请输入您要查询的百科知识:

 

词条 Edmonton City Hall
释义

  1. Design

  2. Gallery

  3. References

  4. External links

{{Infobox building
| name = Edmonton City Hall
| image = Edmonton City Hall.jpg
| caption = City Hall's main pyramid and fountain. To the left is a cenotaph; in the background is the CN Tower.
| building_type = City hall
| architectural_style = Postmodern
| structural_system =
| cost = {{dollarsign|CAD}}48.9 million[1]
(${{formatprice|{{Inflation|CA|48900000|1992}}}} in {{Inflation-year|CA}} dollars{{inflation-fn|CA}})
| address = {{nowrap|1 Sir Winston Churchill Square}}
Edmonton, Alberta, Canada
T5J 2R7
| client =
| owner = City of Edmonton
| coordinates = {{coord|53|32|44|N|113|29|24.5|W|region:CA-AB_type:landmark}}
| start_date = June 1990[1]
| completion_date =
| opened_date = August 28, 1992[2]
| inauguration_date =
| demolition_date =
| destruction_date =
| height = {{convert|43|m|ft|abbr=on}}
| architectural =
| floor_count = 3
| floor_area =
| main_contractor = Stuart Olson Dominion[3]
| architect = Dub Architects
| structural_engineer =
| services_engineer =
| civil_engineer =
| other_designers =
| quantity_surveyor =
| awards =
| references =
}}Edmonton's City Hall is the home of the municipal government of Edmonton, Alberta, Canada. Designed by Dub Architects, the building was completed in 1992. It was built to replace the former city hall after it had become outdated and expensive to operate.[4]

The Edmonton Transit System Customer Services centre relocated to City Hall in February 2013.[5]

Design

The building features two steel and glass pyramids, one 43 metres high (ground to peak), on top of a three-storey concrete structure. One pyramid provides natural light for the main atrium, the other for the council chambers.[6] The building also features a 200-foot clock Friendship Tower topped with a set of 23-carillon bells.[7] Located on the eastern edge of the financial district in Edmonton's downtown, the building is the main feature on Sir Winston Churchill Square. In the winter, the fountain is converted to a skating rink.

The design for the city hall met with some controversy when it was first announced. The original design called for the building to be topped with four cones. The cones were meant to pay tribute to the tipis that the First Nations once lived in on the site. The design met with negative feedback from the public as they felt it looked like dunce caps and nuclear reactors.[8] Dub Architects then revised their design to replace the cones with the pyramids, with the pyramids designed to be evocative of the Rocky Mountains. The design was received much more warmly by the public, and was dubbed "Pyramid Power" by the press.{{Citation needed|date=July 2011}}

Gallery

References

1. ^{{cite news |last=Jimenez |first=Marina |title=Civic pride swells at opening of city hall |date=August 24, 1992 |newspaper=Edmonton Journal |location=Edmonton, Alberta |page=B1 }}
2. ^{{cite web |url=http://metronews.ca/news/edmonton/350280/edmontons-city-hall-turns-20/ |title=Edmonton’s city hall turns 20 |last=McIntyre |first=Heather |date=August 27, 2012 |work=Metro Edmonton |publisher=Free Daily News Group |accessdate=June 28, 2014}}
3. ^{{cite web |url=http://www.sodcl.com/building/04-civic-&-government/40-edmonton-city-hall.php |title=Edmonton City Hall |publisher=Stuart Olson Dominion |accessdate=June 28, 2014}}
4. ^{{cite web |url=http://www2.canada.com/edmontonjournal/news/story.html?id=53175c9b-cfed-486b-82c5-6bc2c2b4fbba |title=Edmonton's 1957 City Hall |last=Herzog |first=Lawrence |date=August 10, 2011 |work=Herzog on Heritage |publisher=Edmonton Heritage Council |accessdate=June 28, 2014}}
5. ^{{cite web |url=http://www.edmonton.ca/city_government/news/2013/ets-customer-services-centre-moving.aspx |title=ETS Customer Services Moves to City Hall |author=City of Edmonton |date=February 15, 2013 |publisher=City of Edmonton |accessdate=April 10, 2013 |deadurl=yes |archiveurl=https://archive.is/20130628052056/http://www.edmonton.ca/city_government/news/2013/ets-customer-services-centre-moving.aspx |archivedate=June 28, 2013 |df= }}
6. ^{{cite web|url=http://www.cisc-icca.ca/projects/alberta/Edmonton%20City%20Hall/|title=Edmonton City Hall|publisher=CISC-ICCA|accessdate=April 28, 2009 |archiveurl=https://web.archive.org/web/20120207015235/http://www.cisc-icca.ca/projects/alberta/Edmonton%20City%20Hall/ |archivedate=February 7, 2012}}
7. ^{{cite web |url=http://www.edmonton.ca/attractions_events/city_hall/features.aspx |title=Features of City Hall |publisher=City of Edmonton |accessdate=June 28, 2014}}
8. ^{{cite web |url=http://www2.canada.com/edmontonjournal/news/story.html?id=53175c9b-cfed-486b-82c5-6bc2c2b4fbba |title='Our favourite building' puts on a party |last=Kent |first=Gordon |work=Edmonton Journal |publisher=Canada.com |date=August 29, 2012 |accessdate=June 28, 2014}}

External links

  • [https://www.edmonton.ca/attractions_events/city-hall.aspx Edmonton City Hall]
{{Edmonton}}{{Churchill Square}}{{Edmonton landmarks}}

7 : Government buildings completed in 1992|Buildings and structures in Edmonton|Municipal government of Edmonton|City and town halls in Canada|Tourist attractions in Edmonton|Pyramids in Canada|Clock towers in Canada

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/22 1:07:04