请输入您要查询的百科知识:

 

词条 Greater Winnipeg Water District Railway
释义

  1. History

  2. Physical plant

  3. See also

  4. References

  5. External links

The Greater Winnipeg Water District Railway is a 167-kilometre (102-mile) long industrial railway from Winnipeg, Manitoba to Waugh on Shoal Lake near Manitoba's eastern boundary in Canada. The railway was built between 1914 and 1916 to assist in the construction and maintenance of the aqueduct supplying fresh water to Winnipeg.[1] It is owned by Winnipeg's municipal government.

History

The railway is located 110 feet south of the aqueduct linking Winnipeg to Shoal Lake.[2] After the aqueduct was completed in 1919, the railway did not shut down.[3] Instead, the railway started hauling timber for firewood and paper mills and gravel for construction.[4] In addition, the line began moving rock from various railway-dug quarries along the line.[5]

The railway carried passenger traffic in its early years.[6] Initially, three trains per week carried workers and materials to areas where rail was still being laid. The line was also used by settlers to and from St. Boniface and by home or cottage owners in southeastern Manitoba. The primary cargo was gravel and firewood for the Winnipeg market; the firewood market especially was booming by 1935. Later, the train carried lumber to pulp and paper mills.[7] Passenger service was profitable into the early 1960s.[8] The railway discontinued mixed trains, carrying both freight and passengers, in 1981 and today is freight-only.[9]

Gravel trains were discontinued in 1992, when a concrete manufacturer, Supercrete, shut down its pit at Ross, Manitoba.[10]

Recently, Winnipeg officials folded the railway's operations into the city's Water and Waste Department.[11] As a result, the railway has been assigned the task of maintaining and providing security for the aqueduct.[12] It also takes workers and supplies needed for the aqueduct and hauls supplies to the water intake facility at Shoal Lake, returning with contaminated materials.[13]

Physical plant

The GWWD Winnipeg terminal and facilities are located at 598 Plinguet St. in St. Boniface. The railway's offices are housed in a former passenger depot, although the GWWD no longer operates passenger trains.

See also

{{Portal|Railways}}
  • American Water Landmark - the Winnipeg Aqueduct, Greater Winnipeg Water District (awarded in 1985).

References

1. ^Lacey, Peter. "The Muskeg Limited...The First 80 Years of the Greater Winnipeg Water District Railway." (Friesen Printing, Ltd., 1994). {{ISBN|155056286X}}.
2. ^Trains magazine, March 2013, p. 34.
3. ^Trains magazine, March 2013, p. 34.
4. ^Trains magazine, March 2013, p. 34.
5. ^Trains magazine, March 2013, p. 34.
6. ^Trains magazine, March 2013, p. 36.
7. ^{{cite web |url=http://www.winnipeg.ca/waterandwaste/dept/railway.stm |title=The Greater Winnipeg Water District Railway |date=24 February 2014 |website=Winnipeg - Know Your Zone |publisher=City of Winnipeg |access-date=27 December 2015}}
8. ^Trains magazine, March 2013, p. 36.
9. ^Trains magazine, March 2013, p. 36.
10. ^Trains magazine, March 2013, p. 36.
11. ^Trains magazine, March 2013, p. 37.
12. ^Trains magazine, March 2013, p. 37.
13. ^{{cite web |url=http://www.winnipeg.ca/waterandwaste/dept/railway.stm |title=The Greater Winnipeg Water District Railway |date=24 February 2014 |website=Winnipeg - Know Your Zone |publisher=City of Winnipeg |access-date=27 December 2015}}

External links

  • Greater Winnipeg Water District Railway
{{Canada railways}}{{DEFAULTSORT:Greater Winnipeg Water District Railway}}

2 : Manitoba railways|Industrial railways

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/13 12:31:23