请输入您要查询的百科知识:

 

词条 Downtown MRT line
释义

  1. Overview

  2. History

     Notable incidents 

  3. Stations

  4. Rolling stock

  5. Train control

  6. External links

  7. References

{{hatnote|Not to be confused with the Downtown MRT station, which the Downtown line trains call at.}}{{Use dmy dates|date=August 2017}}{{Infobox rail line
| name =
Downtown line
| native_name = {{lang-ms|Laluan MRT Pusat Bandar}}
{{lang-zh|滨海市区地铁线}}
{{lang-ta|டவுன்டவுன் எம்ஆர்டி வழி}}
| color = {{SMRT color|Downtown}}
| logo = File:Downtown_Line_logo.png
| logo_width =
| image = Exit C of Downtown MRT Station.jpg
| image_width = 300px
| caption = Downtown MRT station, one of the 34 stations on the line.
| type = Rapid transit
| system = Mass Rapid Transit (Singapore)
| status = Operational (Stages 1, 2 & 3)
Under construction (Stage 3e)


Under planning (Hume)


| start = Bukit Panjang
| end = Expo
Sungei Bedok (2024)
| stations = 34 (Operational) [1]
2 (Under construction)
1 (Under planning)
| routes = 1
| daily_ridership = 470,000 (Q1 2018)
| open = {{start date and age|df=yes|2013|12|22}} (Stage 1)
{{start date and age|df=yes|2015|12|27}} (Stage 2)
{{start date and age|df=yes|2017|10|21}} (Stage 3)
| planopen ={{start date and age|df=yes|2024}} (Stage 3e)
{{start date and age|df=yes|2025}} (Hume)
| close =
| owner = Land Transport Authority
| operator = SBS Transit DTL[1]

| character = Fully Underground
| stock = C951/C951A| linelength = {{convert|41.9|km|mi|abbr=on}} (Operational)[1]
{{convert|2.2|km|mi|abbr=on}} (Under construction)
| tracklength =
| tracks =
| gauge = {{track gauge|sg|allk=on}}
| electrification = 750 V DC Third rail
| speed = limit of 80 km/h
| elevation =
| map =
| map_state = collapsed
| depot = Gali Batu
Tai Seng
East Coast (Future)
}}

The Downtown line (DTL) is a medium-capacity Mass Rapid Transit line in Singapore. It runs from Bukit Panjang in the north-west to Expo in the east. Currently, the line is {{convert|41.9|km|mi}} long and has 34 stations, all of which are underground. The line is coloured blue on the rail map.[1]

The original line was built in 3 stages, which opened in 2013, 2015 and 2017 respectively.[2][3][4][5] Stage 3e, an extension of the line to Sungei Bedok, is under construction and will be completed in 2024,[6] and Hume MRT station is planned to open in 2025.[10] The line connects the North-Western and Central-Eastern regions to downtown Singapore.

This line is the fifth MRT line on the network to be opened, the third to be entirely underground, and, with 3-car trains, the second medium-capacity line after the Circle line. When fully completed in 2024, the line will be about {{convert|44|km|mi}} long with 36 stations, and will serve more than half a million commuters daily.[7] It will also be the longest rapid transit line in Singapore to use completely automated, driverless trains,[8] the longest of such lines in the world and the longest rapid transit line in South East Asia.[9] Travelling from one end to the other will take around 67 minutes. It is the second MRT line to be operated by SBS Transit after the North East line.

Overview

{
  "type": "ExternalData",  "service": "geoline",  "ids": "Q2313458",  "properties": {    "stroke": "#005ec4",    "stroke-width": 6  }

}

The line begins in Bukit Panjang, and then goes through the ‘school district’ and food enclaves of Bukit Timah before entering the central area, passing through Little India before reaching the Central Business District via Bugis and Chinatown. After this, it goes to Fort Canning, Geylang Bahru and MacPherson after intersecting itself.

The line then goes eastwards through the industrial areas of Kampong Ubi and Kaki Bukit, before continuing towards the Tampines Regional Centre and ending at Changi Business Park.

Connecting the Downtown line to the Thomson–East Coast line, the DTL3 extension (DTL3e) improves public transport accessibility to the Changi Business Park and Expo area.[10]

History

On 14 June 2005, the Land Transport Authority announced the Downtown extension of the Circle line to serve the Downtown at Marina Bay area, where an integrated resort (Marina Bay Sands) and Singapore's second botanical garden (Gardens by the Bay) was to be located. The 3.4-kilometre fully underground line was estimated to cost S$1.4 billion. Construction of the extension began in January 2008. During the construction of the North East line at Chinatown station, platform provisions were built to facilitate an interchange station. In August 2011, SBS Transit won the bid and was appointed the operator of the Downtown line, under a new framework which would see the authority remaining the owner of the line.[11]

The original line was built in 3 stages, as follows:

Stage 1 of the Downtown line, stretching {{convert|4.3|km|mi|adj=on}}, began service on 22 December 2013,[12] with its official inauguration made on the day before by Prime Minister Lee Hsien Loong.[13]

Stage 2 of the Downtown line was first conceptualized and announced as the Bukit Timah line. It was supposedly a 20-kilometre line that would connect the new downtown with the Bukit Panjang, Upper Bukit Timah and Bukit Timah corridor, alleviating the heavy traffic travelling along the sector, but a full route was released. Provisions were provided at Nicoll Highway station which would have seen the line terminating there and interchanging with the Circle line.[14] However, the Nicoll Highway collapse and subsequent feasibility works and deemed the old station unusable.[15] The stage is {{convert|16.6|km|mi|adj=on}} long with 12 stations connecting Bukit Panjang and Rochor stations, including four interchange stations. Construction for Stage 2 began on 3 July 2009 with a groundbreaking ceremony at Beauty World station.[16][17][18]

In October 2014, it was announced that Stage 2's opening would be pushed back to the first quarter of 2016. It had to be delayed when main contractor Alpine Bau went bankrupt in mid-2013.[19] On 28 June 2015, Transport Minister Lui Tuck Yew announced that the delay was "completely resolved" by the authorities and Stage 2's opening date was reverted to 27 December 2015.[20]

Stage 3 of the Downtown line goes from Chinatown to Expo. The station locations and finalized route were unveiled on 20 August 2010.[21] Stage 3 of the Downtown line is {{convert|21|km|mi|adj=on}} long and serve 16 stations.[8] It started operations on 21 October 2017, officially opened by the Transport Minister Khaw Boon Wan.[22]

To serve the line, the Gali Batu Depot was opened in December 2015 to stable 42 trains. It is situated at part of the former Kwong Hou Sua Teochew Cemetery off Woodlands Road.[23] Also in February that year, the Land Transport Authority announced that the capacity of the depot will be expanded to stable 81 trains by 2019.[24]

Final costs of building the line may reach an estimated about S$20.7 billion, up more than 70% from an initial estimation of S$12 billion.[25] In January 2013, plans for a southern extension which will run from Expo through the East Coast area, interchanging with the Thomson–East Coast line were announced for completion by 2025.[26] On 31 May 2017, LTA announced that Stage 3 of the Downtown line will commence operations on 21 October 2017.[27]

DTL3e was announced on 15 August 2014, in conjunction with the announcement of the Thomson–East Coast MRT line.[28] Two stations, Xilin MRT station and Sungei Bedok MRT station will be added to the Downtown Line, with Sungei Bedok as an interchange station with the Thomson–East Coast line. It will add an additional {{convert|2.2|km|abbr=on}} to the line with the extension.[28] Due in 2024, Stage 3e will join the current East West and future Thomson–East Coast lines that runs through Marine Parade.[29]

On 7 March 2019, Hume station was announced to be opened by 2025 to better serve Hillview residents. [30]

Notable incidents

A malfunction in the platform screen doors at Botanic Gardens MRT station resulted in trains bypassing the station and a seven-hour disruption on Wednesday, 3rd May 2017. Downtown line operator SBS Transit said that the doors malfunctioned at 5.45am due to a signalling-related fault, and could not open automatically. The fault was rectified at 12.54pm and the platform opened for passenger service, with the affected door remaining closed for repairs.[31]

Stations

{{main|List of Downtown MRT line station names}}{{MRT route/Downtown|navbar=1|legend=0|collapse=no}}
Station numberStation nameImageInterchange and notesDistance (km)

between stations

Total

Distance (km)

DT|1|BP|6}}Bukit Panjang{{fontcolor>#748477|Bukit Panjang LRT}}0.00.0
DT|2}}Cashew1.21.2
DT|3}}Hillview0.92.1
DT|4}}HumeOpening by 2025N/AN/A
DT|5}}Beauty World2.64.7
DT|6}}King Albert Park1.25.9
DT|7}}Sixth Avenue1.67.5
DT|8}}Tan Kah Kee1.38.8
DT|9|CC|19}}Botanic Gardens{{fontcolor>#ff9a00|Circle line}}1.19.9
DT|10|TE|11}}Stevens{{fontcolor>#734538|Thomson–East Coast line}} (2021)1.111
DT|11|NS|21}}Newton{{fontcolor>#dc241f|North South line}}1.612.6
DT|12|NE|7}}Little India{{fontcolor>#9016b2|North East line}}1.414
DT|13}}Rochor0.514.5
DT|14|EW|12}}Bugis{{fontcolor>#009530|East West line}}0.815.3
DT|15|CC|4}}Promenade{{fontcolor>#ff9a00|Circle line}}0.916.2
DT|16|CE|1}}Bayfront{{fontcolor>#ff9a00|Circle line}} extension1.318.4
DT|17}}Downtown0.919.3
DT|18}}Telok Ayer0.619.9
DT|19|NE|4}}Chinatown{{fontcolor>#9016b2|North East line}}0.620.5
DT|20}}Fort Canning1.021.5
DT|21}}Bencoolen1.022.5
DT|22}}Jalan Besar0.923.4
DT|23}}Bendemeer1.324.7
DT|24}}Geylang Bahru1.426.1
DT|25}}Mattar1.527.6
DT|26|CC|10}}MacPherson{{fontcolor>#ff9a00|Circle line}}0.828.4
DT|27}}Ubi1.129.5
DT|28}}Kaki Bukit1.230.7
DT|29}}Bedok North1.131.8
DT|30}}Bedok Reservoir1.833.6
DT|31}}Tampines West1.735.3
DT|32|EW|2}}Tampines{{fontcolor>#009530|East West line}}1.336.6
DT|33}}Tampines East1.438
DT|34}}Upper Changi2.640.6
DT|35|CG|1}}Expo{{fontcolor>#009530|East West line}}'s Changi Airport branch line0.941.5
Downtown line extension (under construction, to be ready by 2024)
DT|36}}Xilin
DT|37|TE|31}}Sungei BedokInterchange with the {{fontcolor|#734538|Thomson–East Coast line}} (2024)From Expo

2.2

44.1

Rolling stock

Currently, the Downtown line has one type of rolling stock, the Bombardier MOVIA C951 cars,[32] running in a three-car formation. They are stabled at Gali Batu Depot after it opened with Stage 2 of Downtown line on 27 December 2015. For the period between the operation of Downtown line stage 1 and Downtown line stage 2, trains were stabled at a maintenance facility that was built at Marina Bay as part of the Circle line project. Kim Chuan Depot housed the Operations Control Centre for the Downtown Line Stage 1 until Gali Batu Depot was ready to be used.[33]

On 12 October 2012, the first of 11 trains for the Downtown line stage 1 arrived at Jurong Port. It was transported to Kim Chuan Depot to undergo testing by LTA before it was handed over to SBS Transit.[34] {{As of|2013|2|28}}, Bombardier had delivered five of the 11 trains for Downtown line stage 1.[35] LTA together with the operator, SBS Transit, conducted the necessary tests to ensure safety standards, functional performance and systems compatibility requirements were met before revenue service began on 22 December 2013.[36]

Testing on the Downtown line stage 2 began on 25 October 2015 and rolling stock that was delivered to Gali Batu Depot have commenced service on stage 1 starting on 21 October 2015. Kim Chuan Depot, together with the adjacent Tai Seng Facility Building operated on a minor capacity until the Downtown line stage 3 opened. A new depot, named the East Coast Integrated Depot will provide additional stabling capacity to the line in 2024.[37]

Testing on the Downtown line stage 3 began on 15 August 2017, after the late opening of Downtown line from 27 May 2017. [38] Most of the remaining rolling stock entered revenue service progressively from that date onwards. Testing on DTL Stage 3 was restricted from Fort Canning to Expo from 19 September 2017.

Train control

The Downtown line is equipped with Siemens (previously Invensys before Siemens acquisition) Trainguard Sirius Communications-based train control (CBTC) moving block signalling system with Automatic train control (ATC) under Automatic train operation (ATO) GoA 4 (UTO).[39][40] The subsystems consist of Automatic train protection (ATP) to govern train speed, Controlguide Rail 9000 Automatic Train Supervision (ATS) to track and schedule trains and Trackguard Westrace MK2 Computer-based interlocking (CBI) system that prevents incorrect signal and track points to be set.[41][42]

A fall-back signalling system, relying on conventional track-circuit occupancy detection, is included to ensure fully automatic operation and train protection independent of the radio system.

Platform screen doors by Faiveley[43] provide safety for passengers, offering protection from arriving and departing trains.[44]

External links

  • Downtown Line
  • [https://downtown-line.blogspot.sg/2014/01/dt4-sneak-peek.html Downtown Line Construction]

References

1. ^{{cite web | url = http://www.sbstransit.com.sg/download/annDTL.pdf | title = Company Announcement – Incorporation of a {{sic|hide=y|Wholly|-Owned}} Subsidiary}}
2. ^{{cite web | url=http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=38d69635-0cb4-4b81-aa01-4182756bc58e | title=The Rail Report: 12 stations of Downtown Line 2 to Open on 27 December | publisher=Land Transport Authority | date=6 August 2015}}
3. ^{{cite web | url=http://www.channelnewsasia.com/news/singapore/downtown-line-2-to-open/1945760.html | title=Downtown Line 2 to open ahead of schedule in December: Transport Minister Lui | publisher=Channel NewsAsia | date=28 June 2015}}
4. ^{{cite web | url = https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=a3eeda54-6d2e-451e-8aa2-a7e3acef0e48 | title = Joint News Release by the Land Transport Authority (LTA) & SBS Transit – Train Services on Downtown Line to Start Later at 7.30am on Sundays to Facilitate Systems Integration Testing | publisher = Land Transport Authority | date = 26 April 2017}}
5. ^{{cite web | url = https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=5c4e424c-1a46-44cb-92d0-212e37a2b6df | title = Factsheet: Downtown Line 3 to Open on 21 October 2017 | publisher = Land Transport Authority | date = 31 May 2017}}
6. ^{{cite web | url = https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line-3-extension.html | title = Downtown Line 3 Extension | publisher = Land Transport Authority | accessdate = 28 April 2017}}
7. ^"More Trains, More Capacity, More Often", Land Transport Authority
8. ^{{cite web|url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/stages.html |title=Projects – Downtown Line – Stages |publisher=Land Transport Authority of Singapore |date=17 December 2013 |accessdate=23 June 2014 |deadurl=yes |archiveurl=https://web.archive.org/web/20140703122517/http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/stages.html |archivedate=3 July 2014 |df= }}
9. ^{{Cite news|url=http://www.masstransitmag.com/press_release/10815643/bombardier-announces-delivery-of-first-fully-automated-metro-for-singapore-downtown-line|title=Bombardier Announces Delivery of First Fully Automated Metro for Singapore Downtown Line|work=Mass Transit|access-date=2018-02-10|language=en}}
10. ^{{cite web | url = https://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/overview.html | title= Downtown Line Overview }}
11. ^LTA Appoints SBS Transit Limited to Operate Downtown Line under New Rail Financing Framework {{webarchive|url=https://web.archive.org/web/20111121205729/http://app.lta.gov.sg/corp_press_content.asp?start=659z82u5jocnrr4j4it759812yw2etknbsr66ucn2jd67avxjm |date=21 November 2011 }} Land Transport Authority – 29 August 2011
12. ^{{cite web|url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/stages.html |title=Downtown Line |work=Land Transport Authority |accessdate=22 December 2013 |deadurl=yes |archiveurl=https://web.archive.org/web/20140703122517/http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/stages.html |archivedate=3 July 2014 |df= }}
13. ^{{cite web | url=http://www.straitstimes.com/breaking-news/singapore/story/downtown-line-stage-1-officially-opened-pm-lee-20131221 | title=Downtown Line Stage 1 officially opened by PM Lee | publisher=The Straits Times | date=21 December 2013 | accessdate=22 December 2013}}
14. ^{{cite news |title=Circle Line Linking All Lines |author=Land Transport Authority |date=24 January 2014 |work=The Straits Times |page=50}}
15. ^{{cite web|url=http://www.channelnewsasia.com/stories/singaporelocalnews/view/272864/1/.html |archive-url=https://archive.is/20121209113025/http://www.channelnewsasia.com/stories/singaporelocalnews/view/272864/1/.html |dead-url=yes |archive-date=9 December 2012 | title= Govt approves S$12b MRT Downtown Line to be built by 2018 }}
16. ^"Groundwork begins for new MRT lines", Christopher Tan, The Straits Times, 13 March 2006
17. ^"LTA unveils locations of DTL stage 2 stations" {{webarchive|url=https://web.archive.org/web/20080813151257/http://www.straitstimes.com/Latest%2BNews/Singapore/STIStory_257916.html |date=13 August 2008 }}, Christopher Tan, The Straits Times, 15 July 2008
18. ^"Work on MRT Downtown Line Phase 2 Starts", Tyler Thia, Channel NewsAsia, 3 July 2009
19. ^{{cite web|url=http://www.todayonline.com/singapore/stage-2-downtown-line-open-first-quarter-2016|title=Stage 2 of Downtown Line to open in first quarter 2016|website=TODAYonline|access-date=16 May 2016}}
20. ^{{cite web|url=http://www.straitstimes.com/news/singapore/more-singapore-stories/story/thumbs-downtown-lines-earlier-opening-20141003|title=Thumbs Up For Downtown Line's Earlier Opening|website=The Straits Times}}
21. ^Downtown Line 3 station Locations Unveiled {{webarchive|url=https://web.archive.org/web/20110621220847/http://app.lta.gov.sg/corp_press_content.asp?start=yivww86x9i5t4jpf9s4plkdid6mc74swzo97f0f0x8o4a616g1 |date=21 June 2011 }}. Land Transport Authority, 20 August 2010
22. ^{{Cite news|url=http://www.straitstimes.com/singapore/transport/downtown-line-3-officially-opened-khaw-announces-plans-to-make-transfers-between|title=Downtown Line 3 officially opens; Khaw Boon Wan announces review of fares incurred when switching between stations|last=Tan|first=Christopher|date=20 October 2017|work=The Straits Times|access-date=|archive-url=|archive-date=|dead-url=}}
23. ^"Downtown Line depot to be located off Woodlands Road", Margaret Perry, Channel NewsAsia, 26 February 2008
24. ^{{Cite Web|url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=2a085a5d-6d2f-46e1-bafc-39cf5340898b|title=Gali Batu Depot|author=Land Transport Authority|date=17 Feb 2015|access-date=1 March 2018}}
25. ^"Downtown Line costs soar by more than 70%", Christopher Tan, The Straits Times, 30 October 2012
26. ^{{cite web|url=http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=38dc4ca3-5e70-4bf8-97bc-87f78e6303e7 | title= Two New Rail Lines and Three New Extensions to Expand Rail Network by 2030 |publisher=Land Transport Authority |date=17 January 2013 |deadurl=yes |archiveurl=https://web.archive.org/web/20140706170425/http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=38dc4ca3-5e70-4bf8-97bc-87f78e6303e7 |archivedate=6 July 2014 |df= }}
27. ^{{cite news|url=http://www.channelnewsasia.com/news/singapore/downtown-line-3-to-open-on-oct-21-8898410|accessdate=31 May 2017|work=Elizabeth Neo|issue=Downtown Line 3 to open on 21 Oct | title=Downtown Line 3 |publisher=Channel NewsAsia|date=1 June 2017}}
28. ^"Thomson–East Coast Line, connecting North and East, ready by 2024" {{webarchive|url=https://web.archive.org/web/20140816071435/http://www.channelnewsasia.com/news/singapore/thomson-east-coast-line/1313898.html |date=16 August 2014 }}, Saifulbahri Ismail, Channel NewsAsia, 15 August 2014
29. ^{{cite web | url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line-extension.html | title=Downtown Line 3 Extension | publisher=Land Transport Authority | date=15 August 2014}}
30. ^{{Cite web|url=https://www.zaobao.com.sg/realtime/singapore/story20190307-937898|title=滨海市区线谦道站料2025年启用|last=|first=|date=2019-03-07|website=早报|language=Chinese|archive-url=|archive-date=|dead-url=|access-date=2019-03-07}}
31. ^{{cite web| title= Platform doors at Botanic Gardens MRT station malfunction, causing 7-hour disruption | url= http://www.channelnewsasia.com/news/singapore/platform-doors-at-botanic-gardens-mrt-station-malfunction-8813298 |website=Channel NewsAsia}}
32. ^LTA Awards 6 Downtown Line Contracts Totalling $1.13 Billion {{webarchive|url=https://web.archive.org/web/20110527043536/http://app.lta.gov.sg/corp_press_content.asp?start=2040 |date=27 May 2011 }}
33. ^Contract 901QP: Terms of Reference, Land Transport Authority, 9 November 2007 (tender document from www.gebiz.gov.sg)
34. ^{{cite web |url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/downtown-line/project-milestones.html | title=First Downtown Line train lands in Singapore |publisher=Land Transport Authority |accessdate=16 November 2013}}
35. ^{{cite web |url=http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=e09e1b35-7714-4701-a370-88699e32543c |title=Shorter Waiting Time With 15 More Trains For Downtown Line |publisher=Land Transport Authority |date=28 March 2013 |accessdate=28 March 2013 |deadurl=yes |archiveurl=https://web.archive.org/web/20130411044401/http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=e09e1b35-7714-4701-a370-88699e32543c |archivedate=11 April 2013 |df= }}
36. ^{{cite web|url=http://www.straitstimes.com/the-big-story/land-transport-masterplan-2013/story/land-transport-masterplan-downtown-line-stage-1-o|title=Land Transport Masterplan: Downtown Line Stage 1 to open on Dec 22|publisher=The Straits Times|accessdate=16 November 2013}}
37. ^{{Cite web|url=https://www.channelnewsasia.com/news/singapore/4-in-1-rail-and-bus-depot-in-east-coast-saved-taxpayers-s-2-9984498|title=4-in-1 depot save taxpayers 2bn|access-date=3 March 2017|date=23 Feb 2018}}
38. ^{{Cite web|url=https://www.channelnewsasia.com/news/singapore/doors-open-on-downtown-line-3-for-preview-ahead-of-oct-21-launch-9312452|title=Doors open on Downtown line 3 for preview ahead of Oct 21 launch|author=Elizabeth Neo|date=15 November 2017|access-date=3 March 2018}}
39. ^{{cite web|url=http://www.invensysrail.com/downloads/595waLu5GfpEF1t.pdf|title=Invensys Rail secures signalling contract for Singapore’s new Downtown Line|publisher=|accessdate=21 August 2016}}{{dead link|date=September 2017 |bot=InternetArchiveBot |fix-attempted=yes }}
40. ^{{cite web|url=http://www.siemens.asia/sg/en/Press/Press-Releases/Siemens-equipped_driverless_underground_metro_line_in_Singapore_starts_operations_for_Downtown_Line_1.aspx|title=Press Releases > Siemens-equipped driverless underground metro line in Singapore starts operations for Downtown Line 1 > Siemens-equipped driverless underground metro line in Singapore starts operations for Downtown Line 1|publisher=|accessdate=21 August 2016}}
41. ^{{Cite web|url=https://www.mobility.siemens.com/mobility/global/SiteCollectionDocuments/en/news/customer-magazines-and-newsletters/como/como-special-issue-en.pdf|title=como special issue|last=|first=|date=|website=|dead-url=|access-date=}}
42. ^{{Cite web|url=http://www.railjournal.com/index.php/signalling/cbtc-testing-starts-on-singapore-downtown-line.html|title=CBTC testing starts on Singapore Downtown Line|last=|first=|date=|website=|dead-url=|access-date=}}
43. ^{{cite web | url= https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=2040 | title= LTA Awards 6 Downtown Line Contracts Totalling $1.13 Billion | date= 7 November 2008}}
44. ^{{cite web|url=http://rpsonline.com.sg/proceedings/9789810863968/html/978-981-08-6396-8_P240.php| title= The Challenges of Delivering the Downtown Line Signalling System |last=|first=|date=|website=|dead-url=|access-date=}}
{{Downtown MRT line navbox}}{{Mass Rapid Transit (Singapore)}}{{Singapore railway lines}}{{Singapore MRT stations}}{{Future developments in Singapore}}{{Urban Rail Transit in ASEAN}}{{DEFAULTSORT:Downtown MRT line}}

5 : Mass Rapid Transit (Singapore) lines|Proposed public transport in Singapore|Buildings and structures under construction in Singapore|Railway lines opened in 2013|2013 establishments in Singapore

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/22 9:30:03