of the rail corridor, each with green roofs that resemble landing strips or wings.[10] Fare collectionAs with all stations from {{ttcs|Lawrence West}} north to Vaughan Metropolitan Centre, legacy TTC fare media (tokens and tickets) are accepted at this station, but they cannot be purchased by passengers, who otherwise need to pay exact change for cash fares. Presto cards can be purchased and loaded with funds for single rides or a digital monthly TTC pass for unlimited travel, using various automated machines at the station.[11] {{clear}}GO station{{Infobox station| name = Downsview Park | symbol_location = toronto | symbol = | style = GO Transit | image = | caption = | address = | country = | coordinates = | owned = | operator = GO Transit | line = | other = | platforms = 1[8] (2nd roughed-in) | depth = | levels = | tracks = 1 (2nd planned) | bus_stands = | bus_operators = | connections = {{rail-interchange|toronto|subway|1}} {{rail-interchange|toronto|bus}} | structure = | parking = | bicycle = | disabled = Yes | architect = Aedas | architectural_style = Postmodern architecture | status = | code = {{GO Transit code|DW}} | zone = 19 | opened = {{Start date|2017|12|30}}[12] | closed = | rebuilt = | passengers = | pass_year = | services = {{s-rail|title=GO Transit}}{{s-line|system=GO Transit|line=Barrie|previous=York University|next=Toronto}} }} The GO Transit commuter rail station is at the surface on a north–south axis, perpendicular to the subway line. There is only one platform, but a second is roughed-in and will open after the ongoing construction to double-track the Barrie line is completed.[13] There are separate surface station buildings to serve both platforms after completion. HistoryThe official ground breaking ceremony for the Toronto–York Spadina Subway Extension was held on November 27, 2009,[14] however tunnelling operations did not commence until June 2011.[15] The station opened on December 17, 2017, along with the rest of the extension.[16] It opened to GO Transit service on December 30, 2017, on the same day that a major service increase was inaugurated on the Barrie line.[2] Nearby landmarksNearby landmarks include Downsview Park, which is Canada's National Urban Park and played host to World Youth Day in 2002 and the SARSstock concert in 2003. The Park is site of an airstrip used by aircraft manufacturer Bombardier Aerospace and formerly used as Canadian Forces Base Downsview. Other points of interest include the Chesswood hockey arenas, Toronto FC's BMO training ground, Scotiabank Pond Hockey Arena, and "The Hangar" sports facility, as well as industrial lands north of Sheppard. Surface connections{{Main|List of Toronto Transit Commission bus routes}}A transfer is required to connect between the subway and surface bus routes, as there is no attached bus terminal and connections are made on-street, outside the station. Buses stop on Sheppard Avenue and Vitti Street, about 140 metres from the west station building entrance.[17]
References1. ^{{cite news |url=https://www.thestar.com/news/gta/transportation/2017/12/16/after-delays-cost-overruns-and-tragedy-a-subway-to-vaughan-is-complete.html |title=After delays, cost overruns, and tragedy, a subway to Vaughan is complete |last1=Beattie |first1=Samantha |last2=Spurr |first2=Ben |newspaper=Toronto Star |date=December 16, 2017 |accessdate=December 17, 2017}} 2. ^1 {{cite web |title=More Barrie GO Trains |url=http://www.gotransit.com/public/en/news/barrie/servicechanges.aspx |work=GO Transit |archive-url=https://web.archive.org/web/20171213144217/http://www.gotransit.com/public/en/news/barrie/servicechanges.aspx |archive-date=December 13, 2017}} 3. ^{{cite web |url=http://www.ttc.ca/Subway/Stations/Downsview_Park/station.jsp |title=TTC Downsview Park |author= |date=n.d. |website=ttc.ca |publisher=Toronto Transit Commission |access-date=December 20, 2017}} 4. ^{{cite web |url=https://www.gotransit.com/static_files/gotransit/assets/pdf/TripPlanning/FullSchedules/05012019/Table65.pdf |title=Barrie Line - table 65 |date=January 5, 2019 |website=gotransit.com |publisher=GO Transit |access-date=February 22, 2019}} 5. ^{{cite web |url=https://www.thestar.com/news/gta/article/731742--ttc-breaks-ground-on-subway-extension |title=TTC breaks ground on subway extension |first=Tess |last=Kalinowski |date=November 27, 2009 |publisher=Toronto Star |accessdate=January 16, 2013}} 6. ^{{cite web |url=http://www3.ttc.ca/Spadina/Stations/Sheppard_West_Station/index.jsp |title=TTC Sheppard West Station |publisher=Toronto Transit Commission |accessdate=January 16, 2013 |work=ttc.ca |dead-url=no |archive-url=http://web.archive.org/web/20130127210247/http://www3.ttc.ca/Spadina/Stations/Sheppard_West_Station/index.jsp |archive-date=January 27, 2013}} 7. ^{{cite web |url=http://www3.ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2010/Sept_30_2010/Supplementary_Reports/Toronto_York_Spadina.pdf |title=Toronto-York Spadina Subway Extension, Station Names |date=September 30, 2010 |publisher=Toronto Transit Commission |accessdate=January 16, 2013}} 8. ^1 {{cite web |url=http://www3.ttc.ca/PDF/About_the_TTC/TYSSE/_Sheppard_West_Display_Boards_Open_House_REV.pdf |title=Sheppard West Subway Station Open House |work=Toronto-York Spadina Subway Extension |publisher=Toronto Transit Commission |accessdate=January 16, 2013}} 9. ^1 {{cite news |url=https://www.thestar.com/news/gta/2017/01/23/ttcs-newest-subway-extension-taking-shape.html |title=TTC's newest subway extension taking shape |newspaper=Toronto Star |first=Ben |last=Spurr |date=January 23, 2017 |accessdate=February 11, 2017}} 10. ^{{cite web |url=http://www3.ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2009/September_24_2009/Reports/Toronto_York_Spadina1.pdf |title=Sheppard West Station, Approval Of Conceptual Design |date=September 24, 2009 |work=Toronto-York Spadina Subway Extension Project |publisher=Toronto Transit Commission |accessdate=January 16, 2013}} 11. ^{{cite web |url=http://www.ttc.ca/Fares_and_passes/PRESTO/New_Customer_Service_Agents_at_TTC_stations.jsp |title=New Customer Service Agents at TTC stations |publisher=Toronto Transit Commission |accessdate=February 18, 2018}} 12. ^{{cite news |url=http://toronto.citynews.ca/2017/12/30/first-go-train-downsview-park-station/ |title=First GO train rolls through new Downsview Park station |work=CityNews Toronto |date=December 30, 2017 |accessdate=December 31, 2017}} 13. ^{{cite web |url=http://www.metrolinx.com/en/regionalplanning/rer/20170511_Barrie_NoticeofCommencement_EN.pdf |work=Metrolinx |title=Notice of Commencement and Public Engagement Barrie Rail Corridor Expansion Transit Project Assessment Process |date=May 11, 2017 |accessdate=December 30, 2017}} 14. ^{{cite web |url=http://www.railwaygazette.com/news/single-view/view/toronto-york-spadina-subway-extension-breaks-ground.html |title=Toronto-York Spadina Subway Extension breaks ground |date=November 30, 2009 |publisher=Railway Gazette |accessdate=January 16, 2013}} 15. ^{{cite web |url=http://www.ttc.ca/News/2011/June/0617_boring_begins.jsp |title=Tunnel boring for Toronto-York Spadina Subway Extension begins |date=June 17, 2011 |publisher=Toronto Transit Commission |accessdate=January 16, 2013}} 16. ^{{cite web |url=http://globalnews.ca/news/3720622/ttc-toronto-york-spadina-subway-extension-opening/ |title=Toronto-York Spadina Subway Extension scheduled to open in mid-December |date=September 5, 2017 |first=Nick |last=Westoll |work=Global News |access-date=September 6, 2017}} 17. ^{{cite web |url=http://ttc.ca/TTC_Surveys/Subway_Access_Adjust.jsp |title=Bus Route Changes |publisher=Toronto Transit Commission |accessdate=February 22, 2019}} External links{{Commons category-inline|Downsview Park Station}}{{GO Station|DW}}
5 : Line 1 Yonge–University stations|GO Transit railway stations|Railway stations opened in 2017|Toronto Transit Commission stations located underground|2017 establishments in Ontario |
||||||||||||||||||||||||||||||||||
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。