请输入您要查询的百科知识:

 

词条 Halton Railway
释义

  1. References

{{short description|Disused Buckinghamshire railway line}}{{use British English|date=July 2017}}{{use DMY dates|date=July 2017}}

Halton Railway was a spur line from Wendover[1] to RAF Halton[2] used to transport coal and other goods to RAF Halton. It closed in 1963.

Opened in 1917 after an eight-week construction period, the branch line ran for {{Convert|1.75|mi|km}} and was constructed by German prisoners of war during World War I.[3] The railway was originally built to carry building materials into the site for construction of the workshops and other units. It also forwarded coal to the boilers on camp. It was later converted from a narrow gauge of {{convert|23.5|in}} to standard gauge and was used to bring timber out of Halton woods. The conversion of boilers on the station from coal fired to oil fired, allowed road-tankers to take over the inward flow of fuel and accelerated the demise of the railway and the last train ran on 29 March 1963 with closure following two days afterwards.[3][4]

The majority of the track has since been removed, including the original bridge over the Grand Union Canal which was replaced by a modern footbridge, however much of the line is designated a permissive footpath.

References

1. ^{{Coord|51.7630|-0.7401|display=inline|region:GB_scale:5000}}
2. ^{{Coord|51.7695|-0.7278|display=inline|region:GB_scale:5000}}
3. ^{{cite web|title=RAF - Halton Railway|url=https://www.raf.mod.uk/rafhalton/aboutus/haltonrilway.cfm|website=www.raf.mod.uk|accessdate=31 July 2017}}
4. ^{{cite web|title=Twentieth century railway from Wendover to Halton Camp, now disused|url=https://ubp.buckscc.gov.uk/SingleResult.aspx?uid=MBC24945|website=buckscc.gov.uk|accessdate=31 July 2017}}
{{England-rail-transport-stub}}

1 : Closed railway lines in South East England

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/24 20:32:37