The Global Information Grid Bandwidth Expansion (GIG-BE) Program was a major United States Department of Defense (DOD) net-centric transformational initiative executed by DISA. Part of the Global Information Grid project, GIG-BE created a ubiquitous "bandwidth-available" environment to improve national security intelligence, surveillance and reconnaissance, information assurance, as well as command and control. Through GIG-BE, DISA leveraged DOD's existing end-to-end information transport capabilities, significantly expanding capacity and reliability to select Joint Staff-approved locations worldwide. GIG-BE achieved Full Operational Capability (FOC) on December 20, 2005. ScopeThis program provided increased bandwidth and diverse physical access to approximately 87 critical sites in the continental United States (CONUS), US Pacific Command (PACOM) and US European Command (EUCOM). These locations are interconnected via an expanded GIG core. Capabilities and servicesGIG-BE provides a secure, robust, optical terrestrial network that delivers very high-speed classified and unclassified Internet Protocol (IP) services to key operating locations worldwide. The Assistant Secretary of Defense for Networks and Information Integration's (ASD/NII) vision is a "color to every base," physically diverse network access, optical mesh upgrades for the backbone network, and regional/MAN upgrades, where needed. "A color to every base" implies that every site has an OC-192 (10 gigabits per second) of usable IP dedicated to that site. ImplementationAfter extensive component integration and operational testing, implementation began in the middle of the 2004 fiscal year and extended through calendar year 2005. The initial implementation concentrated on six sites used during the proof of Initial Operational Capability (IOC), achieved on September 30, 2004. The GIG-BE Program Office conducted detailed site surveys at all of the approximately 87 Joint Staff-approved locations and parallel implementation in CONUS and overseas. The GIG-BE Program Office completed the Final Operational Test and Evaluation (FOT&E) at 54 operational sites on October 7, 2005. On December 20, 2005, the GIG-BE program achieved the milestone of Full Operational Capability. ContractGIG-BE was awarded to SAIC in 2001 for $877 million. This contract was for the development, instantiation, and maintenance of the GIG-BE network. SAIC instantly divided the equipment and tasks into subcontracts. These subcontracts are as follows:
Congressional criticRepresentatives Marty Meehan (D-Mass) and Jim Saxton (R-NJ) expressed concern in the selection process for a contractor to lead the GIG-BE effort. They say it was handled "irresponsibly."{{Fact|date=November 2008}} The reason for this as expressed by Meehan's spokesperson Kimberly Abbott is the "whole bidding process wasn't as fair and open as it could have been", because a contractor and not the government led the decision process. SAIC won the contract who eventually handed a large subset of the engineering to By Light. Meehan did stress that he is {{em|not}} questioning the competence of the winners. These two congressman delivered a letter to the DoD regarding the contract but the issue was slowly forgotten{{Fact|date=November 2008}}. See also
References
External links
2 : Grid computing|Military communications |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。