请输入您要查询的百科知识:

 

词条 Enagás
释义

  1. References

  2. External links

{{Infobox company
| name = Enagás, S.A.
| logo = Enagás.svg
| logo_size = 150px
| type = Sociedad Anónima
| traded_as = {{BMAD|ES0130960018|ENG}}
| foundation = 1972
| location = Madrid, Spain
| key_people = Antonio Llardén Carratalá(Chairman) and Marcelino Oreja Arburúa (CEO)
| industry = Energy industry
| products = Storage and transportation of natural gas
| operating_income = €668.9 million (2013)[1]
| net_income = €403.2 million (2013)[1]
| num_employees = 1,149 (end 2013)[1]
| homepage = www.enagas.com
}}

Enagás, S.A. ({{IPA-es|enaˈɣas}}, originally an initialism for Empresa Nacional del Gas) is a Spanish energy company and European TSO, which owns and operates the nation's gas grid. The firm also owns four liquefied natural gas regasification terminals in the country,[2] at Huelva, Barcelona, Cartagena and Gijon.[3] In addition, it owns 50% of the plant BBG (Bilbao) and 100% of Gascan. The chairman of Enagás is Antonio Llardén Carratalá and his Chief Executive Officer is Marcelino Oreja Arburúa. The firm's headquarters are located in Madrid. Apart from Spain, Enagás has presence in Mexico, Perú, Chile, Sweden and in the Trans Adriatic Pipeline (TAP) European project.

The company was founded in 1972 by the Spanish Government with the aim of creating a nationwide network of gas pipelines. After privatisation in 1994, Gas Natural acquired a controlling stake in the company. Since Enagás demerged in 2002, Gas Natural gradually decreased its stake to 5%, the maximum allowed for any shareholder by the Government after 30 December 2006.[4] As of 2006, the institutional shareholder was the state-owned holding company Sociedad Estatal de Participaciones Industriales (SEPI) which held 5% of Enagás.[4]

In 2015, about 95% of the company's shares were on the open market.{{cn|date=January 2019}}

In 2011, the €3.1 billion MidCat gas pipeline project between France and Spain was kicked off; a first section near Barcelona was built in 2011-2012.[5] With 7 million in EU support for prestudies the project came to a halt, however. [5] The first part of the pipeline called the South Transit East Pyrenees, or STEP, was to continue the existing line near Barcelona into France for about €440 million, paid mostly by the French partner Teréga, which is recently renamed TGIF by Total. Construction was to start 2019 and be completed by 2022. The second half of MidCat was to reinforce about 800 km of pipelines within France. A 2017 EU report found that MidCat's costs were higher than its assumed benefits.[5]

References

1. ^{{cite web|url=http://www.enagas.es/cs/Satellite?blobcol=urldata&blobheader=application%2Fpdf&blobkey=id&blobtable=MungoBlobs&blobwhere=1146252563657&ssbinary=true |title=Annual Report 2010 |accessdate=2010-04-11 |publisher=Enagás }}{{dead link|date=December 2016 |bot=InternetArchiveBot |fix-attempted=yes }}
2. ^{{cite news|url=http://uk.reuters.com/article/oilRpt/idUKL0762084020080407|title=World's biggest LNG tanker unloads at Enagas plant|last=Roberts|first=Martin|date=7 April 2008|work=Reuters|accessdate=2008-12-31}}
3. ^{{cite web|url=http://www.enagas.com/cs/Satellite?cid=1142417697953&language=en&pagename=ENAGAS%2FPage%2FENAG_mapaInfraestructuras |title=Gas Transmission: Infrastructure |publisher=Enagás |accessdate=2008-12-31 |deadurl=yes |archiveurl=https://web.archive.org/web/20061122050925/http://www.enagas.com/cs/Satellite?cid=1142417697953&language=en&pagename=ENAGAS%2FPage%2FENAG_mapaInfraestructuras |archivedate=2006-11-22 |df= }}
4. ^{{cite web|url=http://www.enagas.com/cs/Satellite?cid=1142417697548&language=en&pagename=ENAGAS%2FPage%2FENAG_pintarContenidoFinal |title=About us: Introduction |publisher=Enagás |accessdate=2008-12-31 |deadurl=yes |archiveurl=https://web.archive.org/web/20061122050953/http://www.enagas.com/cs/Satellite?cid=1142417697548&language=en&pagename=ENAGAS%2FPage%2FENAG_pintarContenidoFinal |archivedate=2006-11-22 |df= }}
5. ^Anca Gurzu [https://www.politico.eu/article/the-franco-spanish-ghost-natural-gas-pipeline-midcat-miguel-arias-canete-enagas/ The Franco-Spanish ghost gas pipeline] Politico, 31 October 2018

External links

  • {{official website|http://www.enagas.com}}
{{Portal|Companies}}{{IBEX-35 companies}}{{DEFAULTSORT:Enagas}}

7 : Natural gas pipeline companies|Natural gas companies of Spain|Companies based in Madrid|Energy companies established in 1972|IBEX-35|1972 establishments in Spain|Companies listed on the Madrid Stock Exchange

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/23 21:21:00